Loading...
HomeMy WebLinkAbout1991-03-13 - AGENDA REPORTS - ROTUNDA DRIVE PROJ 90 8 BIDS (2)CONSENT CALENDAR DATE: March 13, 1991 SUBJECT: ROTUNDA DRIVE DEPARTMENT: Public Works f BACKGROUND AGENDA REPORT City Manager Approval Item to be presented by: John E. Medina AL (PROJECT NO. 90-7) - ADVERTISE FOR BIDS Project No. 90-7 provides for resurfacing and structural repairs to extend the service life of those streets identified on the attached key map. Council previously approved Resolution 90-83, which provided for the inclusion of this project for State/Local Partnership (SB 300) grant funding. Although final reimbursement under the State/Local Partnership Program is based upon the number of eligible projects statewide, it appears at this time that the City's share will be between 10 and 15 percent of the contract cost. Plans and specifications for this project have been completed and are available for review in.the offices of the City Clerk and the Director of Public Works. Currently $243,000 is budgeted under Account No. 25-96018-227 to cover all costs associated with the project; however, based on pavement tests performed during the design of the project, it was determined that specific roadway sections have deteriorated to the point where removal and reconstruction of those roadway sections is required. The Engineer's revised estimate to complete this project is $365,000. Project limits could be reduced to the point where the Engineer's estimate will fall within budget. However, it has also been determined that Gas Tax revenues are' available to cover the difference between the budget and revised estimate. Public Works recommends proceeding with the project as shown on the key map to preclude the need for costlier reconstruction in the future. 1. Approve the plans and specifications for the project, and authorize the advertising for bids. 2. Approve increasing the budget for this project from $243,000 to $365,000; the difference to be funded with Gas Tax monies. ATTACHMENT Key Map ��/!-/���jJ /j cd=53 Agenda ltem.--d PPOJEC T V - 7 KEY MAP d F - z LPLA7A s LUNETA ENO OF OVERLAY - -INDICATES STREET TO BE OVERLAID 0 EVANS AVE. I I -INDICATES STREET TO BE OVERLAID 0 EVANS AVE.