Loading...
HomeMy WebLinkAbout1991-05-14 - AGENDA REPORTS - VETERANS FLAG MEMORIAL (2), AGENDA REPORT City Manager Approv Item to be presented by: Jeff Kolin NEW BUSINESS DATE: May 14, 1991 SUBJECT: VETERANS FLAG MEMORIAL AT CANYON COUNTRY PARK (PROJECT NO. 90-21) - BID AWARD DEPARTMENT: Parks and Recreation JLk_,4 tJ BACKGROUND Council previously approved the concept of a veterans flag memorial at the regularly scheduled Council meeting of April 23, 1991. Subsequently, at the Council Study Session of May 1, 1991, Council authorized staff to solicit bids for the construction of this memorial. Council further authorized that funds not to exceed 1/2 of the total cost of this memorial or $40,000, whichever is less, be set aside in Capital ProjectsAccount 25-99016-227 for this purpose. Council has expressed a desire to have the memorial completed, if at all possible, by the 4th of July. In order to support this rigorous schedule, "fast -tracking" of the overall project is required. Fast -tracking is a phased -construction approach where portions of a project are constructed as various design packages are completed. One portion of the project design has been completed, and bids have been solicited. This portion of the project consists of construction of the foundation of the memorial along with associated site improvements; but does not include the procurement and erection .of the flag, the stone slabs, and site lighting. These remaining items will be provided under separate contracts. The bid opening for this first portion of the project is scheduled for May 14, 1991. Since results of this bid opening.will not be made available in time to support the preparation of this agenda report, it is respectfully proposed that bid results and staff recommendation for proceeding with the project be provided orally at -this Council meeting. RECOMMENDATION Receive an oral report concerning the status of this memorial, and direct staff accordingly. AGN 444 AgOnda Item: AGENDA REPORT City Maffager Approval v Item to be presented by: NEV BUSINESS DATE: MAY 14, 1991 SUBJECT: VETERANS HISTORIC MEMORIAL DEPARTMENT: PARKS AND RECREATION �. BACKGROUND Jeff Kolin As indicated in the agenda report, bids .were opened today for the construction of a portion of the Veterans Historic Memorial at Canyon Country Park. This phase of construction includes all the earthwork and concrete work necessary to prepare the site for the flag pole, granite stone slabs and site lighting. The stone, flag pole and lighting will be provided under a separate contract. A total of four bids were submitted for this phase of the project. Steven R. Rodgers General Engineering and Building contractor was the lowest responsible bidder with a total bid of $19,689. Council had expressed at its May 1, 1991, study session that matching funds, not to exceed $40,000, will be provided by the City. The remaining funds would be provided through contributions and donations obtained through the memorial committee. Currently, there have been no matching funds submitted to the City. There are two options available to Council. One options is to postpone award of contract until such time as:matching funds are available, up to a period of 45 days. After 45 days, current bids would be rejected if matching funds are not available at that time. The second option is to award the bid to begin the first phase of construction and assume the responsibility for paying the contractor in full the contract price, if matching funds are not raised by the citizens' committee. RECOMMENDATION Review the information provided in the oral and written report and direct staff accordingly. JCK:WW: jat PRCOUNC:21 Continued To. s --5�/