Loading...
HomeMy WebLinkAbout1992-01-14 - AGENDA REPORTS - I 5 RD WIDENING PROJ 89 13 (2)AGENDA REPORT City Manager App Item to be CONSENT CALENDAR DATE: January 14, 1992 SUBJECT: LYONS AVENUE EAST OF I-5 ROAD WIDENING (PROJECT 89-13) - PROJECT ACCEPTANCE DEPARTMENT: Community Development BACKGROUND On January 8, 1991, Council awarded a contract for the subject project to Berry General Engineering Contractors, Inc. This project was completed to the satisfaction of the Director of Community Development on December 2, 1991 for a total construction cost of $69,405.62. The construction period was extended and total project costs were exceeded by approximately $34,000 due to lead -impacted soils encountered at the drainage easement area of the project. It should be emphasized that these costs were held to the absolute minimum necessary to mitigate this problem. In fact, laboratory treatment costs alone were - originally estimated to be twice this amount, but were reduced significantly ($30,000 to $45,000) through the perseverance of the Department's engineering division. RECOMMENDATION 1. Accept the work performed by Berry General Engineering Contractors, Inc. 2. Direct the City Clerk to file the attached Notice of Completion for the project. 3. Direct Staff to release the 10 percent retention 35 days after the Notice of Completion is recorded, provided no stop notices as provided by law have been filed. ATTACHMENT Notice of Completion of Public Improvement and Work AGN/576 APPROVED Agenda Item: N 9 When recorded please return to: Donna Grindey, City Clerk City of Santa Clarita 23920 Valencia Boulevard, Suite 301 Santa Clarita, California 91355 NOTICE OF.COMPLETION OF PUBLIC IMPROVEMENT AND WORK NOTICE IS HEREBY GIVEN that the City of Santa Clarita, Los Angeles County, California, has caused a public improvement, to wit: PROJECT N0: 89-13 LYONS AVENUE EAST OF I-5 ROAD WIDENING to be constructed upon the property hereinafter described. The contract for furnishing of all plant, .labor, services, materials and equipment and all utilities and transportation, including .power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner in strict accordance with the specifications, plans, and drawings therefore'on file in the office of the City Clerk of the City of Santa Clarita, for the is construction, installation, and completion of the above described public improvement and work, was heretofore made and entered into with Berry General Engineering Contractors, Inc. on the 29th day of January, 1991, and filed for record in the office of the City Clerk of the City of Santa Clarita; that the work upon said public improvement was actually completed on the 26th day of November, 1991 and that the Director of Community Development has notified the City Council that she has made and completed a final inspection of the materials furnished and installed and the work performed in the construction, installation and completion of said public improvement hereinabove more particularly described and set forth, and has certified in writing to the City Council that all of the provisions of the contract and contract documents for the furnishing of all plant, labor, services, materials and .equipment, and the performing of all work necessary for the construction, installation and .completion of said public improvement above described have been fully complied with to her satisfaction as required by the contract documents; that final acceptance of the construction, installation and completion of saidpublic improvement above described was made on the 2nd day of December, 1991 that the nature of the title to said property of said City of Santa Clarita is as follows -- that is to say, it owns said public improvement in fee except for the right-of-way upon which it is constructed, and that it owns an easement upon, over and along said right-of-way for the purpose of the construction, installation, and completion of said public improvement hereinabove described and theusethereof after said completion; that the property hereinabove referred to and on which said public improvement is situated is described as follows: 0 LYONS AVENUE FROM STATION 28+63.60 TO STATION 32+00 1] NAME OF SURETY ON MATERIAL AND LABOR BOND: Fidelity and Deposit Company of Maryland 225 South Lake Avenue, Pasadena, California 91101 DATED this day of , 19 Jill Rlajic, Mayor City of Santa Clarita STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES) ss CITY OF SANTA CLARITA) I certify or declare that under penalty of perjury that the. foregoing is true and correct. ATTEST: Donna M. Grindey, City Clerk City of Santa Clarita Date