Loading...
HomeMy WebLinkAbout1992-02-25 - AGENDA REPORTS - LYONS AVE CENTERLINE ALIGNMENT (2)City Manager -Approval _[[[/ Item to be presented b UNFINISHED BUSINESS Lynn M. Harris; DATE: February 25, 1992 SUBJECT: LYONS AVENUE EXTENSION/CENTERLINE ALIGNMENT DEPARTMENT: Community Development BACKGROUND As a. follow-up of the Lyons Avenue Extension Project Report, the Council directed staff to focus on a precise alignment for the roadway. This was to be the first phase of completing the added information requested by the Council. Due to the time constraints to develop this precise alignment, alignment study maps are not included with this item but will be presented to the Council at the meeting. The alignment will be similar to the one that was presented in the project report and will include more detailed information. The Lyons Avenue extension is. shown as a secondary highway with 84 feet between the limits of the right-of-way. This roadway section will provide two lanes of traffic in each direction, a pedestrian area outside of the traveled way and provisionsfora center median and left -turn pockets. The roadway has been designed with the appropriate horizontal curves- and grades up and down which would support a design speed of 40 miles an hour. This will translate to a posted speed of 35 mph when the roadway is completed. This design speed was selected in order to provide minimum disruption of the hillsides and existing development currently existing in the area. The alignment was plotted based on aerial photography, survey data and available records showing individual properties. We will also present an overlay which will show the limits of cut -and -fill slopes necessary to complete and implement this roadway system. We have provided two schematics showing the extension in the area of San Fernando Road. Scheme A shows an L-shaped intersection with a possible extension of Lyons Avenue and/or Rio Vista northerly at some future date. Scheme B shows a connection with San Fernando Road and the Lyons Avenue extension curving in an easterly direction through Placerita Canyon. Also shown on Scheme B is a possible future connection with Rio Vista Road, if that is proposed at some future date. We have shown this connection in recognition of the fact that Rio Vista Road is still shown on our Circulation Element. Our purpose is to indicate that both schemes could be constructed and yet still serve future Circulation Element roadways which may be constructed. We believe that either scheme is suitable as it relates to future roadway extensions; however, we prefer Scheme B because it provides better traffic circulation through the intersection if Rio Vista is delayed for some time or is deleted at some future date from the Circulation Element. Agenda item: Continued�- LYONS AVENUE EXTENSION/CENTERLINE ALIGNMENT Page 2 If the Council approves this alignment or approves an alignment with some modifications, we have .the necessary data to provide the location for the Lyons Avenue extension as it relates to each property in Placerita Canyon. Therefore, we could provide exact information to reserve right-of-way as a condition of future development in the area. This will certainly take away the uncertainty of where the Lyons Avenue extension will be constructed. Since we did not want to rush the public participation process, we feel that the Council should review this alignment study, approve it or approve it as modified, and direct staffto conduct some public meetings to secure additional public input on the alignment. We would then return to the Council with the necessary documentation and resolutions, if necessary, to establish an alignment for the Lyons Avenue extension. Approve the alignment in concept as presented or as modified for the Lyons Avenue extension and direct staff to conduct public meetings for public input on the project. Direct staff to return with the results of the public participation program and a final recommendation for alignment for the Lyons Avenue extension. ATTACHMENTS Scheme A Scheme 8 hds:602 ER��YOAJ RDAp o <-> �z I&- y9� r 0 -v lI-EXISTING EUILDIdiGS d m LYONS i4VENUE E X TE NS I M SC//Z-ML ''4 FEB. /4, IM Lg— EI 2 T 111G EOIL Dl tiCS L YDNS AVENUE E SCHEME B /YS/0%V FEB, 14, mg