Loading...
HomeMy WebLinkAbout1992-08-25 - AGENDA REPORTS - SC TRANS SERVICE CHANGES (2)AGENDA REPORT City Manager Apprc Item to be presented NEW BUSINESS DATE: August 25, 1992 SUBJECT: PROPOSED SANTA CLARITA TRANSIT SERVICE CHANGES FOR OCTOBER 26, 1992 DEPARTMENT: Public Works BACKGROUND On October 26, 1992 Metrolink Commuter Rail Service will begin operating between Santa Clarita and Los Angeles Union Station. To coincide with that date, the Santa Clarita Metrolink Station will become the hub of the local transit system, both to facilitate bus -to -bus transfers as well as bus -to -rail connections. The proposed changes in transit service are for the most part precipitated by the relocation of the transit hub from River Oaks Shopping Center to Metrolink. In addition, some minor service extensions are proposed and some other changes due to safety concerns are being considered. SUMMARY OF PROPOSED CHANGES 1. Routes 10/20 which operate on Soledad .Canyon Road out to Shadow Pines would be combined with routes 60/70 which operate to Val Verde and Castaic. This results in a single route connecting Canyon Country and Metrolink with Valencia Town Center, Valencia Industrial Center, Val Verde and Castaic. 2. Routes 15/25 which serve Valencia would be extended from the Valencia Town . Center to Metrolink. These routes would no longer be combined with routes .10/20; however, there would be a timed transfer at Metrolink. Route 15 would also be extended to serve the Newhall Senior Center. 3. Routes 30/40 which serve the Saugus area would be extended to Metrolink. These two routes would continue to serve Valencia Town Center. Route 40 may be extended to LARC Ranch if Los Angeles County certifies that the bridge leading to the ranch can withstand bus traffic. /L& Agenda Item: Proposed Santa Clarita Transit Changes for October 26, 1992 August 25, 1992 Page 2 4. Route 35/45 - these routes would be extended to Metrolink from Valencia Town Center. Also under consideration is eliminating service on Placenta Canyon (Route 45) and Valley and Maple (Route 35) due to safety concerns and low ridership. Instead, Route 35/45 would be consolidated into a single route and extended up Lyons to "Hamburger Hill" which is also the location of a new apartment complex and the Amtrak bus stop. Route 50/55 would operate to Metrolink instead of Valencia Town Center. These two routes would be consolidated into one route eliminating the segment of service along Soledad Canyon Road between Metrolink and Whites Canyon. This segment duplicates service provided by lines 10/20. Frequency of service would improve from every 90 minutes to every 60 minutes. 6. Route 799 - the commuter bus to Los Angeles would add a stop at the Metrolink Station. The inbound route in Los Angeles would return to 7th Street. Buses were shifted from 7th Street to 6th Street to accommodate Metro Rail construction which is now complete. 7. Stevenson Ranch - Los Angeles County has agreed to fully fund tripper service between Stevenson Ranch and various schools in Santa Clarita. This service would probably start in September 1992. STAFF ACTIONS Staff is currently preparing draft schedules and maps and will seek public input at three town meetings during the fust half of September. Proposals will be revised based on public input so that new schedules can be printed and distributed at least one week in advance of the service changes. (See attached Public Participation schedule). RECOMMENDATION Receive and file. ATTACHMENT Public Participation Schedule RK:gmm transvc.agn SCHEDULE OF PREPARATION PROPOSED SERVICE CHANGES OCTOBER 26, 1992 Review and Rewrite Preliminary Schedules; Analyze School Needs 8/10-8/14 Develop Stevenson Ranch Route 8/10-8/14 Prepare and Advertise RFP for Timetable Graphics 8/10-8/14 Prepare for Town Meetings 8/17-8/21 Advertise Town Meetings On Board Newspaper Direct Mail (Service Change Areas) 8/24-9/8 Conduct Town Meetings 9/8-9/11 Revise Schedules & Maps Based on Input from Town Meetings 9/14-9/18 Direct Graphics & Printing of New Timetables 9/18-10/19 Distribute New Timetables; Publicize Changes 10/19-10/26 Implement New Fixed -Route Service 10/26/92