Loading...
HomeMy WebLinkAbout1993-05-25 - AGENDA REPORTS - FY 92 93 ANNUAL OVERLAY PGM (2)r AGENDA REPORT City Manag Item to be CONSENT CALENDAR 14 --Anthony J. Nisich,(}11�( � DATE: May 25, 1993 SUBJECT: FY 92-93 ANNUAL OVERLAY PROGRAM - (PROJECT NO. 96-072) BID AWARD DEPARTMENT: Community Development BACKGROUND On March 23, 1993, Council authorized the advertisement of the subject project. The project provides resurfacing for portions of Rockwell Canyon, Wiley Canyon, Lyons Avenue, Soledad Canyon and Bouquet Canyon Roads. To ensure a competitive bid process, this project was advertised with two bid alternatives. Alternative "A" calls for Asphalt Rubber Hot Mix (ARHM), while Alternative 'B" specifies Asphaltic Concrete (AC) pavement. On May 18, 1993, the following bids were received by the City Clerk: COMPANY ALTERNATIVE A (Asphalt Rubber Hot Mix) Boras Resources, Inc. - Pomona Manhole Adjustors - Monterey Park Excel Paving Company - Long Beach ALTERNATIVE B (Asphalt Concrete) ESTIMATED BID AMOUNT PREP WORK TOTAL $1,015,712.46 $44,000 $1,059,712.46 $1,065,989.25 $44,000 $1,109,989.25 $1,585,869.06 $44,000 $1,629,869.06 Granite Construction Company - Palmdale $951,415.00 $166,000 $1,117,415.00 Boral Resources, Inc. - Pomona $980,419.06 $166,000 $1,146,419.06 Excel Paving Company - Long Beach $1,042,980.70 $166,000 $1,208,980.70 Industrial Asphalt - Irwindale $1,069,832.89 $166,000 $1,235,832.89 Prior to resurfacing these streets, both alternates will require prep work consisting of repairing severe cracking, damaged pavement, and structural repairs. The estimated cost for the prep work for Alternate "A" Is approximately $44,000, and $166,000 for Alternate 'B". The prep work for Asphalt Rubber Hot Mix (ARHM) Is approximately $122,000 less than conventional asphalt concrete, because the rubber binder In ARHM provides a material with greater resilience and flexibility, requiring minimal repair to damaged pavement. The lowest bid for Alternate "A," Including prep work, Is $1,059,712.46 by Boral Resources, Inc. The lowest bid for Alternate "B," including prep work, Is $1,117,415.00 by Granite Construction Company. Therefore, staff recommends Alternate "A, ARHM, because of Its lower costs, and Industry studies have concluded that ARHM Is an environmentally safe material. APPROWED Agenda Item: PROJECT NO. 96-072 May 25, 1993 - Page 2 A total of $1,035,000 is currently budgeted In Account No. 25-96072.227 for design, contract administration, Inspection, and construction of this project. In order to stay within the approved budget, the City has the option to modify the scope of work pursuant to the stipulations in the project specifications. Staff recommends that the project be awarded to Boral Resources, Inc., the low bidder, and that the limits of work be reduced to ensure that the total project Is within the currently approved budget. Boral Resources, Inc., possesses the necessary State contractor's license and Is a member In good standing. This Contractor has completed similar projects for other agencies, and the references Indicated that the Contractor performed satisfactory work. RECOMMENDATION 1. Authorize staff to modify the scope of work to stay within the approved budget. 2. Award the contract to Boral Resources, Inc., In the amount of $955,000.00. ATTACHMENT Key map RPN:hds coundiNprMa.07P M . ::. �• ,'orf• �, �...f; r.: 9V,�:. al .sac, 1 do :� f-1 ljj:�-t E• a LW �.✓''t \L��'� . I 7ff , � •. P�le�l llll�.Y3///�6 � 7 ! �... � S ♦ 'i "��� \,` _ _ a f `b a •• � Sa _ - 6 c n k x A dB 1 � b 7 • t � .`�a��`a �� ( .,�'• a d t � •fir .3.. ':r' 1 ••f f w . i r s •' -� 1\ 1 cr . 3�s 1 �/J ! jj �1♦( Ant � ^I�_ •� 1 I I —1p"e vale I Yan. UN i �y ej f4 !'= t •,t , y♦�•✓- • • - a ttl } '' f i � hY••� a L�e1-,` f ��a q' 1'w� �: .a. .' 3 ��y ,. .•: 1• •/ I - .,�-{,�� -� ,, r _SANTA CLARITA_�__ _• t . e-4� ... ..cb a\fir: t e�• I �_. 1 l q ,t, \ C Www` ' ; tt� �� �- ' Q - FJ� • , ' q `• 1 \1 i t/,•w..r t f.flte�~a\e.jr •'� s � ii;� �+ .f,I rr a '• `.. •: _�• � ..---__--y .i We 7. %�..r�•'...s ate.' ;',. '`' +'.: e,.•• «.1\1 \\ 1\a ,J +.,•,.,, �\ , lz ..An, +IfaawlfrCu• =r•, ♦�w� �k 'a - •.e�'r.�w• .p e " a •ai .fL •• i,~� ...a 13 I` 1eyD- \�• /. •ic•`. �•`-��tir.��i2-\93 T �.�i:� e\ �1�� 1 •' _—'�- � _.yin is �,•. ` r ..' r�/ � ♦` � '4 QJ �.it� n\\ '`rat. °� a..-; .3 1 .• r._. � S° .. � \ . ..... \�an CJs � i; '<'. � i . •