Loading...
HomeMy WebLinkAbout1993-11-23 - AGENDA REPORTS - SOLEDADCYN (2)NEW BUSINESS DATE: SUBJECT: DEPARTMENT: BACKGROUND AGENDA REPORT City Manager Approve Item to be presented Anthony J. NisichLDl"a November 23, 1993 CONCEPTUAL APPROVAL FOR ESTABLISHING A MAINTENANCE DISTRICT FOR TWO UNDERCROSSINGS UNDER THE EXISTING RAILROAD TMCKS ALONG SOLEDAD CANYON ROAD TO ACCESS A LAND -LOCKED PARCEL Community Development The City was approached by the property owner (Penton Properties) of the land -locked parcel shown on the attached sketch to form a district to cover the cost to operate and maintain two proposed undercrossings for the benefit of the property. The property was land -locked due to the realignment of the railroad tracks near Soledad Canyon Road and Penlon Road.- Penton has approached the City at the request of the Metropolitan Transportation Authority (MTA), Southern California Regional Rail Authority (SCRRA) and the Public Utilities Commission (PUC), who require the construction applicant for new railroad crossings be a public agency. The construction of the two undercrossings are part of the proposed settlement between the property ownerand the MTA, SCRRA and Southern Pacific Transportation Company (SPTC) to meet the concerns of all the parties Involved. The City may be able to incorporate appropriate language Into the settlement to protect the City from construction liability, tort liability and direct maintenance costs due the construction of the undercrossings. The district would provide for the cost of maintenance for the undercrossings. The property owner will do all of the processing and pay all of the fees associated with processing the application. Staff has given a conceptual approval for the locations of the two railroad undercrossings shown on the attached sketch. RECOMMENDATION 1: Authorize staff to negotiate with the MTA, SPTC and Penlon to Include In the settlement agreement the requirements that Penton will construct the undercrossings at no cost to the City and that the City will through, the appropriate district, maintain the undercrossings.' 2. Provide direction to staff that the settlement agreement and maintenance district shall Insulate the City from construction Ilabiltty, tort liability and direct maintenance costs for the undercrossings. 3. Approve In concept the formation of the district to maintain the undercrossings upon completion of the construction, and authorize the City to be the applicant of record for processing the approvals through the MTA, SCRRA, SPTC and the PUC. ATTACHMENT Exhibit A RGN:hds Continued To: ja-/y--9� pee ahem: counci�penlon.rgn Conti EXHIBIT A 0•/.1.14 f/ CITY OF SANTA CLARITA PENLON PROPERTY PROPOSED RAILROAD BRIDGE LOCATIONS ORYCLIFF ST' M.S J A E ST • PLEA � s r a �< r e• CN -LA tirr p \ \ .. f0o f \\ W 6 � a 0 1 �� � '• TIII�T q S2F ` PENLON CANY pH .`. -I o PROPERTYMN F < b IEo,Cr = R Py oo a CAL Ott. RD SaLf0A0 :Zzm. - «-n .� nEtt C'CE.C. fC •\\ z \ � vJ L. i 4O _ Cr Al 11 1 .. wr JI/ �El1I/�FTN JI/ 1 all J ISI/ i l \3 1! f� - ` COLLI• ` 0.p BRUGES ® PROPOSED DRIVEWAY NEO>iI�:E1(HBILFitY ® PROPOSED BRIDGE UNDER R.R. TRACKS