HomeMy WebLinkAbout1993-12-14 - AGENDA REPORTS - TRAFSIG PHASE2 PROJ (2)AGENDA REPORT
CONSENT CALENDAR
DATE: December 14, 1993
AftyManger Approva
Item to be presented by:
Anthony J. Nlsicl�k
T
SUBJECT: MEMORANDUM OF UNDERSTANDING FOR THE LYONS AVENUE TRAFFIC
SIGNAL INTERCONNECT, SIERRA HIGHWAY RESTRIPING AND SOLEDAD
CANYON TRAFFIC SIGNAL INTERCONNECT (PHASE II) PROJECTS
DEPARTMENT: Community Development
BACKGROUND
The Los Angeles County Metropolitan Transportation Authority (LACMTA) has awarded street
improvement grants totaling $784,000 for the above projects. MTA procedures require that a
Memorandum of Understanding (MOU) be executed and that Council certify that matching fundswill
be made available to complete each project. The status of the three projects is provided below.
Lyons Avenue Signal Interconnect
• The local matching funds required for this project ($168,000) have been set aside in a TDA
Article 8 Grant match account for FY 1993-94.
• The LACMTA has awarded a $251,000 discretionary grant for this project for use in FY 1993-94.
• Staff estimates that the total cost for this project will be $419,000.
• It Is anticipated that $120,000 will be utilized in FY 1993-94 for design work. The remaining
funds will be needed in FY 1994-95.
Sierra Highway Restrlpe
• The local matching funds required for this project ($110,000) have been set aside in a TDA
Article 8 Grant match account for FY 1994-95.
The LACMTA has awarded a $328,000 discretionary grant for this project for use in FY 1994-95.
• Staff estimates that the total cost for this project will be $438,000.
Soledad Canyon Interconnect - Phase II
• Local matching funds required for this project ($69,000) have been set aside In a TDA Article 8
grant master account for FY 1994-95.
Adopted: /J N—�3APPROVED
9genaem:
RESOLUTION NO. 93-165
December 14, 1993 - Page 2
• The LACMTA has awarded a $205,000 discretionary grant for this project for use In FY 1994-95.
Staff estimates that the total cost for this project will be $274,000.
RECOMMENDATION
1. Adopt Resolution No. 93-165, certifying that matching funds will be made available to complete
the subject projects and authorizing the City Engineer to execute the necessary Memoranda of
Understanding on behalf of the City.
2. Authorize a budget adjustment for the Lyons Avenue Signal Interconnect as follows:
From To Amount
16-95999-227 16-96076.227 $48,000 TDA Match
17.2520 17-96076-227 $72,000 LACMTA Grant
17-2510 17-3579 $72,000 LACMTA Grant Revenue
The remaining Match and Grant funds will be requested In FY 1994.95.
ATTACHMENTS
Resolution No. 93-165
Note: The following Memoranda of Understanding are available in the reading file In the City
Clerk's office:
1. Memorandum of Understanding for the State Route 126/Interstate 5 CMP Access
Corridor Interconnect (Lyons Avenue).
2. Memorandum of Understanding for the Sierra Highway/State Route 14 Congested
Corridor Restriping.
3. Memorandum of Understanding fortheMetrolink Corridor Interconnect (SoledadCanyon
Road Phase 11).
AH:hds
counc]VmOlIGSsh
RESOLUTION NO. 93-165
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA CLARITA, CALIFORNIA
CERTIFYING THE AVAILABILITY OF FUNDS FOR SPECIFIC PROJECTS
WHEREAS, the Los Angeles County Metropolitan Transportation Authority (LACMTA) Is
responsible for the administration of funds for transportation improvement purposes; and
WHEREAS, the LACMTA approved a one-time appropriation of Funds for Fiscal Year 1993-94
and 1994-95 for the State Route 126/Interstate 5 CMP Access Corridor Interconnect (Lyons Avenue
Interconnect), Sierra Highway/State Route 14 Congested Corridor Striping (Sierra Highway Striping),
and Metrolink Corridor Interconnect (Soledad Canyon Road Phase II Interconnect).
WHEREAS, the City of Santa Clarita (Grantee) Is an eligible funds recipient and desires to
receive the Funds from LACMTA for these Projects; and
WHEREAS, all contracts for financial assistance will Impose certain obligations upon the
Grantee, Including the responsibility for providing local Project cost matches; and
WHEREAS, the City of Santa Clarita has the ability to allocate, and agrees to commit the
necessary matching funds to ensure completion of these Projects
THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA CLARITA does resolve as
follows:
Section 1. That the City of Santa Clarita certifies that the local match funds necessary to
ensure completion of those projects will be made available.
Section 2. That the City Engineer Is authorized to execute, on behalf of the City of Santa
Clarita, the applicable Memoranda of Understanding for these Projects.
PASSED, APPROVED AND ADOPTEDthis day of 1993.
Mayor
ATTEST:
City Clerk
RESOLUTION NO. 93.165
December 14, 1993 - Page 2
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) §
CITY OF SANTA CLARITA )
I, Donna M. Grindey, City Clerk, DO HEREBY CERTIFY that the above and foregoing Resolution was
duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on
the day of . 1993 by the following vote of Council:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
City Clerk
AH:hds
COYMI(Y89116$.BFI