Loading...
HomeMy WebLinkAbout1993-03-23 - AGENDA REPORTS - TRANS GRANTS (2)NEW BUSINESS DATE: SUBJECT: DEPARTMENT: BACKGROUND AGENDA REPORT March 23, 1993 City Manager Approval Item to be presented by, Lyn'ri M. arris f �Nf/ Transportation Grants: MTA Call for Projects Community Development . The Metropolitan Transportation Authority (MTA) Issued the 1993. Call for Projects, and the City will be completing grant applications to compete for the available grant dollars. The City competed In this process last year, and won nearly $3.5 million dollars to widen the bridge at Camp Plenty, .restripe Soledad Canyon Road to six lanes, interconnect signals, Install bicycle lockers at the Metrolink platform, and construct portions of the Soledad Commuter and Bouquet Canyon bike trails. The City is now in the process of completing the Memorandums of Understanding on these projects. The City's success was due, In large part, to packaging a series of multi -modal projects to increase accessibility to the Metrolink service and providing sizable matching funds. City staff are coordinating with members of the MTA North County/San Fernando Area Team, other jurisdictions, and surrounding property owners to assess the viability and competitiveness of a variety of grant proposals. To succeed, projects must demonstrate regional benefits. As a result, staff is concentrating on relating projects In three primary regional corridors: The Metrolink Access Corridor—this is the Valencia Boulevard/Soledad Canyon Road corridor, and staff proposes to propose improvements to further enhance access to the Metrolink Station/Transit Center. The Sierra Highway CMP/Congested Corridor—Sierra Highway can be considered a candidate corridor by definition because it is Included on the MTA's Congestion Management Highway Network and the MTA's Congested Corridor Action Plan. The Route 126 MUltl-Modal Corridor --The existing State Route 126, comprised of Magic Mountain Parkway and San Fernando Road between the 1.5 and 14 Freeways, is also on the CMP Highway Network, and a portion is Included in the Congested Corridor Action Plan. A draft list of projects is attached. In general, projects that Include multi -modal solutions, Improve air quality, Increase transit service, and enhance the carrying capacity of existing roadways will compete well, provided adequate matching funds are identified. Staff Is currently Identifying matching funds and exploring potential partnerships. The MTA Area Team Specialists are also evaluating the grant applications being prepared. Rather than direct staff to prepare a precise list of applications, the City Manager desires the ability to make the final determination as to which projects are submitted. This will give staff the ability APPROVED y,m:� Transportation Grants: MTA Call for Projects March 23, 1993 Page 2 to stop pursuing non-competitive projects and to add new projects identified between now and the March 31 due date. Because of the substantial workload involved, staff needs the ability to focus on the best projects, completing additional applications as time permits. RECOMMENDATION: Direct the City Managerto submit grant applications to the Metropolitan Transportation Commission (MTA) based on the competitiveness and feasibility of the grant applications. ATTACHMENTS: Draft List of Potential Grant Projects. c0und Wfp0I.k(m CITY OF SANTA CLARITA: DRAFT GRANT PROJECTS FEB, 1993 TRANSPORTATION GRANTS: LACTC 1993 CALL FOR PROJECTS DUE 3/31/93 All Projects as Ranked By Team/City Manger OVERALL LEAD PROJECT: CORRIDOR RANK DEPT BIKE TRAIL: NORTH/SOUTH TRAIL N/S 1 PARK/REC BIKE TRAIL: CAMP PLENTY BRIDGE CROSSING METROLINK 2 PARK/REC BRIDGE: SIERRA HGWY AT RIVER SIERRA CMP 3 CD -ENG BRIDGE: SIERRA HGWY AT RR ROW SIERRA CMP 4 CD -ENG TRAFFIC: RESTRIPE SIERRA TO 6 LANES SIERRA CMP 5 CD=TRAFF SIGNAL INTERCONNECT: SIERRA HGWY CORR SIERRA CMP 6 CD-TRAFF BIKE TRAIL: SC RIVER COMMUTER METROLINK 7 PARK/REC TRAIL: CANYON COUNTRY PARK ACCESS METROLINK 8 PARK/REC RAIL: LAND PURCHASE METROLINK STATION METROLINK 9 PUB WORK BUS: SERVICE TO SAN FERNANDO VALLEY METROLINK 10 PUB WORK TRANSIT: GRAFFITI REMOVAL--BUSES/RAIL METROLINK 11 PUB WORK RAIL: SECURITY AT METROLINK STATION METROLINK 12 PUB WORK TRAFFIC: WIDEN MAGIC MOUNTAIN TO 1-5 R126/CMP 13 CD -ENG BUS: LOCAL• FIXED ROUTE EXPANSION CITY WIDE 14 PUB WORK BUS: TRANSIT MAINTENANCE/ADMIN FACILITY CITY WIDE 15 PUB WORK BIKE TRAIL: VALENCIA INDUSTRIAL CEN ACCESS R126/CMP 16 PARK/REC SIGNAL INTERCONNECT: VALENCIA/SOLEDAD METROLINK 17 CD-TRAFF SIGNAL INTERCONNECT: BOUQUET/SECO CORR N/S 18 CD-TRAFF SIGNAL INTERCONNECT: LYONS CORR R126/CMP 19 CD-TRAFF SIGNAL INTERCONNECT: SAN FERNANDO CORR R126/CMP 20 CD-TRAFF BUS: BOND REPURCHASE METROLINK 21 PUB WORK BUS: CENTURY CITY COMMUTER ROUTE METROLINK 22 PUB WORK RAIL: VENTURA CORRIDOR PRESERVATION R126/CMP 23 PUB WORK/CD BUS: PEDESTRIAN ACCESS TO TRANSIT METROLINK 24 PUB WORK BUS: TRANSIT STOP DISPLAYS METROLINK 25 PUB WORK BRIDGE: WIDENING VALENCIA BLVD/1-5 METROLINK 26 CD-PL,ENG ENV: R126-- MEDIAN ENV ENHANCEMENT R126/CMP 27 P&R/CD RAIL: STATION IN NEWHALL R126/CMP 28 PUB WORK RAIL: ROW --LAND USE STUDY, ENV. ENHANCE R126/CMP 29 CD-PL,ENG TRANSIT: CHILD CARE AT METROLINK METROLINK 30 TEAM RAIL: STATION IN CANYON COUNTRY METROLINK 31 PUB WORK TRANSIT: FACILITIES/SERVICE MASTER PLAN METROLINK 32 PW/CD BUS: BENCHES, SHELTERS, AND PADS METROLINK 33 PUB WORK BUS: WARNER CENTER COMMUTER ROUTE METROLINK 34 PUB WORK BUS: ANTELOPE VALLEY CONNECTOR METROLINK 35 PUB WORK BUS: TRANSIT CENTER AT REGIONAL MALL METROLINK 36 PUB WORK PLAN: DENSITY TRANSFER ORD' --CORRIDOR METROLINK 37 CD -PL BUS: ENVIRONMENAL ENHANCEMENTS --STOPS METROLINK 38 PUB WORK BUS: TRANSIT SUPERVISORY VEHICLES CITY WIDE 39 PUB WORK BUS: PARK -N -RIDE FACILITIES SIERRA CMP 40 PW/CD CITY OF SANTA CLARITA: DRAFT GRANT PROJECTS FEB, 1993 TRANSPORTATION GRANTS: LACTC 1993 CALL FOR PROJECTS DUE 3/31/93 Project Rankings Within Corridors Ranked By Team/City Manger PROJECT: RANK IN CORRIDOR CORRIDOR ALL GRANTS LEAD RANK DEPT BUS: LOCAL FIXED ROUTE EXPANSION CITY WIDE 1 14 PUB WORK BUS: TRANSIT MAINTENANCE/ADMIN FACILITY CITY WIDE 2 15 PUB WORK BUS: TRANSIT SUPERVISORY VEHICLES CITY WIDE 3 39 PUB WORK BIKE TRAIL: CAMP PLENTY BRIDGE CROSSING METROLINK 1 2 PARK/REC BIKE TRAIL: SC RIVER COMMUTER METROLINK 2 7 PARK/REC TRAIL: CANYON COUNTRY PARK ACCESS METROLINK 3 8 PARK/REC RAIL: LAND PURCHASE METROLINK STATION METROLINK 4 9 PUB WORK BUS: SERVICE TO SAN FERNANDO VALLEY METROLINK 5 10 PUB WORK TRANSIT: GRAFFITI REMOVAL--BUSES/RAIL METROLINK 6 11 PUB WORK RAIL: SECURITY AT METROLINK STATION METROLINK 7 12 PUB WORK SIGNAL INTERCONNECT: VALENCIA/SOLEDAD METROLINK 8 17 CD-TRAFF BUS: BOND REPURCHASE METROLINK 9 21 PUB WORK BUS: CENTURY CITY COMMUTER ROUTE METROLINK 10 22 PUB WORK BUS: PEDESTRIAN ACCESS TO TRANSIT METROLINK 11 24 PUB WORK BUS: TRANSIT STOP DISPLAYS METROLINK 12 25 PUB WORK BRIDGE: WIDENING VALENCIA BLVD/1-5 METROLINK 13 26 CD-PL,ENG TRANSIT: CHILD CARE AT METROLINK METROLINK 14 30 TEAM RAIL: STATION IN CANYON COUNTRY METROLINK 15 31 PUB WORK TRANSIT: FACILITIES/SERVICE MASTER PLAN METROLINK 16 32 PW/CD BUS: BENCHES, SHELTERS, AND PADS METROLINK 17 33 PUB WORK BUS: WARNER CENTER COMMUTER ROUTE METROLINK 18 34 PUB WORK BUS: ANTELOPE VALLEY CONNECTOR METROLINK 19 35 PUB WORK BUS: TRANSIT CENTER AT REGIONAL MALL METROLINK 20 36 PUB WORK PLAN: DENSITY TRANSFER ORD --CORRIDOR METROLINK 21 37 CD -PL BUS: ENVIRONMENAL ENHANCEMENTS --STOPS METROLINK 22 38 PUB WORK BIKE TRAIL: NORTH/SOUTH TRAIL N/S . 1 1 PARK/REC SIGNAL INTERCONNECT: BOUQUET/SECO CORR N/S 2 18 CD-TRAFF TRAFFIC: WIDEN MAGIC MOUNTAIN TO 1-5 R126/CMP 1 13 CD -ENG BIKE TRAIL: VALENCIA INDUSTRIAL CEN ACCESSR126/CMP 2 16 PARK/REC SIGNAL INTERCONNECT: LYONS CORR R126/CMP 3 19 CD-TRAFF SIGNAL INTERCONNECT: SAN FERNANDO CORR R126/CMP 4 20 CD-TRAFF RAIL: VENTURA CORRIDOR PRESERVATION R126/CMP 5 23 PUB WORK/CD ENV: R126-- MEDIAN ENV ENHANCEMENT R126/CMP 6 27 P&R/CD RAIL: STATION IN NEWHALL R126/CMP 7 28 PUB WORK RAIL: ROW --LAND USE STUDY, ENV. ENHANCE R126/CMP 8 29 CD-PL,ENG BRIDGE: SIERRA HGWY AT RIVER SIERRA CMP 1 3 CD -ENG BRIDGE: SIERRA HGWY AT RR ROW SIERRA CMP 2 4 CD -ENG TRAFFIC: RESTRIPE SIERRA TO 6 LANES SIERRA CMP 3 5 CD-TRAFF SIGNAL INTERCONNECT: SIERRA HGWY CORR SIERRA CMP 4 6 CD-TRAFF BUS: PARK -N -RIDE FACILITIES SIERRA CMP 5 40 PW/CD