HomeMy WebLinkAbout1994-12-13 - AGENDA REPORTS - COMMUTER RAIL TRAIL (2)City Manager Approval Item to be presented by: Rick Put m CONSENT CALENDAR LY DATE: December 13, 1994 SUBJECT: Chuck Pontius Commuter Rail Trail - Project No. 99-029 Soledad Bridge Bikeway - Project No. 99-040 Authorization to Advertise for Bids DEPARTMENT: Parks, Recreation, and Community Services Project No. 99-029 (Chuck Pontius Commuter Rail Trail) is a proposed bicycle trail and pedestrian way between the Soledad Bridge (near Camp Plenty Road) and the Santa Clarita Metrolink Station. Project No. 99-040 (Soledad Bridge Bikeway) will provide for connection between the Chuck Pontius Commuter Rail Trail and Phase 1 of the Santa Clara River Trail. Both projects are funded through Proposition C discretionary grants. Preparation of the contract documents for both projects should be complete within the next few weeks. Staff has determined it may be more cost effective if: • Projects 99-029 and 99-040 were combined and contracted for as a single project; • The asbestos removals and demolition of the "Far West" building were contracted for separately as specialty construction; and • A number of minor bikeway amenities were deleted from the Soledad Bridge Widening Project (which is currently nearing construction completion) and included in the combined Project 99-029 and 99-040 construction package. i SI \�' �\ Direct staff to package the two construction projects in the manner described; and authorize staff to advertise for bids once the contract documents are completed. Council adoption of the plans and specifications to be made at the time of contract award. REP:KN �,`',��+,�WE pAcouncillagenda5cc fUr IIIIUUUUfff�111lllLJJI}}}}I f. " rda Item: �