HomeMy WebLinkAbout1994-11-08 - AGENDA REPORTS - CONTINUED PH PORTA BELLA PLAN (2)AGENDA REPORT
PUBLIC HEARING
DATE: November 8, 1994
City Mana€
Item to be
Rich Henderson
SUBJECT: CONTINUED PUBLIC HEARING REGARDING THE PORTA BELLA
SPECIFIC PLAN AND DEVELOPMENT AGREEMENT AS WELL AS
THE THREE APPEALS FILED CONCERNING THE DECISION ON
JUNE 21, 1994, BY THE PLANNING COMMISSION TO ADOPT A
STATEMENT OF OVERRIDING CONSIDERATION; TO CERTIFY THE
FEIR AND ADDENDUM SCH 92-041041; TO ADOPT A MITIGATION
MONITORING PROGRAM; TO APPROVE VESTING TENTATIVE
TRACT MAP 51599 AND OAK TREE PERMIT 91-033; AND TO
RECOMMEND THAT THE CITY COUNCIL APPROVE SPECIFIC
PLAN 91-001 AND CONSIDER DEVELOPMENT AGREEMENT 93-003,
DEPARTMENT: Community Development
BACKGROUND
On October 11, 1994, the Council held a continued public hearing on this project in which
they received a presentation by the City's environmental consultant on the EIR and
Addendum, received a presentation from a representative of the California Environmental
Protection Agency --Department of Toxic Substances Control, and discussed the Porta Bella
site visit, joint Planning Commission/City Council Study Session and the public testimony
received to date. At this meeting the Council raised concerns that all the questions asked
by the public may not have been answered. Staff has attached a matrix summary of
questions and answers from the public and from the Council. One of the questions posed by
Council concerned the financial capability of the developer and this question will be answered
by the City Attorney at this hearing.
ACTION
The purpose of this meeting is three -fold. First, staff has compiled a list of the questions and
answers which have been received on the project through various letters as well as responses
to those questions.
Second, to clarify the EIR. consultant's comments from the previous hearing, no "F" level of
service intersections will be newly created as a result of this project alone based on the traffic
Continued to:� Agenda Item:
study performed for this project. The Porta Bella traffic study considered the build -out of
Porta Bella along with build -out of other projects within the City and unincorporated county.
Given this project and others at build -out, "14 intersections are anticipated to operate an "Y',
or failure, level. As a result of conditions added to this project, the performance of six of
these intersections are anticipated to be helped, leaving only eight of the 14 intersections at
an "F level of service.
The traffic study prepared for the Porta Bella EIR uses the joint City -County traffic model
and specifically addresses the impacts anticipated from the Porta Bella project. The traffic
study under preparation for the Central City Circulation Element project is also being
conducted using the joint City -County traffic model, however, this study is focused on the
macro, city-wide level, rather than on the project level as is the Porta Bella study. Therefore,
the Circulation Element traffic study includes as an appendix an analysis of the Porta Bella
traffic -related impacts, other than as part of the overall City traffic impacts due to future
growth occurring valleywide..
The third purpose of this meeting is to report to the City Council that the Environmental
Impact Report (EIR) prepared for the Porta Bella ;project is complete and ready for
certification per the Planning Commission's; recommendation., No new issues; relating to
toxics and traffic have been raised at the Council level which have not already been explored
and answered at the Planning Commission level. These traffic and toxics issues are well
documented in the Environmental .Impact Report and Addendum and through earlier
applicant, expert, staff and public testimony received on this project.
The purpose of an EIR is to disclose anticipated project impacts. Council certification of an
EIR and Addendum certifies that all reasonably anticipated impacts have been considered
and that the disclosure is considered complete with regard to the legal requirements of the
California Environmental Quality Act (CEQA) for purposes of project approval. Certification
of an EIR and Addendum does not approve a project or infer that a project will be approved.
This action allows us to move forward with review of the project.
ANALYSIS
Three appeals have been received on this project and .may be addressed as follows:
1. Appeal from Northholme Partners relating to clarification of condition
language concerning reimbursement. This issue can be resolved through
use of new language.
RECOMMENDATION: Provide documentation for changes to satisfy
legal requirements.
2. Appeal from Keysor-Century concerning impacts to businesses in the
Springbrook area due to possible alignments for proposed Magic/
Princessa. The applicant is addressing this issue through alternate
design options which may limit impacts to Keysor-Century.
RECOMMENDATION: Provide a condition that all affected property
owners shall be made whole.
3. Appeal from Carl Kanowsky representing homeowners in Circle "J". This
is a general appeal with a wide breadth of objections. Due to the extent
of the objections, the City Council would need to find that a decision on
the project will, in itself, address the issues.
RECOMMENDATION: Council statement (per the advice of the City
Attorney) that action on the project itself will address these issues.
RECOMMENDATION FOR PROJECT PROCESSING:
Staff recommends that the City Council:
1. Receive staff report, reopen the continued public hearing and request testimony on the
appeals and on the project;
2. Take preliminary action on appeals as described above and instruct staff to amend
documentation and present it to the City Council on November 22, 1994;
3. Accept the Planning Commission recommendation to certify the EIR and Addendum
and direct staff to return with a resolution for certification;
4. Review the attached summary of issues raised to date and focus discussion on toxics
and traffic circulation;
5. Reach consensus on the remaining outstanding issues of toxics and circulation;
6. Continue the public hearing to the November 22, 1994, City Council meeting and
return with appropriate documentation.
ATTACHMENT
Porta Bella Summary of Questions and Answers dated November 8, 1994
Porta Bella Summary of Issues
Letter of October 9, 1994 from Northholme Partners to Lynn Harris.
current\pb_mr04.1h9
CITY OF SANTA CLARITA
NOTICE OF PUBLIC HEARING REGARDING THE PORTA BELLA SPECIFIC PLAN 91-001; WHICH
INCLUDES AN AMENDMENT TO THE GENERAL PLAN, AND DEVELOPMENT AGREEMENT 91-003.
THE GENERAL PLAN AMENDMENT INCLUDES CHANGES TO THE HIGHWAY NETWORK OF THE
CIRCULATION ELEMENT (INCLUDING OFF-SITE SEGMENTS), AND CHANGING THE SITE'S
GENERAL PLAN DESIGNATION TO SPECIFIC PLAN IN THE LAND USE ELEMENT AND GENERAL
PLAN MAP.
PUBLIC NOTICE IS HEREBY GIVEN:
A Public Hearing will be held before the City Council of the City of Santa Clarita regarding Master
Case No.'s 91-164 and 93-012 (Porta Bella Specific Plan), including Specific Plan No. 91-001;
Development Agreement No. 93-003; and Final Environmental Impact Report and Addendum SCH
92-041041. Concurrently, the City Council will begin the public hearing for the appeals filed against
the Planning Commission decision to approve Vesting Tentative Tract Map 51599 and Oak Tree
Permit 91-033 for the Porta Bella site on June 21, 1994. A separate public notice regarding the
appeals will be mailed with this notice.
The property, known as the Bennite site, is located south of Soledad Canyon Road, east of Bouquet
Canyon/San Fernando Roads, north of the Circle J Ranch communities, and west of the Golden
Triangle Industrial area. The ASSESSOR'S PARCEL NO.'S are 2836-012-010,011,012, and 019. The
site consists of 996 acres formerly used for Industrial purposes. The Specific Plan proposes 2,911
dwelling units, including 1,244 single-family homes and 1,667 multi -family dwellings. The proposal
Includes: 449 acres of open space and parks; 300 acres of single-family uses; 85 acres of multi-
family uses; 56 acres of streets; and 106 acres of commercial, office, business park, and
Institutional uses. The Vesting Tentative Tract Map proposes to create 76 master lots to be further
subdivided In future tract maps. There are 182 oak trees on the site and the project may require
the removal of up to 109 oak trees, including as many as five of the ten heritage oak trees. The
proposed Magic/Princessa corridor includes an off-site segment within the designated open space
of Circle J Ranch and another extending west from the project site to San Fernando Road.
The hearing will be held by the City Council In the City Hall Council Chambers, 23920 Valencia
Boulevard, 1st Floor, Santa Clarita, the 23rd day of August, 1994, at or after 6:30 p.m.
Proponents, opponents, and any interested persons may appear and be heard on this matter at that
time. Further information may be obtained by contacting the City Clerk's office, Santa Clarita City
Hall, 23920 Valencia Boulevard, 3rd Floor, Santa Clarita, California.
If you wish to challenge the action taken on this matter in court, you may be limited to raising only
those Issues you or someone else raised at the public hearing described in this notice, or in written
correspondence delivered to the City of Santa Clarita at, or prior to, the public hearing.
Dated: August 1, 1994
Donna M. Grindey, CMC
City Clerk
Publish Date: August 3, 1994
CURRENT\pb_ccn4.kjm
PORTA BELLA SUMMARY OF ISSUES FOR COUNCIL DISCUSSION
OUTSTANDING
ISSUES
COMMENTS
ALTERNATIVES
ADVANTAGES
DISAD7occur
■Site has previously
Clean entire site
Site receives a
1) May
been graded over
before any
clearance before
becausesignificant
areas.
construction activities
grading occurs.
costs fo
begin. (The Planning
total site..
CLEAN-UP OF THE
■Phased development
Commission discussed
PORTA BELLA SITE
has already occurred
and decided phasing
2) Will delay
for grading and
would be permissible
construction of
construction of the
following DTSC
roadways through the
rail station.
clearance of the area
site.
in the phase.)
■No grading will
3) Developer could
occur in areas not
subdivide site and not
cleared by the State.
develop by a master
plan concept.
■This is a 996 acre
project.
Phase grading as
1) Construction of
Whole site not
■The state EPA is the
clearance is given
phase one, including
cleared at once. Will
responsible agency
from the responsible
arterials, will occur
limit ability to grade
over remediation
state agency
sooner.
areas of the site not
efforts and grants
yet cleared and may
clearance, not the
2) Costs of clean-up
slow development of
City.
efforts offset by
the project.
revenue from earlier
■The state EPA
phases
assisted City staff to
add the condition
allowing phasing as
the state EPA
clearance on portions
of the site occur.
PREPARED NOVEMBER 8, 1994
PORTA BELLA SUMMARY OF ISSUES FOR CITY COUNCIL DISCUSSION
PAGE 2
OUTSTANDING
ISSUES
COMMENTS
ALTERNATIVES
ADVANTAGES
DISADVANTAGES
Move Magic-Princessa
Eliminates need for
Higher roadway
■The City needs east-
out of Circle "J"
condemnation of open
visibility and
west roads regardless
approximately 150
space of adjacent
increases grading on
of this project.
feet to the east.
property
hillsides (but not on
any significant
■Elimination of
ridgelines.
roadways is not a
PORTA BELLA
viable option for this
TRAFFIC
project due to overall
CIRCULATION
City-wide circulation
concerns.
■Condemnation is
likely for construction
Higher roadway
of any major arterial.
Move or redesign
Will lower noise in
visibility and grading
Owners of condemned
Oakdale bridge to
nearby residential
on hillsides but not
property are to be
lower noise from
neighborhood.
on any significant
made whole.
65dBL to 60dBL.
ridgelines
■The closest existing
home to proposed
Magic/ Princessa is
350 feet; consistent
with other roads in
the City.
c.rrerrt\pb$e
SUMMARY OF COUNCIL QUESTIONS
RE: MASTER CASE NUMBERS 91-164 AND 93-012
PREPARED NOVEMBER 8, 1994
ISSUE
RESPONSE
1.
What are the City's Insurance
The City can only condition the developer to construct improvements which are
and Liabilities in Conditioning
impacted by the proposed development. There must be a nexus between
and Ensuring that Public
conditioned improvements in the public interest and the anticipated project
Improvements are Constructed
specific impacts. There must also be a relationship or "rough proportionality"
by the Developer?
between the scope of the project and the degree of the dedications/improvements
required. Reimbursement districts are a way to address the proportionality
issue and have been mentioned previously. Note: These standards for
weighing conditions do not apply to those conditions agreed upon
though a development agreement. The City can require the developer to
obtain a completion bond or other such method to ensure that conditioned
public improvements are completed. (See confidential City Attorney Response
letter re: Dedications and Exactions.)
2.
How Does this Project Fit in
The City is presently studying the overall circulation network in the Santa
the East/West Route
Clarita Valley. A traffic study is being prepared to address the network on a
Discussion? What are the
macro scale based on the joint City -County traffic model. This is the same
Project Implications for the
model used by Justin -Farmer in assessing the specific traffic impacts of the
East/West Route Including
Porta Bella project at a micro level.
Newhall Ranch Road?
With regards to the Porta Bella project, the issue is not one of "replacing"
planned roadways, but rather one of how and where should portions of
roadways already on the General Plan be built across the Bermite site. The
question for Porta Bella at this point should be limited to project specific ones
of where are we going to put an extension to Magic Mountain Parkway and an
extension to Via Princessa which are already shown on the General Plan. This
is the micro -level or project specific information provided in the traffic study for
the Porta Bella EIR and Addendum.
PREPARED NOVEMBER 8, 1994
SUMMARY OF COUNCIL QUESTIONS AND ANSWERS
PREPARED NOVEMBER 8, 1994
ISSUE
RESPONSE
2.
Continued...
The question of an overall east -west route belongs to future discussions of the
City Circulation Element Amendment when the city-wide, macro -level traffic
How Does this Project Fit in
study is analyzed. Whether the title of main east -west route should be given to
the East/West Route
Magic/Princessa, Newhall Ranch Road or some other roadway is irrelevant in
Discussion? What are the
terms of the Porta Bella project for the reason that all of the General Plan
Project Implications for the
arterials through the Bermite site are necessary. This is supported by Porta
East/West Route Including
BelWs own site specific traffic study. The information to be gained from the
Newhall Ranch Road?
City-wide traffic study will not be of assistance in determining the project
specific circulation needs or alignments for Porta Bella since the city-wide study
encompasses such an expanded scope. The best traffic information on Porta
Bella impacts is already before you.
The Porta Bella project is not adjacent to this roadway and discussion of this
roadway isnot related to this project. Discussions of Newhall Ranch Road will
be appropriate during consideration of the Center City Circulation Element
Amendment. (EIR Transportation/Circulation Section see pages 6-236 to 6-276
and Addendum, Northholme Partners' letter of October 9, 1994 to Lynn Harris.)
3.
What is the Corporate
See confidential City Attorney Response re: Northholme Partners.
Structure and Financial Status
of Northholme Partners? Is
This Appropriate for the
Council to Consider?
4.
Is it Necessary to Have Bridges
The applicant, City, SCRRA (Metrolink) and other interested parties,
for Magic/Princessa Over San
particularly the Circle "J" Homeowners and business interests in the
Fernando Road and Over
Drayton/Springbrook, area have discussed various alternatives to eliminate or
Oakdale Canyon?
reduce impacts from bridges.
PREPARED NOVEMBER 8, 1994
SUMMARY OF COUNCIL QUESTIONS AND ANSWERS
PREPARED NOVEMBER 8, 1994
3
ISSUE
RESPONSE
4.
Continued...
There seemed to be some confusion expressed by the Council at the October 11;
1994 meeting as to whether the need for bridges over San Fernando Road and
Is it Necessary to Have Bridges
Oakdale Canyon could be removed if Newhall Ranch Road, rather than
for Magic/Princessa Over San
Magic\Princessa became the designated east/west route. There are really three
Fernando Road and Over
issues here. One, is the issue of Magic/Princessa and Newhall Ranch Road a
Oakdale Canyon?
question of building one road and eliminating the other if one is declared an
east -west route? Since these are both General Plan roads the question of
eliminating one in favor of the other does not exist regardless of any future
actions which may designate an official east -west route. They are both
necessary
Second, there is an issue of timeliness. The question of where and how to build
Magic/Princessa is now relevant to the Porta Bella project since this general
plan roadway traverses the project site. By comparison, Newhall Ranch Road is
an off-site roadway unrelated to the Porta Bella proposal . Its development,
therefore, is not related to the development of Magic/Princessa or Porta Bella.
The third issue is bridging and alternatives. Bridging is related to the
development of Magic/Princessa by virtue of its being a General Plan roadway,
not as a result of any official east -west recognition. For San Fernando Road,
bridging is necessary to clear the railroad tracks and gain the elevation needed
to reduce the amount of grading necessary to construct the roadway. The
applicant is working with property owners to reach agreements to allow for
roadway construction.
PREPARED NOVEMBER 8, 1994
3
SUMMARY OF COUNCIL QUESTIONS AND ANSWERS
PREPARED NOVEMBER 8, 1994
4
ISSUE
RESPONSE
4.
Continued...
For Oakdale Canyon a bridge is the reasonable way to cross it with minimum
impacts. This finding is substantiated in the EIR Addendum. To reduce noise
Is it Necessary to Have Bridges
and visual impacts to neighboring residences, however, the location of the
for Magic/Princessa Over San
bridge may be moved and the bridge design modified to aid in noise
Fernando Road and Over
attenuation. A condition may be added to limit noise at the nearest existing
Oakdale Canyon?
residence to a maximum of 60dBL from the projected 65dBL. (EIR Addendum
pages 2-3, 10-11, 29-38 including diagrams and Northholme Partners' letter of
October 9,'1994 to Lynn Harris, pages 2-4 and 11.)
5.
What are the City's Risks In
The State EPA is the responsible agency for ensuring proper site clean-up. The
Approving a Project With
State EPA assisted City staff in drafting a condition to allow phased clean-up
Outstanding Toxic Clean-up
and development of the site as approved by the Planning Commission, The
Issues with CalEPA,
City would need to ensure that the EPA had issued clearance letters prior to
Specifically Regarding
City issuance of grading or other construction permits by phased area. The
Conditioning of Phasing,
City has included a condition that requires there to be a toxics expert on-site to
Developer Responsibility and
oversee all grading activities which exceeds the State EPA requirements for
Public Liability9
cleared sites. The Whittaker Corporation and EPA are working on a consent
order to start the State EPA clean-up process which includes a workplan for
Whittaker outlining a schedule of submittals, penalties for non-conformance,
and both on and off-site scoping for toxics, including off-site drainage areas.
See confidential City Attorney response re: Conditions Regarding Hazardous
Materials. (EIR and Addendum, testimony of EPA representative Ms. Carla
Slepak on October 11, 1994, Northholm Partners' letter of October 9, 1994 .)
6.
What is the Relationship
The joint City -County traffic model was used in the preparation of the specific
between the City Circulation
traffic study done for the Porta Bella project. The Center City Traffic Study
Element Amendment Traffic
does not specifically address Porta Bella traffic impacts. See November 8, 1994
Study and the Porta Bella
Agenda Report and Above Discussion of Issue No. 2.
Project?
PREPARED NOVEMBER 8, 1994
4
SUMMARY OF COUNCIL QUESTIONS AND ANSWERS
PREPARED NOVEMBER 8, 1994
ISSUE
RESPONSE
7.
Are There Conditions that the
Yes, the specific architectural and roadway design criteria would be applicable
Architectural Design,
to any future development, regardless of developer, because it is included as
Circulation Features, etc. are
part of the Specific Plan. Specific Plan approvals run with the land so any
Preserved if the Project is Sold?
future developer and development will be bound by it.
8.
How Can the City Clarify
See confidential City Attorney Response letter re: Dedications and Exactions.
Agreements for
Reimbursement?
PREPARED NOVEMBER 8, 1994
WRITTEN CORRESPONDENCE RESPONSES REQUESTED BY THE CITY COUNCIL
RE: MASTER CASE NUMBERS 91-164 AND 93-012
F-1
Question
Issues
Response
1.
Letter of July 1,
This letter raises concerns
The issues of toxics has been identified in the EIR. Presentations on the
1994 from Carl
over toxics, phasing of
issue of toxics have been made before the Planning Commission and,
Kanowsky
grading, urges approval of
most recently, by a state EPA representative before Council. The
EIR Alternative 4, and
Planning Commission did consider the issue of toxics and overall site
raises concerns that
clean-up vs. phased clean-up and development in its approval of the
additional investigation
project.. The Planning Commission certified the EIR and Addendum and
should be done concerning
found that the information in the document was adequate in terms of the
seismology
California Environmental Quality Act. This EIR and Addendum
contains information on seismology, Alternative 4 which was rejected
after consideration by the Planning Commission and discussions of the
impacts of grading in terms of the City's Hillside Ordinance and visual .
impacts. (EIR Geotechnical Considerations (pages 6-2 to 6-36),
Aesthetics/Light and Glare (pages 6-148 to 6-172), Land Use (pages 6-173
to 6-204) Risk of Upset/Health Hazards (pages 6-205 to 6-220) and
Addendum, Northholme Partners' letter dated October 9, 1994 to Lynn
Harris. See November 8, 1994 agenda report analysis section page 2,
appeal number 3.)
2.
Letter of
Request for study of other
The applicant has been working with the City, SCRRA (Metrolink),
August 31, 1994
alternatives to a bridge at
homeowners (particularly Circle "J° residents), and businesses in the
from Robert P.
Magic Mountain/San
Drayton/Springbrook area to find alternative alignments for
Lathrop
Fernando Roads
Magic/Princessa. This has included looking at the viability of an
representing
underpass to accomplish this crossing; however, an overpass is the
SCOPE
preferred alternative for environmental, as well as cost and engineering
constraints. (EIR Addendum discussions on Magic/Princessa pages 2-3,
10-11, 14-15, and 29-38, and Northholme Partners' letter dated October
9, 1994 to Lynn Harris, pages 2-3.)
1 PREPARED NOVEMBER 8, 1994
3.
Letter of
The letter expresses
The ultimate alignment for the Santa Clarita Parkway intersection with
September 24,
concerns over impacts of
Placerita Canyon is still unresolved. The developer has been in contact
1994 from Ben
the Santa Clarita Parkway
with AES Placerita which operates a facility in the area which may be
Curtis,
alignment on Placerita
bisected by a future alignment; however, it is unknown at this time what
President
Canyon Road. Claims the
the future impacts of roadways development in this area will be. This
Placerita
Placerita HOA was not
intersection location is not on the Bermite property and would be an off -
Canyon
notified adequately of the
site improvement. The applicant has been in contact with the Placerita
Property
project.
HOA and has even given presentations on this project to them. The
Owners'
complaint of inadequate HOA notification is unfounded. (Northholme
Association
Partners' letter dated October 4, 1994 to Mayor Pederson. Northholme
Partners' letter to Pat Willette of the Placerita H.O.A. dated April 22,
1993.)
4.
Letter of
Regarding Santa Clarita
The letter acknowledges that AES is aware of the proposed alignment
September 26,
Parkway alignment impacts
however, it is not known at this time what the impacts will be to AES.
1994 from AES
to AES operations.
It is premature to say that the problems are insurmountable.
Placerita to
Sam Veltri
5.
Letter of
Proposes alternatives for
The several alternatives submitted have received a preliminary review
August 23, 1994
Magic/Princessa and a
by staff and the applicant. These alignments can be used for discussion
from Ron
bridge over Oakdale
between the developer and the Circle "J" homeowners. The roadway
Druschen, a
Canyon alternatives
alignment for MagidPrincessa proposed by Northholme Partners is still
Circle J Ranch
the one addressed in the EIR Addendum. (EIR Addendum, Northholme
resident
Partners letter dated October 9, 1994 to Lynn Harris.)
6.
Letter of
Expresses concerns about
The developer has been working with Hasa, Inc. to come up with an
October 11,
the alignment of the
alignment which will minimize impacts upon their business. It will be a
1994 from
MagicfPrincessa Bridge
condition of approval that all property owners be made whole and this is
Kevin Brogan,
over San Fernando and its
the responsibility of the developer. The EIR Addendum addresses
Esq.
impact upon Hasa, Inc,
impacts anticipated as part of bridge construction including business
representing
relocation. See Confidential City Attorney Letter to Council re:
Hasa, Inc.
Proposed Interface of Magic Princessa with Industrial Park.
PREPARED NOVEMBER S, 1994
WRITTEN CORRESPONDENCE RESPONSES
REQUESTED BY THE CITY COUNCIL RE: MASTER
CASE NUMBERS 91-164 AND 93-012
7.
August 4, 1994
Expresses concerns over
EIR Risk of Upset/Health Hazards section (pages 6-205 to 6-220) and
letter from Carl
toxic and hazardous waste
Addendum, testimony from EPA, Northholme Partners' letter dated
Kanowsky, 10
clean-up.
October 9, 1994 to Lynn Harris, pages 7-10. See November 8, 1994
page letter and
agenda report analysis section page 2, appeal number 3.
presentation to
Council on
Expresses concerns over
Northholme Partners' letter dated October 9, 1994 to Lynn Harris, EIR
August 23,
the East/West Corridor
and addendum discussion on T�-ansportation/Circulation section, pages 6-
1994
236 to 6-276.. See November 8, 1994 agenda report analysis section page
2, appeal number 3.
Expresses concerns over
EIR Transportation/Circulation section (pages 6-236 to 6-276) and
This is an
extensive letter
Traffic
Addendum, Northholme Partners'letter dated October 9, 1994 to Lynn
with numerous
Harris.See November 8, 1994 agenda report analysis section page 2,
questions.
appeal number 3.
These are the
same questions
Prefers the choice of
EIR Alternatives section page 8-32, Northholme Partners' letter dated
he raises as
Alternative 4
October 9, 1994 to Lynn Harris. See November 8, 1994 agenda report
part of his
analysis section page 2, appeal number 3.
Concerns about Magic
EIR Addendum, Northholme Partners' letter dated October 9, 1994 to
appeal.
Please see the
Mountain Bridge over San
Lynn Harris. See November 8, 1994 agenda report analysis section page
agenda report
Fernando
2, appeal number 3.
appeal
Concerns with Land Use
EIR Geotechnical Considerations (pages 6-2 to 6-36) and Land Use
discussion.
and Hillside & Ridgeline
(pages 6-173 to 6-204) and Addendum and Northholme Partners' letter
Development
dated October 9, 1994 to Lynn Harris. See November 8, 1994 agenda
report analysis section page 2, appeal number 3.
Concerns with impacts to
EIR Solid Waste Disposal System pages 6-332 to 6-433 and Addendum.
Solid Waste Management.
See November 8, 1994 agenda report analysis section page 2, appeal
number 3.
PREPARED NOVEMBER 8, 1994
WRITTEN CORRESPONDENCE RESPONSES
REQUESTED BY THE CITY COUNCIL RE: MASTER
CASE NUMBERS 91-164 AND 93-012
current\pubqueRt1ba
PREPARED NOVEMBER 8, 1994
Metrolink Escalator
EIR page 6-260, Specific Plan. See November 8, 1994 agenda report
analysis section page 2, appeal number 3.
Questions the status of
See Confidential City Attorney Letter to Council re: Northholme
Northholme Partners
Partners.
Concerns over Seismicity
EIR Geotechnical Considerations (pages 6-2 to 6-36) and Addendum,
testimony, Northholme Partners' letter dated October 9, 1994 to Lynn
Harris page 11. See November 8, 1994 agenda report analysis section
page 2, appeal number 3.
8.
Statement to
Appeal of Planning
Mr. Hutchinson has been working with the developer to develop an
Council
Commission decision,
alignment which addresses Keysor-Century concerns. See Confidential
delivered by
concerned with impacts of
City Attorney Letter to Council re: Proposed Interface of Magic Princessa
Roger
the Magic/Princessa
with Industrial Park. (Northholme Partners' letter dated October 9,
Hutchinson at
alignment upon Keyser-
1994 to Lynn Harris. See November 8, 1994 agenda report analysis
the Council
Century and other area
section page 2, appeal number 2.)
Meeting of
businesses.
August 23, 1994
representing
Keysor-Century
Corp.
9.
Comment from
General Opposition to
Comment noted.
Gail West
removal of oak trees,
proposed density and
ridgeline alteration
current\pubqueRt1ba
PREPARED NOVEMBER 8, 1994
NORTHHOLME PARTNERS
330 Washington Blvd.
Fourth Floor
Marina del Rey, CA 90292
October 9, 1994
101Efi 1��4
Ms. Lynn M. Harris, Deputy City Manager
Community Development
23920 Valencia Parkway
Suite 300
Santa Clarita, CA 91350
Re: Porta Bella
Dear Ms. Harris:
We are writing this letter to respond to the specific requests for
information which various members of the City Council made during the Joint
Study Session on Tuesday, October 4.
At the outset, we would like to compliment the Planning Commission and
the City Council for conducting the Joint Study Session. We believe that this
unique approach gave members of the City Council the opportunity to
comprehensively review all of the substantive issues arising out of the Porta
Bella application and for members of the Planning Commission to share their
considerable knowledge about the project with the City Council. We were
particularly encouraged by the effort on the part of members of the City Council
to identify those specific issues which primarily concern them and by their
willingness to permit us to respond to those concerns. The following comments
respond to those concerns.
1. Traffic and Circulation.
(a) Phasing of Infrastructure. As proposed by the Applicant, this
Project consists of logical segments of roadways to support each phase of the
proposed development in Porta Bella. Under the proposed plan, specific road
improvements must be constructed to serve the phase of the development to
be constructed and to mitigate the traffic impacts of that phase. Prior to
recordation of a map for any portion of the project, the prerequisite for the
commencement of any substantial construction on,a phase of the project, the
City must approve all of the work which assures the City that the required
roadway segment will and can be built. This includes all of the detailed
engineering for the roadway segment as well as right of way arrangements. It
Ms. Lynn M. Harris
October 9, 1994
Page 2
also includes all performance and completion bonds which assure the City that
the roadway segment will in fact be constructed. If the Applicant cannot provide
the City with the required work, rights of way, and assurances with respect to a
roadway segment, the Applicant must find an acceptable alternative or it
cannot proceed with the related phase or portion of the project.
For example, 60% of the project's total trips are generated by
certain phases of development which depend upon the completion of Santa
Cladta Parkway. Before maps for those phases can be recorded and
construction commenced, the Applicant must engineer the Parkway in
accordance with attached preliminary designs, must make arrangements for
the acquisition of all right of ways, and must post performance and completion
bonds for the Parkway. If for any unforeseen reason the Parkway is not
feasible, the Applicant must find an alternative route acceptable to the City
before it can proceed with those phases of development.
The foregoing raises two important points. First, the failure of the
Applicant to proceed with any subsequent phase of the Project will not
contribute to the existing infrastructure deficit of the City. Second, under
current law, the City may not require the Applicant to correct infrastructure
problems which are not reasonably caused by the Project. If the City wishes
the Applicant to assist the City in its efforts to cure its current regional
infrastructure deficit, it must explore this assistance through the mechanism of
a development or other agreement with the Applicant.
(b) Magic Mountain Parkway Extension at San Fernando Road.
The Applicant is implementing the General Plan's extension of the Magic
Mountain Parkway through the Porta Bella Specific Plan. The Civic Center
architects have identified four proposals for achieving this extension to the east
of San Fernando Road: (i) an at -grade intersection; (ii) an over -crossing; (iii) an
under -crossing; and (iv) the Drayton Street intersection.
When the Applicant initially proposed Porta Bella, it included an
at -grade extension of Magic Mountain Parkway at San Fernando Road. This
at -grade extension is one of the alternatives for this intersection proposed by
the Civic Center architects. After the initial proposal of the Applicant, the
Planning Commission proposed the Magic/Princessa alignment. This alignment
requires the Applicant to adopt the more expensive alternative for the
intersection, an over -crossing. This over -crossing will include ramps which will
be connected to San Fernando Road and will accommodate the transition
between Magic Mountain Parkway and San Fernando Road from four
directions. The remaining two alternatives, particularly the undercrossing of the
tracks and road, probably cannot meet highway design criteria without
significant landform impacts.
Ms. Lynn M. Harris
October 9, 1994
Page 3
The over -crossing will result in a bridge that begins on the east
side of the South Fork Bridge and gradually ascends to provide the proper
clearance over San Fernando Road and the Southern Pacific Railroad tracks.
The preliminary elevations indicate that the bridge will have 17 to 25 feet of
clearance over the road and tracks which is not significantly different than the
height of the paseo bridges throughout Valencia. The bridge continues to rise
beyond the railroad tracks as it extends easterly into the City property, thereby
minimizing impacts to the adjoining hillside. The bridge reaches approximately
50 feet above the ground at its easternmost terminus where it begins to follow
the existing terrain at ground level. A graphic depiction of this facility, together
with various refinements are currently being prepared to respond to individual
property owners concerns in an attempt to discover the best solution.
(c) Magic/Princessa Alignment.
(i) The Magic/Princessa Alignment provides a cross-town
route and would divert current cross-town traffic away from the Circle J
Community. The Planning Commission revised the Porta Bella proposal to
include the Magic/Princessa alignment in response to testimony during
extensive public hearings conducted by the Commission and in response to
directives from the City Council to seriously consider the Magic/Princessa
alignment. The alignment provides a direct cross-town route, maintains the
residential and pedestrian quality of the Porta Bella and Circle J communities,
and minimizes through traffic within Circle J and Valencia. In fact, the
proposed alignment diverts regional traffic away from Circle J by diverting
traffic onto the MagicfPrincessa alignment and away from Via Princessa at the
point where Via Princessa enters Circle J and proceeds from there to bisect
the center of the Circle J community. This alignment helps to replace capacity
which was lost when Route 126 was eliminated. The EIR's traffic study
confirms that the Porta Bella roads will enhance the City's transportation
network and that the inclusion of Magic/Princessa will improve the level of
service at Bouquet Junction.
(ii) The Magic/Princessa alignment is compatible with the
findings of CTAC. The Magic/Princessa alignment is compatible with the
proposed CTAC route and the findings of CTAC. CTAC proposed a network of
roads for the circulation of traffic in the center of the City. Magic/Princessa and
the proposed CTAC route work together to supply east -west circulation within
this network of roads.
(iii) The Magic/Princessa alignment satisfies sound
principles of land planning. The Magic/Princessa alignment runs between the
Circle J community and the Porta Bella community. This location of the
alignment maintains the integrity of both neighborhoods as two separately
planned communities without disrupting the internal neighborhoods. In addition,
Ms. Lynn M. Harris
October 9, 1994
Page 4
the alignment provides the best opportunity to utilize the topography while
complying with highway design criteria. The proposed alignment utilizes the
topography to shield the roadway from public view.
It is physically impossible to accommodate both
Magic/Princessa and Main Street within the developable area of Porta Bella.
The location of the Magic/Princessa alignment has been carefully planned to
preserve the residential character of the Porta Bella and the Circle J
communities by circulating cross-town traffic around and not through these
communities. This alignment permits Main Street to serve as the transition road
which collects local traffic from the neighborhoods of Porta Bella and conducts
that traffic to the Magic/Princessa corridor. Main Street is the Bermite
Connector required by the General Plan.
Main Street establishes the pedestrian character of Porta
Bella. With its expanded pedestrian parkways, residents can walk safely to all
key elements of their community, including the village, parks, and school. This
pedestrian orientation reduces vehicular trips throughout the city.
(iv) The Magic/Princessa alignment does not unfairly
impact the Circle J residents. The proximity of the alignment to Circle J is far
better than the proximity of many other roads to adjacent residents. The
nearest Circle J residence to the Magic/Princessa alignment is 150 feet.. The
nearest Claiboume residence is approximately 500 feet. These distances
compare very favorably to the distances between residences who are adjacent
to other similar roads in the Santa Clarita area where the nearest residences
are within 50 feet of a major roadway. For example, consider the proximity of
McBean Parkway to many of the homes in Valencia. Although the
Magic/Princessa alignment is not needed to mitigate the impacts of Porta
Bella's traffic and was imposed upon the Applicant's proposal to satisfy
regional traffic concerns, the Applicant has offered to provide additional
buffering to minimize the impacts that the alignment might have upon the small
number of Circle J residents who are affected by the alignment. This buffering
includes earthen berms, landscaping, and setbacks. The addendum to the
E.I.R. states that this additional buffering (together with the distance) has
reduced all impacts of the alignment on affected Circle J residents to non-
significant levels.
(d) Oakdale Canyon Bridge. The continuation of Magic Mountain
Parkway to connect to Via Princessa to form the Magic/Princessa alignment
includes a bridge over Oakdale Canyon. The bridge will span approximately
400 feet between the ridges and is approximately 60 feet above the center of
the canyon at the bridges highest point and diminishing as the canyon's side
slopes ascend to the bridges abutments at each end. The proposed alignment
is designed to minimize the visual and noise impacts by utilizing the topography
Ms. Lynn M. Harris
October 9, 1994
Page 5
to conceal the road from the perspective of the Circle J community. Visual and
noise mitigation techniques include landform grading, construction of large
earthen berms and specific bridge design to lessen noise. As stated
previously, the E.I.R. has concluded that the impacts of this bridge will be
adequately mitigated by the proposed buffers and the natural terrain. Attached
to this letter is a preliminary study of this facility.
(e) Santa Clarita Parkway. As a replacement to Rio Vista Road,
the Santa Clarita Parkway alignment will conduct traffic flows more effectively
than Rio Vista and, accordingly, will serve the purposes of the General Plan. In
contrast to the alignment of Rio Vista Road, Santa Clarita Parkway avoids the
placement of two large 6 lane roads side by side and adjacent to the railroad
tracks. The replacement of Rio Vista with Santa Clarita Parkway relieves
adjoining neighborhoods from noise and dust, avoids disruption to the College
Campus, and eliminates property configurations which force properties to be
adjacent to roads on the front and backs sides of their property lines. Santa
Clarita Parkway also diverts traffic away from Placenta Canyon Road, thereby
helping to restore the privacy of that neighborhood. The proposed location of
the Parkway properly spaces the roads to provide better distribution of traffic
throughout the vicinity. Along much of this route, Santa Clarita Parkway is
devoid of adjoining development and affords scenic opportunities. It also
provides road access to portions of the. City to the south of Porta Bella which
formerly had no roads planned for the area.
The proposed Santa Clarita Parkway is feasible and is
comparable to Rio Vista Road in projected costs and displacements. The
preliminary designs which have been provided to staff and are attached
demonstrate that it is physically feasible to construct this parkway from
Bouquet Canyon Road intersecting Placerita Canyon Road and connecting to
the 14 freeway. The Applicant and its consultants have been careful to cause
the alignment to avoid traversing or interfering with improved properties and
businesses. The alignment is purposefully located westerly of the overhead
electrical transmission lines which also minimizes disruption to the existing oil
fields. Consequently, the estimated cost of this alignment is very similar to the
costs and displacements that would have been incurred if Rio Vista had been
retained as a major thoroughfare.
The Santa Clarita Parkway alignment has been studied in detail to
prove its feasibility. Those studies have been submitted to the City and have
been reviewed by the City's environmental and traffic consultants as part of the
project's traffic and circulation element. As discussed previously, phases of
development which depend upon the parkway cannot commence until the
parkway has been fully engineered to the reasonable satisfaction of the City.
This detailed engineering and corresponding right of way worst for the
Ms. Lynn M. Harris
October 9, 1994
Page 6
alignment will commence only after the alignment has been generally approved
as part of a specific plan for the area.
2. E.I.R. Alternative 4.
(a) Alternative 4 would result in an inferior project in comparison
to the Porta Bella proposal. The E.I.R. alternative 4 represents an inferior
project in comparison to Porta Bella. This alternative would use a rigid
application of the Hillside Ordinance to restrict all development in the Project to
slopes of less than 25%. As a practical matter, Alternative 4 would distribute
densities to the southern portion of the site in conflict with the Valley Center
Overlay and would intensify densities in vehicular dependant, disjointed and
isolated neighborhoods. As a result, Alternative 4 would "conflict with one of the
major changes made to accommodate the concerns of residents of Circle J;
the significant decrease in densities in the southern portion of the project
nearest to Circle J. Each of the foregoing points is discussed in more detail in
the following paragraphs.
(b) Alternative 4 would promote isolated 'leapfrog' communities
which would be antithetical to the pedestrian concept of the Porta Bella plan.
Altemative 4 would promote poorly distributed higher density development and
a 'leapfrog" neighborhood pattern by disregarding the unique characteristics of
this property. Traversing the predominant development areas are several
swales with side slopes that exceed 25%. This topography creates narrow
bands of alternating flat and hill terrain. If development were strictly confined to
areas with less than 25% slope, narrow, segregated strands or isles of
development would emerge.. This disjointed development pattern would
destroy the pedestrian quality of the proposed development and promote
dependence upon vehicular usage. This would result in the installation of
inefficient and expensive infrastructure to serve and connect the segregated
neighborhoods.
(c) Porta Bella complies with the purposes and objectives of the
Hillside Ordinance. In conjunction with the General Plan, the Specific Plan for
Porta Bella meets the objectives of the Hillside Ordinance. The Specific Plan
clusters development on slopes of less than 25%. It alters the ridgeline
landform only as a consequence of remedial grading for previous site
disturbance, for the installation of community facilities or due to geotechnical
considerations. Also, the Plan locates on the significant ridgeline community
facilities which the Hillside Ordinance specifically identifies and permits. In so
doing, Porta Bella preserves the significant ridgeline, maximizes contiguous
open space, provides community facilities available for public use and
maintains the landform.
It should be pointed out that this particular property is
characterized by significant amounts of highly disturbed terrain with marginal
V'
Ms. Lynn M. Harris
October 9, 1994
Page 7
environmental appeal. Therefore, the application of a rigid 25% slope
restriction to the unusual landforms of the property would merely serve to
preserve large amount of disturbed terrain at the expense of such objectives
as the Valley Center Overlay, proper density distribution, accepted standards
of good planning and design and pedestrian orientation.
(d) Alternative 4 would conflict with the Valley Center Concept of
the General Plan. A rigid 25% slope restriction would also promote poorly
distributed, higher density development in conflict with the Valley Center
Overlay. As currently designed, Porta Bella clusters development so that
development sometimes extends to contiguous areas that exceed 25%. Even
though the imposition of a rigid slope restriction would remove density from the
contiguous areas, the Hillside Ordinance and the applicable General Plan
elements would permit the transfer of the density to the remaining developable
area. This transfer would intensify densities in those areas to as much as 10
dwelling units to the acre if the transfer took place in the southern portion of the
property. If the transfer took place in the northern portion of the property, the
limited amount of developable area under the slope requirement would yield
excessively high densities. In effect, Alternative 4 may decrease overall
project density but it achieves this objective only by concentrating higher
densities in many areas of the project. Under the most logical density transfer
alternative, higher densities would be distributed to the southern portion of the
project in close proximity to Circle J (in contrast to Porta Bella). The effect of
this density transfer directly conflicts with the Valley Center Overlay and with
major statewide and local efforts to intensify development adjacent to
commuter rail facilities..
3. Site Investigation of Hazardous and Solid Materials.
(a) The California Environmental Protection Agency ("Cal -EPA")
is the recognized governmental authority for the remediation of hazardous
materials on the Bermite Property and Cal -EPA and Whittaker have been
conducting a careful and extensive investigation of the Property and
remediation effort since 1987. Cal -EPA is the recognized governmental
authority which is responsible for the supervision of any investigation of
hazardous materials on the Bermite Property and the remediation of any
hazardous material found as a result of that investigation. Cal -EPA has been
supervising the investigation and remediation of this property since 1987.
During that period, activities intended to identify, assess and remediate any
problems have been extensive.
(i) The Remediation of the 14 Permit Sites. Under new
environmental laws promulgated in 1980, Whittaker sought and received
permission in 1980 to operate 14 hazardous waste treatment, storage and
disposal sites on the Bermite Property, When Whittaker decided to cease
Ms. Lynn M. Harris
October 9, 1994
Page 8
those operations in 1986, Whittaker submitted closure plans to Cal -EPA and
the Environmental Protection Agency of the United States for those sites.
These closure plans triggered the process by which 13 of the 14 sites have
been fully certified as "cleaned closed". Some of these sites required no
remediation at all to obtain the clean closure certification. Whittaker continues
its state of the art efforts to remediate the 14th site and Whittaker and its
experts are optimistic that closure will occur is the near future.
(ii) Extensive Testing Throughout the Bermite Site. During
the period commencing in 1987, Whittaker conducted extensive testing and
investigation of the Bermite Property under the supervision of Cal -EPA. These
tests included soil borings, the installation of ten monitoring wells, ground water
samples and soil vapor samples at many locations throughout the property. In
fact, hundreds of soil cores and thousands of soil vapor and water samples
have been collected and tested to date.
(iii) 64 Sites Identified by Whittaker for Additional
Investigation. The 64 additional sites to which members of the public and the
Council constantly refer represent a very broad identification of any location on
the Bermite Property where any solid waste or hazardous material was or may
have been handled. The re -identification of these locations merely assists Cal -
EPA and Whittaker in their collaborative efforts to determine whether additional
investigations of the Bermite Property are necessary and to what extent. .
The 64 sites have been disclosed to governmental
agencies in the past. Some of the 64 sites have been the subject of many
investigations including extensive soil and soil vapor sampling and reports by
Whittaker, by Cal -EPA and by U.S. EPA as early as 1985. Several of the 64
sites were investigated and eliminated by Cal -EPA during the development of
the Metrolink Station.
The 64 sites should not be confused with the 14 permit
sites. The 14 permit sites represented active facilities which required permits in
1980 for their continued operation as active facilities for the storage and
handling of hazardous materials. In contrast, the 64 sites are sites where
historically there is some evidence that solid waste or hazardous material may
have been handled. These sites were identified from time to time through
timely searches and evaluations of numerous records and re-identified after
additional searches and evaluations.
(b) The conditions of approval for hazardous material have been
approved by Cal -EPA and subject the Project to intense supervision. As a
responding agency in the E.I.R. process for this Project, Cal -EPA has
confirmed that the hazardous materials conditions of approval for the project,
as currently approved by the Planning Commission, will effectuate the
Ms. Lynn M. Harris
October 9, 1994
Page 9
continuation of the thorough investigation of the Bermite site and any
necessary remediation. These conditions of approval for the project require the
Applicant to satisfy all requirements of Cal -EPA with respect to hazardous
materials, including site investigation and any necessary remediation arising
out of that investigation. The Applicant must satisfy these requirements prior to
the City's determination to issue grading permits. In addition, the conditions of
approval require all grading to be subject to the supervision of an on-site
inspector. That inspector will have the authority to halt grading activities if any
hazardous materials are discovered. No work can resume until the location of
any such discovery has been fully investigated and remediated to the
reasonable satisfaction of Cal -EPA. As discussed below, Whittaker and Cal -
EPA expect to enter into a complete agreement concerning the nature and
scope of those investigations which Cal -EPA will require to complete its
supervision of the property.
(c) The Consent Agreement between Cal -EPA and Whittaker is
expected to provide for the comprehensive investigation of the entire site at
one time. In November of 1993, Whittaker provided Cal -EPA with a detailed
report of all possible areas known where solid or hazardous waste may have
been handled or disposed. This response was not the result of legal action. It
was a voluntary response to a request for information from Cal -EPA. After the
submission of that response and in an effort to expedite the investigation of the
Bermite site, Whittaker submitted a work plan on May 3, 1994, well before any
request for such a work plan became part of any proposed consent agreement.
This work plan set forth a proposed plan for the thorough investigation of each
of those sites identified in its response to Cal -EPA where further action was
warranted. Subsequently, the Permitting Branch of Cal -EPA issued its first
draft consent agreement on May 18, 1994.
At this time, Whittaker has not yet received the anticipated final
consent agreement and, therefore, it is inappropriate for Whittaker to supply
the Council with any unauthorized versions of the agreement. A consent
agreement previously provided to the City Council by members of the public
was a working draft that has been marked 'Void and Invalid more Appropriate
Department Now in Charge." As a draft, this document does not represent the
considered conclusions of the issuing governmental authority and was
prepared before the appropriate governmental authority could complete its full
evaluation of all assembled technical information. Final signoff on the consent
agreement is anticipated to occur shortly. At that time, the final consent
agreement will be made available to the City Council.
After the delivery of the work plan in May, 1994, Whittaker met
with representatives of Cal -EPA to discuss the best mechanism for answering
all potential environmental questions which might be raised regarding the
Bermite Site. The consent agreement, which is expected to be finalized in the
Ms. Lynn M. Harris
October 9, 1994
Page 10
near future, is the result of those discussions. Whittaker has requested that
Cal -EPA look at an all encompassing assessment of the entire property to
avoid any future questions regarding a unit -by -unit or problem area only
approach to the site. This new agreement will provide the framework for
Whittaker and Cal -EPA to move from assessing discrete sites identified as
possible areas requiring investigation to a program where Whittaker voluntarily
will assess the entire site, without question as to jurisdiction of authority to a
specific area, in cooperation with Cal -EPA's Site Mitigation Branch. Further,
the consent agreement outlines a Public Participation Plan that provides the
framework for Whittaker and Cal -EPA to work cooperatively so that the public
and community are involved in Cal -EPA's decision making process.
The timing of future environmental work will be dictated by the
consent agreement which will include a rigorous schedule with initial due dates
occurring within 10 days after signing the agreement. The consent agreement
will include penalties for failure to comply up to $25,000 for each day Whittaker
is not in compliance. Further, State law requires Whittaker to provide, on an
annual basis, substantial financial assurances that it can fund the estimated
costs associated with the hazardous materials sites on the property. The
consent agreement and existing statues also allow Cal -EPA to take over the
environmental activities at the site if requirements of the final consent
agreement are not met.
In summary, the conditions of approval, as currently approved by
the Planning Commission, are consistent with Cal -EPA's jurisdiction over the
Bermite Property with respect to hazardous material investigation and
remediation. The Consent Agreement will identify in detail the scope of the
investigation that remains to be completed and the time frame for the
completion of that investigation. State law requires Whittaker to demonstrate
its financial ability to pay for the investigation and any projected remediation.
The Applicant must satisfy the requirements of Cal -EPA before the City makes
its determination to issue permits.
4. School Facilities. After discussions with the relevant school districts it
was determined that an elementary school is required. This school site has
been designated in the Porta Bella Specific Plan and further discussion reveal
that the project falls within the jurisdiction of two elementary school districts.
During meetings with the superintendents of these schools districts, each
expressed an interest in the site. However, further negotiations regarding the
acquisition of this site are pending the resolution of the boundary revision by
the two districts. At the time that the elementary school will be necessary to
serve the future residents of Porta Bella, the site will be processed for state
acceptance.. As is customary, if the state does not accept this site an
alternative location or the funds to secure an alternative site will be provided..
Ms. Lynn M. Harris
October 9, 1994
Page 11
5. Seismology and Grading.
The grading for Porta Bella has been designed to be compatible
with the proposed Civic Center site plan. Concurrent grading activities of both
sites is possible. If the Civic Center site is graded but construction of the Civic
Center building is subsequently delayed, acceptable techniques are available
to stabilize the site, including traditional erosion control as well as hydroseed
mixes employing native vegetation seed mixes.
In areas of fill, proper grading techniques including alluvial
removals, corrective grading, placement of subdrains, compaction of soil, and
slope maintenance provide for seismic stability. On lots which transition from
cut and fill, pads will be over -excavated with an additional layer of soil added to
stabilize the final design grade. This provides a layer of material to support the
structure's foundation. Grading of Porta Bella will be in accordance with the
codes and ordinances in effect or as updated to contemporary standards at the
time of permitting.
Bridge design will involve significant soil and geotechnical
investigation.
At the appropriate time, these constraints will be incorporated into the structural
design of the bridges. Final bridge design will incorporate any updated seismic
codes and design criteria to withstand future seismic events.
The design of Porta Bella is in conformance to the Alquist-Priolo
study area identified on site. Setbacks from the fault line have been
established pursuant to the extensive geotechnical and soils investigation,
including trenching, boring, and research. If new data is discovered which
raises additional concerns prior to obtaining grading permits, the proper
geotechnical mitigation will be included to the reasonable satisfaction of the
City.
We appreciate the opportunity to provide these comments. We
believe that these comments together with the volumes of analysis to which the
project has been subjected assures the City Council that the project is a viable
and positive contribution to the City. We respectfully request that you provide
these responses to the City Council to expedite its favorable consideration of
Porta Bella.
Very truly
gyqurs,
��cz:v,t ()
Salvatore J. Veltri