HomeMy WebLinkAbout1994-03-22 - AGENDA REPORTS - DEBRIS REMOVAL (2)•.- SUBSEQUENT NEED ITEM DATE: March 22, 1994 City Manager Approval Item tp be presented by: Adel Macpherson SUBJECT: Ratification and Extension of Debris Removal Contract with the California Conservation Corps DEPARTMENT: Parks, Recreation and Community Services On February 17, 1994, the City Manager approved an emergency contract with the California Conservation Corps (CCC) for debris removal services for the period of January 31, 1994 through February 28, 1994, in the amount of $1.2 million. The January 17 earthquake caused substantial damage to block walls and chimneys throughout the City of Santa Clarita. Due to the public health and safety hazard posed by these structures, the City contracted with the CCC to remove the debris to the point at which it was no longer a danger to the community. With an estimated 6,000 block walls damaged and 1,000 unsafe chimneys identified, it was determined that a contract extension would be necessary to ensure that the demand for services could be met. The attached Agreement Addendum provides for a one month contract extension through March 31, 1994, in the amount of $1.4 million. RECOMMENDATION That the City Council ratify the CCC contract for debris removal services approved by the City Manager on February 17, 1994 and approve an extension of the contract through March 31, 1994. ATTACHMENTS Exhibit A - CCC Debris Removal Contract for the period January 31, 1994 through February 28, 1994 Exhibit B CCC Debris Removal Contract for the period March 1, 1994 through March 31, 1994 its AD/SV Na .nd. ft " I D s s �pk�t ° �F��fff���!!!!I -... ,.... ,, ._..,,.a z:. ztv t•-.�.Vii CV12.F6 ,.i= �;�•� CCC -96A (12/22/9 -' CONTRACT ADDENDUM -- Agreement #: 94-5310-4868 Index # 7445 CCC Work Code: 94-9531 (CCC Contract Officer Assigns) (center Project Coordinator Assign. A] The California Conservation Corps (CCC), agrees to provide crew labor fo: the project titled (see CCG -58: Project Evaluation Form for detei(s): [E] The term of this agreement shall be: FROM: Jan. 31, TO: Feb. 28, C] Sponsor agrees to reimburse the CCC for estimated costs in accordance with the Fiscal Display: NOTE TO SPONSOR: Budget.. detail ui It not be provided on performance based contracts. FIRST YEAR FISCAL DISPLAY FY —/_ (see reverse if aotti-year) _ LABOR Hours Rate/Hr Tota) CM Regular Time: 21 600 $ 11.75 1 $253 800.00 CM Overtime: 38,880 $ 11.75 1 $456,840.00 Performance Contract Labor: $ 640-00 Staff BILLABLE Regular Time Total: $ 31 030.00 Staff Overtime Total: *101,200.00 EXPENSES 81,870.00 Equipment: $ 3,000.00 Tools: $ 2,000.00 Materials: $ 1,500.00 Vehicle operations: $ 20,160.00 (Motel/Per Diem) : $ 53,522.00 Food $160,000.00 See Section D. TOTAL: $1,164,922.00 D] The total amount payable by Sponsor to CCC under this agreement shall not exceed: $1,200,000.00 E] The CCC shall forward billing with supporting documentation in triplicate to Sponsor, — monthly, _ quarterly, _ yearly, A- at end of contract. Sponsor agrees to pay CCC within 60 days from receipt of bill. Date: Date:(J7'�i{ N Sponsor 0 z on: a STATE S j OF CALIFORNIA J California Conservation Corps nature Signature::Ii Print: /�J�Al t-/aG/?G Print: Title: /?� �. !fo L( z 9 c.t H4 Adni n. Services • SPONSOR MAILING`ADDRESS� T ` /4/�, Y SPONSOR BILLATYSS: EXHIBIT A LOCAL CCC CENTER VERIFICATTQN roject Coordinator usiness Services istrict Director FORWARD PAYMENTS TO: alifornia Conservation Corps ecounting/Receivables 530 Capitol"Avenue acramento, CA 95814 LOST ESTIMATES FOR SANTA CLARITA OPERATION l• Corpsmember time costs. II• Staff time costs. Food costs IV. Misc. a. Equipment b. Tools C. Materials d. Vehicle operations e. Per Diem (Staff) f. Other Assumptions: 1. 135 corpsmembers for 28 days. 2. Appropriate staffing level. 3. Corpsmembers time is calculated at: Mori -Fri 40 hrs. regular time Mon -Fri 40 hrs. overtime (Per FLSA Regulations) Sat -Sun (16 + 16) at 32 hrs. overtime (Per FLSA) 4. Staff time is calculated at 12 hr. shifts. Mon -Fri 40 hrs. regular time Mon -Fri 20 hrs, overtime Sat -Sun (12 + 12) 24 hrs. overtime (and holidays) 5. Meals for corpsmembers and crew supervisors will be contracted out to a caterer. 6. Overhead staff will be on Per Diem for meals and housing. I. PROJECTED FIGURES FOR COPRSMEMBERS: A. Calculation of hours at a 7 day week: 1. Mon -Fri 40 hrs. regular time per corpsmember Mon -Fri 40 hrs. overtime per corpsmember Sat -Sun (16 + 16) at 32 hrs. overtime per corpsmember. page 2. 2. 135 corpsmember at 40 hrs. = 5,400 firs. 135 corpsmember at 72 hrs. = 9,720 hrs. 3. 4 weeks at 5,400 hrs. per week regular time: 21,600 hrs. 4. Costs: Regular. 21,600 hrs. at $11.75 = $253,800.00 Overtime: 38,880 hrs. at $11.75 _ $456,840.00 $710,640.00 H. STAFF TIME: Assumptions: 1. 2, 3. 4 weeks at 40 hrs. regular time per week = 160 hrs. regular time. 4 weeks at 20 hrs = 80 hrs; plus 4 weekends at 24 hrs. = 96 hrs. = 176 hrs. overtime. 4 weeks = 28 days A. Conservation Administrator (CAII) (.5) 1 Regular time 160 hrs. at $27.00 per hr. = $4,920 Overtime 170 hrs. at $40.00 per hr. _ $7,040 $11,960 divided by 2 Total $ 5,980 *(.5 = 1/2) M page 3. B. Business Service Officer (BSO) 1. Regular time 160 hrs. at $220.00 per hr. = $3,520 Overtime 176 hrs. at $31.00 per hr. = $5,456 $8,976 divide by 2 Total $4,488 C. Conservationist Supervisor (CS), (1) 1. Regular time 160 hrs. at $24.00 per hr. = $3,840 Overtime 176 hrs: at $ 36,00 per hr. $6,336 Total $10,176 D. Conservationist II's (CII's), *(3.5) 1. Regular time 16phrs. at $22.00 per hr. = $4,180 Overtime 176 hrs. at $33.00 per hr, = $5,808 $9,988 X 3.5 Total $34,958 *Division Leaders 1 Logistics Assistant .5 Safety Officer E. Clerk (1) 1. Regular time 160 hrs. at $15.00 per hr. = $2,400 Overtime 176 hrs. at $22.00 per hr. = $3,872 Total $6,272 page 4. F. Conservationist I (Cl) Crew Supervisor (12) 1. Regular time 160 hrs. at $17.00 per hr. = S 0 Overtime at 176 hrs. at $26.00 per hr, = $4,576 * First 40 hrs. per week regular time is not charged. Total $54,912 G. Special Corpsmember (3) Night Duty 1. Regular time 160 hrs. at $12.00 per hr. = $1,980 Overtime 176 hrs. at $18.00 per hr.. = $3,168 A. CAII (.5) B. BSO (.5) C. CS (1) D. CII (3.5) E. CLERK (1) F. CI's (12) G. SPEC (3) TOTAL STAFF 21.5 $5,148 X3 Total $15,444 SUMMARY REG. O.T. TOTAL 2,460 3,520 5,980 1,760 2,728 4,488 3,840 6,336 10,176 14,630 20,328 34,958 2,400 3,872 6,272 -0- 54,912 54,912 5,940 9,504 15,444 5 31,030 $101,200 $132,230 page 5. III. FOOD (Contracted caterer) 140 meals X 29 days = 3,920 days x 40.00 per day $156,800.00 rounded off to $160,000.00 IV.. MISC. D. Vehicle Operations: 20 Vehicles at 100 miles a day (average), for 28 days at .36 per mile.,, 20 vehicles X 100 miles = 2,000 miles X 28 days 56,000 miles x .36 a mile $ 20,160.00 E. Per Diem (Overhead Staff) Assumption: 21.5 staff assigned for 28 days Motel average of $62.00 Per Diem 5.50 breakfast 9.50 lunch 17.00 dinner 5.00 incidental $ 37.00 1. Accommodations (Motels) average 18 staff (some double occupancy) 18 staff X 28 days = 504 days at $62.00 per day = $31,248.00 page 6. 2. Per Diem 21.5 staff X 28 days = 602 days at $37.00 per day = $22,274.00 Summary: Motel 31,248 Per Diem 22,274 S 53,522 F. Other, (Laundry) 20.00 Laundry Fund 7.00 Soap & Bleach 27.00 Per wash, per crew 10 Crews 270.00 4 Wash cycles per 28 days 1,080.00 M COSTS ESTIMATES FOR SANTA CLARITA OPERATION I. CORPSMEMBER TIME COSTS II. STAFF TIME COSTS III. FOOD COSTS IV. MISC; A.) EQUIPMENT B.) TOOLS C.) MATERIALS D.) VEHICLE OPERATIONS E.) PER DIEM (STAFF) F.) OTHER (Laundry) $ 710,640.00 $ 132,230.00 $ 160,000.00 $ 3,000.00 $ 2,000.00 $ 1,500.00 $ 20,160.00 $ 53,522.00 $ 1,080.00 CALIFORNIA CONSERVATION CORPS -- PROJECT EVALUATION FORM -- fA1 PROJEcT nama CCC -58 Pg 1 (12/23/9 Work Code: IDiStrict Code: District: CCC Contract #: Resource Category: Project Title: Project Description: Earthquake - Disaster Mitigation Includes but may not be limited to`'.the follovainq: 1.) Debris Removal 2.) Water distribution 3.) DAC operational assistance 4.) Chimney and Block Wall hazard reduction (demolition and removal) Project Evaluator: M B] SPONSOR INFORMATION [C] EMERGENCY RESPONSE INFORMATION CDP Incident #: CDP Request #: OE8 Mission Assignment ( NSA NSA 94-1101 CCC Index #: 7445 Corpsmember Overtime Pay Serial #: HQ Reference #: [D] ESTIMATE INFORMATION [E] WORKSITE INFORMATION Hours: Reg: 21,000 Directions to Work Location (use cross streets or Overtime: 39,000 landmarks) : Start Date: 1_31_94Various locations throughout the City of Santa Clarita FOR HQ USE ONLY Received: Analyst: ZIP: 91355 I County Code: County: Los Angeles initial and date Logged: Entered: erified: Checked: CCC -58 pg 2 (12/23/92 [G] EDUCATIONAL ACTIVITIES SPONSOR: Educational presentation to increase Length of time Corpsmember understanding of the natural environment I scheduled: Health and Safety training which relates directly to the work to be performd CCC: The CCC will be doing the following work/learn Length of time activities, scheduled: [H] EQUIPMENT & MATERIALS To be supplied by SPONSOR: Qty Description To be supplied by CCC: Qty Description 'Ib be negotiated by the sponsoring agency and the C.C.C. at the Project Planninq t4eetin s which will take place prior to the beginning of the proTec Special SPIRE equipment needed by crew: Basic hand tools - wheel barrels - climbing belts/harnesses and rope - sleeping `gags - personal safety gear (Bard Hats - goggles - steel toed boots) foul weather jackets and work gloves - rain gear. SPIRE Information (description and location of housing): The City of Santa Clarita Warehouse: 25653 W. Avenue Stanford, Santa Clarita, CA 91355 •f CCC -58 pg 3 (12/23/ [I] NARRATIVE ON HOW PROJECT WILL MEET ALL LEGISLATIVELY MANDATED OBJECTIVES (Assign a numerical rating: 1=low, 2 --Medium, 3❑high);; Conserving, improving, developing natural resources maintainin environmentally important lands or waters: g RATING: 1 rroviaing public benefit or access (Estimated vistor use, RATING: increased safety, reduced maintenance costs, etc.): 3 Providing Corpsmembers with opportunities for training in RATING: employable skills (e.g. specific tools and use, fire control, carpentry): 2 [J] PROJECT CHECKLIST & SIGNATURE BLOCKS SIGNING THIS DOCUMENT VERIFIES THAT: ❑ A CCC -96 (Sponsor Agreement) has been filed. ❑ If a reimbursable project, a CCC -96A or STD -13 agreement has been submitted to HQ. ❑ If the sponsor is a non-profit entity, a statement of non-profit stats is attached. ❑ If sponsor is a for-profit entity, written authorization from HQ is attached. ❑ The project conforms to CCC Health & Safety Program guidelines (Sectic G-3) and a CCC -175 (Job Hazard Analysis) is on file at the District. Print Project Coordinator: istrict Director: Nacho P.ina� 1• ❑ The sponsor has provide hazardous substances'r at ah sign Date: 1-31-94 Date: 1-31-94