Loading...
HomeMy WebLinkAbout1994-03-22 - AGENDA REPORTS - EMERGENCY HVAC REPAIR BLDG (2)M AGENDA REPORT Council A Item to be presented CONSENT CALENDAR DATE: March 22, 1994 SUBJECT: Emergency HVAC Repair Contract for City Hall Building DEPARTMENT: Public Works BACKGROUND: The City of Santa Clarita faces an emergency situation based upon earthquake damage which was suffered by the City Hall as a result of the earthquake which occurred on January 17, 1994 and subsequent aftershocks. Damage to the City Hall resulted in a threat to public safety and prevented the safe use of the City Hall without the accomplishment of urgent repairs to the City's heating, ventilation, and air conditioning (HVAC) system. This agenda item identifies the processes to correct the damage. Heating Ventilation and Air Conditioning System: Four contractors were given the opportunity to bid on correction of the HVAC system. The results of the bids are listed below: 1. Honeywell 2. Intertex 3. Marco Heating & Air Conditioning 4. Al Ocean Breeze Air Conditioning $125,000.00 $ 87,000.00 No response No response Intertex submitted the lowest, most qualified bid to complete the urgent repairs which will enable City personnel to carry out the basic functions of City government. Because of the urgent need to accomplish these repairs prior to an opportunity for City Council approval, the City Manager (Director of Emergency Services), under the authority of the California State Public Contract Code, Section 22035, Emergencies, Procedure (See Attachment 1) entered into these contracts (See Attachment 2, pages 1-9) on March 3, 1994, to be ratified by the City Council at the earliest opportunity. RECOMMENDATION: Staff recommends that the Council ratify said contract with Intertex of California, Inc. for emergency repairs, not to exceed $90,000.. Therefore, authorize staff to expend $90,000 from account 01-9999-999. APPROVED Attachment 1 § 22088 PUBLIC CONTRACT CODE Hlsmrlai NK sad amendmcnt by Stan 1914 e. 1019. See Historical Nae s 19" g 511111 n.111. undo Bum A Rot: C 15618.3. Reaumberina or this section m 121903 sad amendment S by SUM 1914 a 2411, van atbordimted m is renumbering 1 22034. Informal bidding ordinance Each public agency which elects to become subject to the uniform construction accounting 1 .. procedures set forth in Article 2 (commencing with Section 22010), shall enact an informal bidding ordmaom to govern the selection of contractors to perform public projects pursuant to subdivision (b) bi of Section 22082. The ordinance shall include all of the following: _ be (a) The public agency shall maintain a list of qualified contractors, identified according to th categories of work. Minimum criteria for development and maintenance of the contractors list shall ju: be determined by the commission. �Lydiction of the public agency,' cabiicatiol ency a (b) All contractors on the list for the category of work being bid or all construction trade journals within the jurisdiction of the p 8 specified in Section 22038 or both all contractors on the list for the tate of work beim bid and public agency as Places for the journals Of all construction trade j urns e i n on 3 shall mat a notice inviting informal mailed all construction trade j F bids unless the product or service m proprietary. least 30 calendar days before the date of (c) AQ mailing of notices to contractors and construction trade journals pursuant to subdivision (b) section, the public agency may give such c shall be completed not less than 30 calendar days before bids are due.. (Formerly 1 21207, added by Stata•1993, c. (d) The notice inviting informal bids shall describe the project in general terms, how to obtain more bered 1 22037 and amended by Stats.1986, deuced information about the project, and state the time and place for the submission of bids. evtorical Nan , (e) The governing' body of the public agency may delegate the authority to award informal dam contracts to the public works director, general manager, purchasing agent, or other appropriate picn=berus of this wfiton a 4 21907 and .roar person. _ _ y Sus1986, e. 249, wsa s,bold,,,tcd tom rm" of e a e may passage o a naso ution Fv a tot contrac at 22038 Rejection of bids: statement o ( ng ty o n 000) or ess W e lowest res22= a er tt etermmee a cost 1 section estimate of—t the yubiic agency was reasons e. Test of section (Formerly 1 21204, added by Stats -1993, a 1054, 1 1. Amended by Stats.1984, c. 758, 1 4. Renum- bered 1 22034 and amended. by Stats.1986, c. 1019, 1 55; Stata.1989, c. 241, 13.) (a) In its discretion, the public agency t HYlwkal Neta and jeendment by Sumi984 a 1019. See Historied Note for bids all bids are rejected, the Public tfle leydatlaa under Boa a Prof. C 1 $678.5. reevaluating its cost estimates of the pro] Renumbering Of this sectim a 1 21904 and unrndment following: by Stam 1964 e. 248, was wbordiated to in renumbering (1) Abandoning the project or teadve 1 2203L Emergencies; procedure (2) By passage of a resolution by a fou can be performed more economically by Incases it great emergency, as determined by the governing body of the public agency, including, done by force account without further c but not cemen to, crates es ary to per defined m Section 8558 of the Goverment Code, when repair (b) If a contract is awarded, it. shall I or replacements are necessary to permit the continued conduct of the operation or servicer of a public agency or to avoid danger to life or property, the governing body by majority vote, may bids are the same and the lowest, the sheets, or working deroceed at once to tails, or grvace or �mg not, public for bide to let coout ntractap The work specifications, y�be done,strain by day (c) If no bids are received, the proje orb informal biddu labor under the direction of the governing body, by contract, or by a combination of the two. The ajoforce account, this article.e. governing body, by mr, vote, may delegate to the appropriate county administrative officer or complying city manager the power W a public emergency subject to confirmation by the governing body, F (d) Any etatemeat of reasons for the by a four-fifths vote, at its next meeting.. constitute s new cause of action seF (Formerly 121206, added by Stats.1983, c. 1064, 1 1. Renumbered 1 22035 and amended by available to the bidders. Ststa.1986, t 1019, 1 5&) This section shall remain in effect c Hywled Nap and uNod cu y Sun 1984 c. 1019. Sea Hiato&g Nae unless a later enacted statute, which i l9ai [ adalalna under Bum A Prof. C 1 $678.3. Renumbering of this section a 1 21905 and amersdmeat (Formerly 121208 added by Stats -198 ysawin m su19a4 249, wbm iia red b ren to its bered 1 22038 and amended by Stats-- I tats:1 2203L • Determination of construction trade journals to receive notice of informal and formal For tat of section construction contracts 22038. Rejection of bide, optlone 7be commission shall determine, on a coutia -county basis, the appropriate construction trade 1 Tat of journals which shall receive mailed notice of al innf[ormal and formal construction contracts being bid for work within the specified county. (a) In its discretion, the public age! (Formerly j 21206, added by Stats.1983, c. 1054, 1 1.. Renumbered 122038 and amended by of bids all bids are rejected, after re Stats.1986, e. 1019, 157.) shall have the option of either of thf Additions In teat are indicated by underilnr, deletions by asterisks • ' ' Additions in text are Inc 126 Attachment 2 CONTRACT AGREEMENT CITY HALL FACILITY PROJECT NO. 94-0* EMERGENCY SEISMIC REPAIRS This Contract Agreement Is made and entered Into for the above -stated project this 2s day of Fahrnar�z 19 94 BY AND BETWEEN the City of Santa Clarita, as AGENCY, and TnrArtex as CONTRACTOR. WITNESSETH that AGENCY and CONTRACTOR have mutually agreed as follows: ARTICLE 1 That contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Proposal, General Specifications, Standard Specifications, Special Provisions, Plans, and all reference specifications, details, standard drawings, special drawings and appendices; together with this Contract Agreement and all required bonds, Insurance certificates, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, or extending the work contemplated as may be required to Insure its completion In an acceptable manner. All of the provisions of said contract documents are made a part hereof as though fully set forth herein. ARTICLE 11 For and In consideration of the payments and agreements to be made and performed by AGENCY, CONTRACTOR agrees to furnish all materials and perform all work required for the above -stated project, and to fulfill all other obligations as set forth In the aforesaid contract documents. ARTICLE 111 CONTRACTOR agrees to receive and accept the prices set forth in the Proposal as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance Include those for well and faithfully completing the work and the whole thereof In the manner and time specified In the aforesaid contract documents; and also Including those arising from actions of the elements, unforeseen difficulties or obstructions encountered In the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work. ARTICLE IV AGENCY hereby promises and agrees to employ, and does hereby employ, CONTRACTOR to provide the materials, do the work, and fulfill the obligations according to the terms and conditions herein contained and referred to, for the prices aforesaid, and hereby contracts to pay the same at " the time, in the manner, and upon the conditions set forth In the contract documents. ARTICLE V CONTRACTOR acknowledges the provision of the State Labor Code requiring every employer to be Insured against liability for worker's compensation, orto undertake self -Insurance in accordance with the provisions of that Code, and certifies compliance with such provisions. Contractor further acknowledges the provisions of the State Labor Code requiring every employer to pay at least the minimum prevailing rate of per diem wages for each craft classification or type of workman needed to execute this contract as determined by the Director of Labor Relations of the State of California. ARTICLE VI CONTRACTOR agrees to Indemnify, defend and hold harmless AGENCY and all of Its officers and agents from any claims, demand, or causes of action, including related expenses, attorney's fees, and costs, based on, arising out of, or In any way related to the work undertaken by CONTRACTOR hereunder. ARTICLE VII CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter In execution of this Contract Agreement represent all Individuals, fine members, partners, Joint venturers, and/or corporate officers having principal Interest herein. Attachments 'The City of Santa Clarita faces an emergency situation based upon earthquake damage which was suffered by the City Hall as a result of the earthquake which occurred on January 17, 1994 together with the following aftershocks. Said damage to the City'Hall resulted in a threat to public safety and prevented the safe use of the City Hall without accomplishment of urgent repairs. The contractor has submitted a bid to accomplish the urgent repairs to enable City personnel to carry out basic functions of City government. Because of the urgent need to accomplishthese repairs prior to an opportunity for City Council approval, the City Manager (Director of Emergency Services)'will enter into this contract to be ratified by the City Council at the earliest opportunity. 3 _ REQUEST FOR PROPOSAL FOR HVAC EARTHQUAKE DAMAGE REPAIR SCOPE OF WORK 1, Remove the air conditioning unit AC -2 from the roof,. Physically remove the existing supporting I Beam structure and install a new structure. 2. Install new seismic mounts on new supporting structure. Weld mounts securely to structure. Remount air conditioning unit on new mounts. 3. Weld air conditioning units securely to new seismic mounts. 41. Remove damaged seismic mounts on AC -1 and AC -2. Install new seismic mounts. 5. Reseat all air conditioning units on support structures. Securely weld seismic mounts to support structures. Weld air conditioning units to seismic mounts. 6. Paint, all new steel work and welds. 7. Disconnect all electrical from each unit. Thoroughly verify integrity of each high and low voltage wiring circuit from air conditioning unit to power source. Replace any damaged wiring and conduit. Reconnect all power after circuits are verified. 8. Replace all flex conduit for high and low voltage on each air conditioning unit. 9. Install seismic restraints on boiler'. 10. Install seismic restraints on both hot water pumps. 11. Adjust all seismic mounts and restraints, (AC Units, Boiler, and Hot Water Pumps), for properoperation. All seismic adjustments to be performed by factory 'representative. 12. Remove all pipe insulation from hot water system piping. Repair any leaks. Lnstall new support structure for piping. Reinsulate piping. 13. The above proposal includes all cranes, permits, and fees. 14. Perform startup and checkout on all heating and air conditioning systems. Repair any minor problems found. 15. Balance HVAC airflow upon completion of work. 0 The preceding work will be performed for a not to exceed cost of $90,000. Not included in the above scope of work is the repair of any major problems which may become evident when power is restored to the air conditioning units. The units have been visually inspected and no major problems are evident. If major problems are found, a separate estimate for their repair will be requested. 5 ADDENDUM 1 REQUEST FOR PROPOSAL FOR HVAC EARTHQUAKE DAMAGE REPAIRS FEBRUARY 24, 1994 This addendum is in addition to the Proposal for the above identified service and modifies the original as noted below. The original scope of work remains the same. Item 16, All seismic mounts to conform to 1991 Santa Clarita Building Code for essential structures. C ADDENDUM 2 REQUEST FOR PROPOSAL FOR HVAC EARTHQUAKE DAMAGE REPAIRS FEBRUARY 24, 1994 This addendum is in addition to the Proposal for the above identified service and modifies the original as noted below. The original scope of work remains the same. -- ADDITIONAL INFORMATION: Time Framer The work project, two weeks Time and Date Due: The noon same Pricing: shall begin immediately upon award of with a required finish date not to exceed from the first day of work. deadline has been extended from 12:00 Friday, 2/25/94 until 5;00 p.m, on the day. 1. Prices should be based on time and material costs; with a not to exceed amount. 2. List two totals. For the first total, include Items 1 through 14, and Item 16. The second total shall include only the Air Balancing: Item 15. General Contractor's Responsibility: Duct work only. Plans: Plans or prints of the mixing boxes and duct work are not available at this time; please prepare your bids based upon the information provided herein. Selection Criteria: Selection will be based pricing, references and the demonstration of your ability to adhere to the time frame required. 7 IN WITNESS WHEREOF the parties hereto form themselves, their heirs, executors, administrators, successors, and assigns do hereby agree to the full performance of the covenants herein contained and have caused this Contract Agreement to be executed in triplicate by setting herduntQ their names, titles, hands, and seals this day of 1 t In r CONTRACTOR: License No. ✓ 9219 AGENCY Business License No. (Not Applicable) Federal Tax Identification No. Subscribed and sworn to this NOTARY AGENCY: Attest`. City Approved as to Form:, day of (/May r f the City of Sant; t -�,csC2l a Clao of the Ctty of anta Clarlta 3 19 v . 7 _ G Date State of_("I�a y County of,4 5 C2099L!2�/) } Ong before me ^ 0, , 2 �7xf, DATE NAME, TITLE OF OFFICER - E.G., personally appeared A_A� NAME(S) OF SIGNER(S) personally known to me - OR - roved to me on the basis of satisfactory eviicLence to be the person(s) whose name(s Is re subscribed to the withi Instrument and ac- knowledged to m th he he/they executed the same i his her/their authorized _ capacity(ies), and that is/ r/their •?aL SEAL signature(s) on the instrument the person(s), GERI �' DAMS or the entity upon behalf of which the IC CALIFORNIA s Les CO 1MY person(s) acted, executed the instrument. py. pkes APR 22, 1994 OPTIONAL SECTION � CAPACITY CLAIMED BY SIGNER Though statute does not require the Notary to fill in the data below, doing so may prove invaluable to persons relying on the document. INDIVIDUAL ❑ CORPORATE OFFICER(S) TITLE(S) PARTNER(S) LIMITED GENERAL ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: SIGNER IS REPRESENTING: WITNESS my hand and official Seal. NAME OF PERSONS) On ENT IES X11 J �C�C- J .LSC/'� SIGNATURE OF NOTARY OPTIONAL SECTION THIS CERTIFICATE MUST BE ATTACHED TO TITLE OR TYPE OF DOCUMENT THE DOCUMENT DESCRIBED AT RIGHT: _ NUMBER OF PAGES DATE OF DOCUMENT r Though the data requested here is not required law, SIGNER(S) OTHER THAN NAMED ABOVE II could prevent fraudulent reattachment of this form. 992 NATIONAL NOTARY ASSOCIATION • 8236 Remmet Ave., P.O.. Bon 7184 • Canoga rant, �A amus -r iav 9