HomeMy WebLinkAbout1994-10-11 - AGENDA REPORTS - EMERGENCY ST RESTORATION WORK (2)_ ►11 : G • 1 C 1 Ar City Manager Approv Item to be presented by: [� Anthony J. Nisic4& ' / CONSENT CALENDAR DATE: October 11, 1994 SUBJECT: EMERGENCY STREET RESTORATION WORK - "OFF -SYSTEM ROAD" PLACERITA CANYON ROAD FROM 12TH STREET TO SIERRA HIGHWAY PROJECT NO. 95-905 (AWARD PROJECT) DEPARTMENT, Community Development BACKGROUND Following the January 17, 1994 Northridge earthquake, Caltrans, out of necessity, detoured southbound Antelope Valley Freeway traffic off at Placerita Canyon Road in the City of Santa Clarita in order to route traffic southerly onto Sierra Highway to by-pass the damaged freeway structures on the SR -14 and I-5. However, there were others that chose to take Placerita Canyon Road towards their destination. In this sense, Placerita Canyon Road became an "Unofficial Detour Route". Although a portion of this roadway between 12th Street and Sierra Highway is considered 'Private', commuters do not make a distinction unless there is a physical barrier limiting their access. The additional traffic on Placerita Canyon Road caused undue wear on the roadway. The Federal Emergency Management Administration (FEMA) recognized this fact and approved funding for the restoration of the roadway. On March 28, 1994 the following bids were received by the City Clerk: Company Bid Amount Asphalt Maintenance Co., Visalia, California $55,850.00 California Pavement Maintenance Co., San Diego, California $65,737.00 The Engineer's Estimate for this project was $44,030.00. The award of this project has been pending due to negotiations between the City and the Placerita Canyon Home Owner's Association. The major issues have been resolved and therefore, the project is ready to be awarded. APPROWED, r. PLACERITA CANYON ROAD (AWARD PROJECT) October 11, 1994 Page 2 In addition to the contract cost, there are approximately $15,000 in engineering costs to cover design, contract administration, and inspection bringing the total project cost to $70,000. Reimbursement of funds expended for this project are being requested from the Federal Emergency Management Administration (FEMA). Prior appropriation of $35,000 has been set aside in Account No. 90-29936-227, Account Nos. 90-29936-227 and 02-29936-227 have been established to track all costs associated with the project. RECOMMENDATION Award the contract to Asphalt Maintenance Company of California in the amount of $55,850.00. Appropriate an additional $8,877 to Expenditure Account No. 90-29936-227 and to increase Estimated Revenues in Account No. 90-3597 for an equal amount. Appropriate $26,123 to Expenditure Account No. 02-29936-227 from Gas Tax Fund Balance. Location Map BY:lkl uncil\A69 W5.by It LOCATION MAP N T. S. Souqua ROAD SOLEDAo Y;qg Canon E 3 Country N B �{UOle0aia 0 SANTA CLARITA 7 y Z OQ A A r _c� CANYON R onD C N.T.S. Newhall CRY OF SAMA S AN RA C LEGEND ® = PROJECT SITE LOCATION LOCATION MAP N T. S.