HomeMy WebLinkAbout1994-10-11 - AGENDA REPORTS - SLOPE REPAIR PROJ ACCEPT (2)AGENDA REPORT
CONSENT CALENDAR
DATE: October 11, 1994
City Manager
Item to be pre
P'�
`Anthony J. Nisich
SUBJECT: SLOPE REPAIR - SIERRA HIGHWAY AT CITY LIMITS
PROJECT NO. 95-907 - PROJECT ACCEPTANCE
DEPARTMENT: Community Development
BACKGROUND
At the meeting of July 12, 1994, Council authorized the Mayor to enter into a contract under
the authority of the California State Public Contract Code, Section 22035 Emergencies
procedure, for emergency slope restoration related to the January 17, 1994 Northridge
earthquake.
C.A. Rasmussen, Inc., Simi Valley, California, has completed emergency slope restoration
work on Project No, 95-907, Sierra Highway at City limits. This project was completed to the
satisfaction of the Director of Community Development on July 16, 1994, for a total project
cost of $650,000.00.
RECOMMENDATION
1. Council accept the work, performed by C.A. Rasmussen, Inc.
2. Council direct the City Clerk to file the attached Notice of Completion for the project.
3. Staff be directed to release the ten percent retention 35 days after the Notice of
Completion is recorded, provided no stop notices, as provided by law, have been filed.
ATTACHMENT
Notice of Completion of Public Improvement and Work.
BRB:lkl
uui1 .,95 907.6,6
Agenda Item:
When Recorded, Please Return To:
Donna Grindey, City Clerk —
City of Santa Clarita
23920 Valencia Boulevard, Suite 301
Santa Clarita, California 91355
NOTICE OF COMPLETION OF
PUBLIC IMPROVEMENT AND WORK
NOTICE IS HEREBY GIVEN that the City of Santa Clarita, Los Angeles County,
California, has caused a public improvement, to wit:
EMERGENCY SLOPE REPAIR
PROJECT NO. 95-907
SIERRA HIGHWAY AT CITY LIMITS
to be constructed upon the property hereinafter described. The contract for furnishing of all
plant, labor, services, materials and equipment and all utilities and transportation, including.
power, fuel and water, and performing all work necessary to construct and complete, in a
good and workmanlike manner in strict accordance with the specifications, plans, and
drawings therefore on file in the office of the City Clerk of the City of Santa Clarita, for the
construction, installation, and completion of the above describedpublic improvement' and
work, was heretofore made and entered into with C.A. Rasmussen, Inc. on the 9th day of }
June, 1994, and filed for record in the office of the City Clerk of the City of Santa Clarita;
that the work upon said public improvement was actually completed on the 16th day of July,
1994 and that the Community Development Director has notified the City Council that she
has made and completed a final inspection of the materials furnished and installed and the
work performed in the construction, installation and completion of said public improvement
hereinabove more particularly described and set forth in, and has certified in writing to the
City Council that all of the provisions of the contract and contract documents for the
furnishing of all plant, labor, services, materials, and equipment, and the performing of all
work necessary for the construction, installation and completion of said public improvement
above described have been fully complied with to her satisfaction as required by the contract
documents; that final acceptance of the construction, installation and completion of said
public improvement above described was made on the 16th day of July, 1994 that the nature
of the title to said property improvement in fee except for the right-of-way upon which it is
constructed, and that it owns an easement upon, over and along said right -o£ --way for the
purpose of the construction, installation, and completion of said public improvement
hereinabove referred to and on which said public improvement is situated is described as
follows:
Sierra Highway at City Limits
0
AGENDA REPORT
CONSENT CALENDAR
City Manager
Item to be presented
TA'W-/�Anthony J. Nisich
DATE: October 11, 1994
SUBJECT: SLOPE REPAIR - SIERRA HIGHWAY AT CITY LIMITS
PROJECT NO. 95-907 - PROJECT ACCEPTANCE
DEPARTMENT: Community Development
At the meeting of July 12, 1994, Council authorized the Mayor to enter into a contract under
the authority of the California State Public Contract Code, Section 22035 Emergencies
procedure, for emergency slope restoration related to the January 17, 1994 Northridge
earthquake.
C.A. Rasmussen, Inc., Simi Valley, California, has completed emergency slope restoration
work on Project No. 95-907, Sierra Highway at City limits. This project was completed to the
satisfaction of the Director of Community Development on July 16, 1994, for a total project
cost of $650,000.00.
RECOMMENDATION
1. Council accept the work performed by C.A. Rasmussen, Inc.
2. Council direct the City Clerk to file the attached Notice of Completion for the project.
3. Staff be directed to release the ten percent retention 35 days after the Notice of
Completion is recorded, provided no stop notices, as provided by law, have been filed.
ATTACHMENT
Notice of Completion of Public Improvement and Work.
BRB:lkl
..nv .,9590].6,b
Agenda Item:
NAME OF SURETY ON MATERIAL AND LABOR BOND:
} Employers Insurance of Wausau, A Mutual Company
J 30851 W. Agoura Road, Suite 100
Agoura Hills, CA 91301-4312
DATED this day of 19
George Pederson, Mayor
City of Santa Clarita
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES) §
CITY OF SANTA CLARITA j
I certify or declare that under penalty of perjury that the foregoing is true and correct.
ATTEST:.
Donna M. Grindey, City Clerk Date
City of Santa Clarita
RGN:IkI
%� endciui \aiemrwc.rgn