Loading...
HomeMy WebLinkAbout1995-08-22 - AGENDA REPORTS - BID AWARD SOUTH FORK TRAIL (2)AGENDAREPORT City Ma 9ger Appro I Item to be presented by: Rick Putnam CONSENT CALENDAR DATE: AUGUST 22,1995 SUBJECT: BID AWARD FOR SOUTH FORK TRAIL PHASE IV DEPARTMENT: PARKS, RECREATION, AND COMMUNITY SERVICES At its regularly scheduled meeting of November 22, 1994, the City Council authorized staff to enter into a design contract with David Evans and Associates, Inc. with respect to construction of the South Fork'l�-ail Phase IV. The design phase has been completed and the bid phase was started on July 20, 1995. The South Fork Trail Phase IV project is a 16 -foot -wide, 6,600 -foot -long bicycle and pedestrian trail located between Magic Mountain Parkway and McBean Parkway along the southerly corridor of the South Fork River Channel (see attached map). Easement agreements have been granted previously from The Newhall Land and Farming Company under the Valencia Town Center Agreement dated February 1992, Bid advertisement began on July 20 and the bid opening was held on Tuesday, August 8, 1995. Seventeen bid packages were purchased during the bid period, and eight bids were subsequently received by the City Clerk, The Engineer's Estimate for the base bid for this project is $410,000.00. The following bids were received: Company R. C. Becker and Son, Inc, Western Paving C. A. Rasmussen, Inc. Granite Construction Stevens Construction Los Angeles Engineering Terra Cal Excel Paving Location Santa Clarita Monrovia Simi Valley Watsonville Lancaster Baldwin Park Baldwin Park Long Beach $ 447,468.70 $ 482,721.00 $ 490,994.05 $ 505,940.00 $ 513,000.00 $ 516,734.00 $ 552,858.90 $ 635,742.00 Bid Award for South Fork Trail Phase IV August 22, 1995 Page 2 A project budget of $400,000.00 has been established in the fiscal year 1995-96 budget from developer funds, Proposition A funds, and TDA3 bikeway funds. An additional $50,000.00 of developer funds is available via the existing Valencia Town Center Trail Agreement and $45,000.00 savings (previously allocated by the City Council) from the Bouquet Canyon Trail Phase II project. The total available funding for this project is $495,000.00. Based on the available funding, staff is proposing to pursue the base bid at this time. R. C. Becker and Son, Inc. is the lowest responsible bidder for this project. Reference checks indicate that work will be performed in a satisfactory manner. Staff is working with the Los Angeles County Flood Control District to obtain an encroachment permit and approvals for a ramp undercrossing at Valencia Boulevard. Pending final permitting approval, construction is tentatively expected to begin this September, An environmental assessment was prepared and made available for public review pursuant to the California Environmental Quality Act, Based on the analysis, staff has determined that no adverse impacts resulting from construction work in the river corridor are anticipated due to the standard mitigation measures incorporated into the project. A draft Negative Declaration was prepared subsequent to the analysis. The contractor will be required to comply with the standard mitigative measures of all responsible agencies having regulatory authority over the South Fork River Channel, 1 68 OCKOM ILI I OluO.Werel 1. The City Council adopt the plans and specifications for Project No. 99-044, South Fork Trail Phase IV; 2. Award contract to R. C. Becker and Son, Inc., the lowest responsible bidder, in the amount of $447,468.70 plus 10 percent contingency for potential change orders. Authorize the City Manager or his designee to approve all documents relating to this contract; 3. Appropriate an additional $50,000.00 of developer fees into account no. 14-99044-227 and increase estimated revenues account 14-3610 by $50,000.00; 4. Approve the draft Negative Declaration for this project and authorize staff to file a Notice of Determination with the Los Angeles County Clerk. ATTACHMEN South Fork Trail Phase IV Project Map REP:DDP.dis s:lpr�councffisN--awd. ddp SOUTH FORK TRAIL � PHASE IV Project Map z P.O. Q? CO C3 County z Boundary T AD Boun ry 0 PROJECT smirr STA Lte LOCATION SOUTH FORK TRAIL � PHASE IV Project Map N 0. Z P.0, CR Ate Coun 'y z dary Boun T Boun 0 A PROJECT UUWF 57A Mit 11 LOCATION M