HomeMy WebLinkAbout1995-05-23 - AGENDA REPORTS - CA COMMERCIAL POOL EARTHQUAKE (2)AGENDA REPORT / CityIg proval / Item to be presented by: John Danielson CONSENT CALENDAR DATE: May 23, 1995 SUBJECT: Increase Contract with California Commercial Pools, Inc. for Earthquake Repairs - Project No. PR 95-039 DEPARTMENT: Parks, Recreation, and Community Services California Commercial Pools, Inc. was recently awarded a contract to repair earthquake damage at Newhall and Santa Clarita Park pools in the amount of $157,140 (Purchase Order No. 11339). Included in the contract was additional testing to determine if any other damage which was not visible during inspections existed. A specialized procedure called a leak test was performed, and major new breaks were found at both pools.. The engineering fug of Jones & Madhavan has reviewed the additional damage and recommended replacing the gutter system and main drain at Newhall Park pool, and repairing the gutter system plumbing and main drain at Santa Clarita Park pool. The cost for additional repairs includes increases to the original contract of $152,557 for Newhall Park pool, $75,686 for Santa Clarita Park pool, and $8,000 of Departmental savings. The original contract for $157,140 would be increased by $236,243, for a total of $393,383. Staff is currently seeking FEMA reimbursement for all eligible repairs. The following is a cost breakdown for repairs: Contractual Total Test Previously Increases & Repair Location Approved Requested Costs Newhall Park Pool $ 121,500 $ 152,557 (FEMA) $ 274,057 Santa Clarita Park Pool 35,640 75,686 (FEMA) 111,326 Santa Clarita Park Pool 8,000 (Dept. savings) 8,000 ------------- ------------- ------------- Total: $ 157,140 $ 236,243 $ 393,383 APPROWED AgedaItem: 4 Increase Contract with California Commercial Pools, Inc. for Earthquake Repairs - Project No. PR -95-039 May 23, 1995 Page 2 1. The City Council authorize additional appropriations in the amount of $152,557 in account no. 90-79978-227, $75,686 in account no. 90-79977-227, and transfer $8,000 from Departmental fund savings to account no. 01-79977-227. Increase estimated revenue, account no. 90-3597, by $228,243; 2. Authorize contract amendments for total repair costs at Newhall Park pool of $274,057 and Santa Clarita Park pool of $119,326; and 3. Authorize staff to pursue Proposition A funds for the $8,000 improvement of Santa Clarita Park pool, if an eligible expense. California Commercial Pools, Inc. quotes for additional repairs to Newhall and Santa Clarita Park pools RLM.dis i unit\agfem pi.rim CAWFUNA Pontis & SPAS May 3, 1995 City of Santa Clarita 23920 Valencia Blvd., Suite 120 Santa Clarita, CA 91355-2196 Attn: Mr. Ray Miramontez California CommercialPools, Inc. 623 W. Footbill Boulevard Glendora, Cal9brnia 91741-2475 (818) 335.9551, 335-2561 fax Re: Pricing as requested for additional piping and gutter construction at Newhall Pool per Jones and Madhavan letter dated May 1, 1998. Dear Mr. Miramontez, The following is the pricing requested for the additional work at the Newhall pool. The scope of work quoted is as requested by Jones & Madhavan. I. Remove and Replace Main Drain Piping a. Remove and replace main drain in pool floor and under deck per original alternate quote. b. Core out existing pipes and sea] with new link seals 1. 2 - 12" cores @ 5135 each 2. 2 - link seals @ $83.00 each 3. Labor to install - 4 hours @ $42.00/hr C. Remove and reinstall existing main drain grates 4 hours @ $42.001hr d. Remove and reinstall existing 8" PVC butterfly valve with gear operator - 4 hours @ $42.001hr Sub Total 20% Supervision, Mark Up and Overhead 2% Additional Bond TOTAL With local offices serving California, Arizona and Nevada $12,150.00 270.00 166.00 168.00 168.00 $13,090.00 2,618.00 262.00 $15,970.00 ' 2. Option A -Repair Broken Gutter Drain and Return Lines C a. Remove and replace pool deck as necessary to give access. 1. Perimeter saw cut - 390' @ $2.50/ft. 2. Deck Removal 2,230' @ $3.501ft. (Remove by hand to protect existing deck) b. Replace concrete decking. 1. Drill and dowel for decking @ 18" o.e. 260 dowels @ $12.00 each 2. 2,230 sq. ft. of deck with #3 @ 18" o.c. 2,230 sq. ft. @ $3.50/sq. ft. 3. 330 perimeter feet of mastic joint @ $4.00/ft. C. Excavation. 1. Excavate 330' pool periemter to inspect and access all gutter and return piping, 32 hrs backhoe @ $75.00 2. Labor to tend backhoe and protect existing piping. 64 hours @ $38.00/hr 3. Dumpster for piping and debris - lump sum 4. Excavate for return piping from pool edge to equipment room - 8 hours @ S75.00/hr 5. Excavate for gutter lines from pool edge to surge chamber. 8 hours @ $75.00/hr d. Identify all broken pipes, repair, and pressure test. Material estimate Labor estimate 2 men 8 days @ 42.00/hr e. Backfill and compact for return system and gutter system. 1. 65 tons of sand @ 10.00 2. 4 days backhoe @ 75.00 3. 4 days - 2 laborers @ 38.00 4. Compactor rental - 4 days @ 150.00 f. Miscellaneous repairs and replacements. I. - 17 depth markers @ $85.00 2. 3 - No Diving signs (English & Spanish) @ $400.00 3, Replace ladder anchors for 6 ladders 12 anchors @ $65.00 4. Replace one lifeguard anchor @ $300.00 $975.00 7,805.00 3,120.00 7,805.00 1,320.00 2,400.00 2,432.00 250.00 .tJ t:11 4,000.00 5,376.00 650.00 2,400.00 2,432.00 600.00 1,445.00 I,200.00 780.00 300.00 5. Labor to remove and reinstall ladders and guard chairs - 8 hours @ $38.00 304.00 6. Budget for repair of existing pool light conduits which may be damaged during excavation 2.000.00 Sub Total $48,794.00 20% Supervision, Mark Up, and Overhead 9,758.00 2% Additional Bond 976.00 TOTAL - OPTION A $59,528.00 2. Option B - Remove & Replace All Return and Gutter Piping. Replace existing gutter with a rimflow gutter system per provided details. til_s, . J J cas } 04 a. Remove and replace deck as necessary to gain access. 1. Perimeter saw cut - 390' @ $2.501ft 5975.00 2. Deck removal - 2,230 sq. ft. @ $3.50 7,805.00 3. Core out existing returns - 24 @ $50.00 1,200.00 b. Replace concrete decking. 2 - 8" caps @ S27.00 1. Drill and dowel for decking @ 18" o.a 166.00 2 - 8" pit valves with gear operators and extension 260 dowels @ $12.00 each 3,120.00 2. 2,230 sq. ft. of deck with #3 @ 18" o.c. 2,230 sq. ft. @ $3.50 7,808.00 3. 330 perimeter feet of mastic joint @ $4.00 1,320.00 C. Excavation. 1. Excavate 330' pool perimeter to access all gutter and return piping, 32 hours backhoe @ $75.00 2,400.00 2. Labor to tend backhoe and remove existing piping 64 hours @ $38.00 2,432.00 3. Dumpster for piping and debris - lump sum 250.00 4. Excavate for return piping from pool edge to equipment room - 8 hours backhoe @ $75.00 600.00 5. Excavate for gutter lines from pool edge to surge chamber - 8 hours @ S75.00 600.00 d. Plumbing (Materials). 1. 2 - 8" gutter lines 390' , 8" pipe @ $5.33 2,078.00 2 cleanouts @ S79.00 158.00 2 wyes for clean outs @ $114.00 22900 12 - 8" 90 ells @ S81.00 972.00 2 - 8" caps @ S27.00 54.00 2 - 8" link seals @ $83.00 166.00 2 - 8" pit valves with gear operators and extension handles @ $1,300.00 each 2,600.00 Miscellaneous glue, guages, adapters, etc. 400.00 2. 2 - 6" return system trunk lines 390' - 6" pipe @ $4.10 1,899.00 24 - 6" tees @ $45.18 1,084.00 24 - 6" x 2" bushings @ $17.84 428.00 2 - 6" caps @ $5.83 11.00 20 - 6" 90 ells @ $26.86 537.00 140' - 2" pipe @ $.78 110.00 24 wall return fittings @ $12.00 288.00 24 - 2" 90 ells @ $5S6 133.00 Miscellaneous glue, guages, etc, 400.00 3. Plumbing labor. Gutter - 2 men - 4 days, 64 hours @ $42.00 2,688.00 Return system 2 men - 6 days, 96 hours @ $42.00 4,032.00 Set pit valves and link seals - 2 men - 1 day, 16 hours @ $42.00 672.00 Grout in new return fittings - 2 men - 1 day, 16 hours @ $42.00 672.00 e. Backfill and compact for return and gutter piping. 1. 65 tons of sand @ $10.00 650.00 2. 4 days backhoe @ S75.00 2,400.00 3. 4 days - 2 laborers @ $38.00 2,432.00 4. Compactor rental - 4 days @ $150.00 600.00 L Miscellaneous repairs and replacements 1. 17 depth markers @ $85.00 2. 3 - No Diving signs (English & Spanish) @ $400.00 3. Replace ladder anchors for 6 ladders 12 anchors @ $65.00 4. Replace lifeguard anchors @ $300.00 5. Labor to remove and reinstall - 8 hours @ $38.00 6. Budget for repair of existing pool light conduits and overhead light conduits which may bo damaged during excavation g. Replacement of existing gutter system with a rimflow gutter system per details provided by Jones & Madhavan 1. Remove coping and existing tile - 32 hours @ $38.00 2. Drill and dowell reinforcement into existing gutter 700 locations @ $1200 each 3. Tie gutter detail reinforcement, 330' @ $20.00/ft 1,445.00 1,200.00 1,216.00 4. Set perimeter form for backside of gutter. Remove after concrete placement - 330' @ $8.00 5. Placement of 60 yards of shotcrete @ $1601yd 6. Rebound clean up (lump sum) 7. Thoroseal new gutter - 330' @ S8.00/ft 8. Fabricate and install stainless steel gutter channel frame - 330' @ $35.00 9. Furnish and install fiberglass grating including clips, stainless hardware and labor 330' @ $24.001ft 10. Increase cost of the over original design Sub Total 20% Supervision, Mark Up, Overhead 2% Additional Bond TOTAL - OPTION B Please call if any furtherclarification is required. Sincerely, E. Lee Jackson President 11,550.00 $111,957.00 22,391.00 2.239.00 $136,587.00 6 j,C3 J � 3-7/ SS -? CAWFORNIA POW & SPAS April 25, 1995 Jones & Madhavan Consulting Engineers 461 West Sixth Street, Suite 301 San Pedro, CA 90731 Attn: Mr. Nachi Madhavan Re: Santa Clarita Pool Dear Mr. Madhavan, California Commercial Pools, Inc. 623 W. Foothill Boulevard Glendora, California 91 741-24 75 (818) 335-9551, 335-2561 fax The following is our price quote for additional work at the Santa Clarita Pool per your request dated April 21, 1995. 1) Concrete Demolition a. Remove 6' band of deck concrete around pool perimeter and 20' wide strip for main drain excavation. Perimeter saw cut - 300' @ $2.50 $750.00 Deck removal 2060' @ $35-0 7,210.00 b. Remove a 35' long by 4' section of pool floor Sawcut 74' @ $2.50 18750 Floor removal - 140' @ $5.00 700,00 C. Demo and tunnel as required to pass under vertical pool wall - lump sum 500.00 d. Cut and thread existing brass gutter pipe - 2" 23 locations @ $75.00 1,725.00 C. Core 3 new holes (10") in surge chamber wall for new pipe penetrations - 3 @ $120.00 360.00 f. Remove and reinstall existing main drain grates 200.00 With Ivc.d offices ming California, Ariwna and Nevada Lirrn•c k IS; 10_'.#i4107 6, 762'IS,#1')277 2) Excavation a. Excavate 250' pool perimeter for gutter system (backhoe) 24 hours @ $75.00 1,800.00 b. Laborer to tend backhoe and remove existing piping and debris - 24 hours @ $38.00 912.00 C. Dumpster for piping debris - lump sum 250.00 d. Deep excavation for main drain line under pool deck 16 hrs backhoe @ $75.00 1,200.00 C. Speed shoring for deep excavation Rental - 16 units @ $35.00 560.00 Placement - 16 hours @ $38.00 608.00 Deliver and pick up for shoring - 2 x $50.00 100.00 L Hand excavate for main drains in pool floor 16 hours @ $38.00 608.00 3. Back fill and compact a. Backfill and compact 250' pool perimeter trenching 50 tons sand @ $10.00 per ton 500.00 3 days backhoe @ $75.00/hr 1,800.00 3 days - 2 laborers - 48 hrs @ $38.00 1,824.00 Compactor rental - 3 days @ $120.00 360.00 b. Backfill and compact 28' of deep main drain trench Backhoe to place dirt - 1 day @ 75/hr 600.00 Backhoe to compact - 1 day @ 90//hr 720.00 C. Backfill and compact main drain trench in pool 1 day - 2 laborers - 16 hrs @ 38/hr 608.00 Wacker rental 90.00 4. Replace concrete decking a. Drill and dowel for decking @ 18" o.c. (drill, dowel, epoxy) 210 dowels @ $12.00 each 2,520.00 b. Drill and dowel for main drain trench in pool @ 12" O.C. - 66 dowels @ $12.00 each 792.00 C. 2060 sq. ft. of 4" decking with #3 @ 18" O.C. 2060 sq. ft. @ $3.50 7210.00 d. Replace pool floor concrete - 6" thick w/ #4 @ 12" o.c. 140 sq. ft. @ $4.75 665.00 e. 250 perimeter feet of mastic joint against pool coping 250' @ $4.00 1,000.00 f. Repair 5 tile lines at main drain trench 5 locations @ $50.00 each 250.00 g. Plaster patch - 140 sq. ft. @ $4.00 560.00 5. Plumbing a. Materials 1. Main Drain 80' - 6" pipe @ 4.10 328.00 4 - 6" couplings @ 22.36 89.00 2 - 6" 90s @ 26.86 53.00 4 - 6" 45s @ 32.28 129.00 3 - 6" caps @ 5.83 87.00 1 - 6" link seal @ 55.00 55.00 1 - 6" pit valve w/ gear operators, extension handle, 110.00 stainless hardware 1,200.00 Misc. glue, guages, etc. 100.00 2. Gutter System 300' - 6" pipe @ 4.10 1,230.00 23 - 6" tees @ 45.18 1,039.00 2 - cleanouts @ 79.00 158.00 23 - 6 x 2 bushings @ 17.84 410.00 16 - 6" 90s @ 26.86 429.00 2 - 6" caps @ 5.83 11.00 2 - 6" link seals @ 55.00 110.00 2 - 6" pit valves w/ gear operators, extension handle stainless hardware @ 1200 2,400.00 120' - 2" pipe @ .78 94.00 23 - 2" 45s @ 5.56 127.00 23 - 2" adapters @ 8.50 195.00 Misc. glue, guages, etc. 100.00 b. Labor 1. Main drain - 2 men, 3 days - 48 hrs @ $42.00 2,016.00 2. Gutter system - 2 men, 6 days - 96 hrs @ $42.00 4,032.00 3. Set pit valves and link seals 2 men, 1 day - 16 hrs @ $42.00 672.00 6. Misc. repairs & replacements `` a. 23 depth markers @ $85.00 1,955.00 b. 4 "No Diving" signs @ $225.00 c. Furnish and replace grab rail anchors - 20 anchors @ $65.00 d. Furnish and replace 2 lifeguard anchors - 2 @ $300.00 e. Labor to remove and reinstall guard chairs & grab rails 16 hours @ $38.00 L Budget for repair of damaged electrical conduits during trenching Sub Total General Contingency 10% Overhead & Markup 15% Cost of Additional Bond 2% •1: 11 $59,596.00 5,959.00 8,939.00 $1,192.00 CONSTRUCTION ESTIMATE $75,686.00 It should be noted that no monies are included for engineering, design, and agency fees. _MAY-03-95WED 08:12AM CALIF. COMMERCIAL. POOLS 818 335 2561 P.06 • aS+62�95 99193 M 310 711 8012 JONES t MADHAVRN �,a2 n � � (rr,Vl ,Jones Madhavan AM wt., S<a6 s' w s,.;.. W r 1.. P.d..,. Cwtita IA 9n73 I tzln)+37-00>n 7 N t (!IV) 737.0037 Prt May 1, 1995 Mr. Itc )ackson California Commercial Pools 623 West Poothill Boulevard Glendora, CA 91741 Subject: Newhall Park Pool Dear Lee: Please provide a price quote for the following additional work associated with Newhall Park 1'001: 1. Remove and replace main drain line complete. a. Main drain line shall be 8" Schedule 80 PVC and enter surge chamber at acme location as existing. Core out existing pipe and scat new pipe with rubber belt warerstop with stainless steel fasteners. b. Reuse 8" PVC butterfly valve with gear operator and stem extension in surge chamber. C. Remove and replacc pool floor and pool deck as necessary to gain access les piping. Refer to Detail 3, Sheet SPI and Derail 3, Sheer SP2. d. Pressure test new piping at 80 Psi prior to backfilling. e. Excavate, backfill and compact soil as necessary. Backfill $hall be compacted to minimum 9o%. f. Remove and reinstall existing main drain grates. 2. 01tTIQN -A: Repair broken gutter drain and return lines. a. Remove and replace pool deck as necessary to inspect and gain access to piping. Refer to Detail 2, Shen SP2, b. Identify till broken pipes and replace to match existing. r ss"2"s lflas 2 310 732 0032 JONES t "RDHAVaN Mr. Lce Jackson May 1, 1995 Page 2 C. Pressure test new piping at 30 psi prior to backfilling. 4 d. L'xeavate, backfill and compact soil as necessary. Backfill shall be compacted to minimum 90%. e. Replace the deck depth markers to match existing. 'typical 17 places. F. Replace tilt no diving signs to match existing. Typical 3 places. g• Replace expansion joint around perimeter of pool at coping tile. hu Replace Ladder anchors to match existing. Typical G places. i. Replace lifeguard ehair anchors to match existing. OPTION - B: Replace: existing return lines and gutter. a. Remove and replace pool deck as necessary to replace rcrurn piping and accommodate new gutter. Refer to Detail 1, Sketch 2. b. Replace return lines to match existing. Core walls and replace inlets. c. Replace existing tilt gutter with "Rim Flow Ouster" as indicated in enclosed Sketches 1 and 2. d. Pressure rest new piping at 80 psi prior to backAlling. e. Excavate, backfill and compact soil as necessary.. Haclef l shall be compacted to minimum 90%. f. Replace tile duck depth markers to match existing. Typical 15 places. g. Replace tile no diving signs to match existing. Typical 3 places. h. Replace ladder anchors to ntatclt existing. Typicsl G places. i. Replace stanchion sockets to match existing. Typical 4 places. j. Replace handicap lifr socket to mucic existing. k. Replace lireguUd chair Anchors to match existing. L Gutter the shall be 2" x 2" dark blue ceramic mosaic tile. in. Gutter grating shall be white fiberglass grating, model Uuragrid T-1800 manufactured by APC. -93 WED 06:13 AM CALIF. COMMERCIAL POOLS B18 333 2361 P.06 83092i9s 89966 3 319 732 9832 JONES a 6AONRUAN P.9/ Mr. Ix9 Jackson May 1, 1995 Page 3 If you have any questions, plcue call. Sincerely, )ONES 8c MAUHAVAN Nachi Madhavan Principal Enclosures cc Brian Tcn and Eve Reynolds, Gardc-Ten Architects