Loading...
HomeMy WebLinkAbout1995-03-28 - AGENDA REPORTS - EARTHQUAKE REPAIRS CITY POOLS (2)City Manager Item to be presented by , Rick Putnam 3 27. 7-1 CONSENT CALENDAR DATE: March 28, 1995 SUBJECT: Award Contract for Earthquake Repairs of Two City Pools - Project No, PR 95-039 DEPARTMENT: Parks, Recreation, and Community Services The Parks, Recreation, and Community Services Department recently accepted bids for the earthquake repairs of three City pools, project no. PR 95-039. The project consists of plumbing, tile, coping, concrete, pool shell, and cosmetic repairs of Newhall, Santa Clarita, and North Oaks Park pools. The bids were opened on Tuesday, February 28, 1995, Currently, Newhall Park pool is completely out of service and Santa Clarita Park pool is operational but has a major water leak. North Oaks Park pool is fully operational with the exception of needed cosmetic work of the deck and shell. All three pools were bid on; however, staff is recommending to award bid on only Santa Clarita Park and Newhall Park pools at this time. Should any delays in construction occur while all three pools were being worked on, it would have a serious impact on our aquatics programs. North Oaks Park pool would remain operational during the repair period of Santa Clarita and Newhall Park pools, giving residents access to a City pool during the upcoming busy aquatics season. Base bids for both Newhall and Santa Clarita Park pools were bid on obvious visual damage, such as concrete deck repairs, cracks in pool shell, etc. Unknown repairs, such as water leaks on both pools, will be dealt with on a test and repair basis. Therefore, bids were submitted in two parts: (1) base bid for known repairs, and (2) unit cost for the repair of unknown items. Project no. PR 95-039 was advertised for public bids. Thirteen bid packages were distributed and included two local contractors. Five bid proposals were submitted for the project. The bid results are as follows: Location California Commercial Pools Glendora McAlpine & Salyer Paramount Intertex of California Santa Clarita, Mission Pools Escondido JM Industries Westlake Village (disqualified, no bon MR D Base Bid - Newhall & S.C. Pools Only $ 99,600.00 $ 99,724.00 $ 137,290,00 $ 201,382.00 $ 221,094.00 Agenda Item: /® Award Contract for Earthquake Repairs of Two City Pools March 28, 1995 Page 2 After completing review of all bids, background references, and bonding companies, staff has determined California Commercial Pools to be the lowest responsible bidder for the earthquake repairs of Santa Clarita and Newhall Park pools. Funding in the amount of $157,140.00 for Santa Clarita and Newhall park pool projects will be allocated from several accounts per the below listed recommendations. RECOMMENDATION 1. The City Council approve total estimated FEMA revenues of $157,140.00 to be reflected in account no. 90-3596. 2. The City Council appropriate a total of $157,140.00 for earthquake -related expenditures for Newhall Park 'pool and Santa Clarita Park pool, to be reflected in account nos. 90-79977-227 ($121,500.00) and 90-79978-227 ($35,640.00).. The City Council award the California Commercial Pools contract for earthquake repairs for Santa Clarita and Newhall Park pools in the total amount of $157,140.00, comprised of; (a) base bid amount of $99,600.00, plus (b) $31,350.00 for unit price cost of unspecified repairs such as pool leak test and repairs at both parks, and (c) $26,190.00 to be reserved for change orders. Authorize the City Manager or his designate to approve change orders. 1. Record of Bid Opening 2. California Commercial Pools Unit Cost Sheet for Unspecified Repairs. RLM.dis council\agepool.rlm CITY OF SANTA CLARITA RECORD OF BID OPENING BID FOR: PR 95-039 - Renovation of three Park Pools DATE: February 28, 1995 TIME OF BID OPENING: 11 a.m. PERSONS PRESENT: Donna M. Grindey, City Clerk; Geri Miller -Davis, Deputy City Clerk Company Amount Mission Pools $218,252.00 Calif. Commercial Pools $169,300.00 J M Industries ($332,723.00) Disqualified (No Bond) McAlpine and Salyer $168,420.00 Intertex $224,029.00 i Apparent low bidder. McAlpine & Salyer $168,420.00 ATTEST: - n D � � Oar, 1JcLt�-vO Donna M. Grindey, CMC City Clerk Renovation of 3 City Pools (Newhall, North Oaks, & Santa Clanta Park Pools) Bid Form When unit prices are indicated, bids shall be provide for the base bid and all unit prices listed. Failure to provide a bid for any unit price requested will result in a non-responsive bid. The bid for gU work required by the Contract Documents For the amount of $169,300.00 Provide the following base bids based upon the work in plans and specifications for each project site: 1. Newhall Park Pool (Memorial Pool) 2. Santa Clarita Park Pool 3. North Oaks Park Pool S 14.600.00 $ 69,700.00 The City reservestheright to award none, any one or any combination of the bid items. C -2a Bid Form (revised 2-21-95) Unit prices shall include all labor & materials to repair: the below specified items and shall also include the costs for replacing those sections of pool deck/floor necessary to complete those repairs. Failure to provide a bid for any unit price requested will result in a non-responsive bid. 1. Newhall Park Pool (Memorial Pool) Provide unit costs for the following: a. Repair of Main Drain under pool floor $7,900.00 (cost to replace entire main drain line) b. Repair of Main Drain under pool deck $ 4.250.00 (cost to replace entire main drain line) Repair of Gutter Drain under pool deck $1.500.00 per location of leak d. Repair of Supply line under pool deck $ 1.500.00 per location of leak e. Repair of Pool light conduit under pool deck $ 600.00 per location of leak Repair of above ground circulation piping $__20 0 - 0 _0 per location of leak 2. Santa Clarity Park Pool Provide unit costs for the following. a. Repair of Main Drain under pool floor $ 7 , Mn _ nn per location of leak b. Repair of Main Drain under pool deck $ 4,000.00 per location of leak c . Repair of Gutter Drain under pool deck $ 1,500.00 per location of leak d. Repair of Supply line under pool deck $ 1,500.00 per location of leak e. Repair of Pool light conduit under pool deck $ 600.00 per location of leak f. Repair of above ground circulation piping $ 500.00 per location of leak Sheet 3 of 10