HomeMy WebLinkAbout1995-04-04 - AGENDA REPORTS - NEW ROAD (2)CITY OF SANTA CLARITA INTEROFFICE MEMORANDUM TO: Mayor Jo Anne Darcy and City Councilmembers/ , FROM: Lynn M. Harris, Deputy City Manager, Commumty evelopment DATE: April 4, 1995 SUBJECT: COMMUNITY STRATEGIC PLAN - ACTION ITEM #1 - NEW ROAD INTRODUCTION The City is currently reviewing four major topics related to the traffic and circulation improvements within the City. These topics include: 1. Follow-up to the Community Strategic Plan Action Item #1 regarding the development of a new roadway segment over the next three years. 2. Access and internal roadways proposed for the development of the Porta Bella project. 3. The designation of an east/west corridor throughout the Valley to address the long-range circulation needs of the City. 4. The process of Amendments to the Circulation Element of the General Plan. While all the above topics are interrelated in terms of providing a circulation network which would best address the Center City Circulation, each issue needs to be dealt with independently in an effort to make progress toward completion of each task, considering the time frame tothe mposed on each issue. The topic to be discussed at this Study Session is specifically focused n the first issue outlined above. The east/west corridor issue and the proposed Amendments Circulation Element of the General Plan will be brought to the Council in the near future. The following is more detailed information about the new road issue as outlined in Item #1 above. BACKGROUND As part of the October 8, 1994 Community Strategic Plan, the participants identified the "lack of adequate" roadways throughout the Valley as a major concern. The focus was centered on east/west circulation, but there was an overall desire to construct new roadway links. In order to meet the goals outlined in the plan regarding new roadways, staff used public input to develop a list of roadway links and evaluation criteria to identify the first new roadway segment the City should consider since incorporation. This identification of the roadway segment is the first step towards constructing a roadway which will serve the community and improve circulation Valleywide. Agenda Item: 3. COMMUNITY STRATEGIC PLAN ACTION ITEM #1- NEW ROAD April 4, 1995 - Page 2 The City Council was presented a preliminary list of roadway links and evaluation criteria at the meeting of February 14, 1994, at which time additional roadways where added to the list. In addition, several of the evaluation criteria were discussed. Following the Council meeting, the Citizens Transportation Advisory Committee (CTAC) reviewed and provided input on the roadway links and evaluation criteria. The attached matrix entitled "Roadway Comparative Analysis" and "Rating Criteria and Benefits" sheet are a result of the input from the various meetings in which circulation was discussed. From this input, staff evaluated nine roadway segments identified by the Council, public and CTAC. As part of the process to generate public support of the roadway link, staff presented the above information to the Chamber Transportation Committee, CTAC, and the Valencia Industrial Association (VIA). The Chamber Transportation Committee supported the findings of the matrix 11 in favor and 1 against. CTAC supported the findings of the evaluation 4 in favor and 1 against. The one vote at CTAC was for the Magic/Princessa connection. VIA did not take a vote for a particular roadway but showed support for the process. FINANCIAL ANALYSIS Once the roadway segment is identified, staff will evaluate, review and identify possible funding sources/mechanism for construction of the new roadway(s). RECOMMENDATION Refer to April 25th City Council meeting. ATTACHMENTS Exhibit A Exhibit B RGN:hds:lkl wumd\aud,...,g CITY OF SANTA CLARITA COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY STRATEGIC PLAN ACTION ITEM #1 NEW ROAD RATING CRITERIA AND BENEFITS • Benefit to existing roadway segments (traffic modeling) • Benefit to existing intersections (traffic modeling) • Anticipated usage at time of opening DING/FINANCE • Bridge and major thoroughfare route • Developer funding • Potential for grant funding • Ability for reimbursement • Total project cost ""0 • EIR vs Mitigated Negative Declaration • Permitting • Right-of-way • Construction ENVIRONMENTAL • CEQA • Residential impacts • Business impacts • Impacts for river/oaks/hillside TRANSIT/EMERGENCY • Connectivity to major transit routes • Alternative emergency routes • Connections between activity centers • Additional transit access • Proximity to multi -family senior apartment housing CITYWIDE • Connectivity to congestion management program routes • Access for Santa Clarita Valley residents to major routes and major destinations • Complements the existing and planned roadway network. RGN:1ld eVivi\roadsummn City of Santa Clarita Community Development Department Community Strategic Plan - Action Item # 1 - New Road Roadway Comparative Analysis 1., Golden Valley Road Plum Canyon / SR -14 2. Lyons Avenue Extension San Femando Road/ Dcc oveiler 3. Newhall Ranch/Santa Clarita Pkwy Bouquet Canyon / Soledad Canyon 4. Santa Clarita Parkway Bouquet Canyon / Soledad Canyon 5.. Santa Clarita Parkway Soledad Canyon / SR -14 6.. Via Princessa Rainbow Glen / Wiley Canyon (including bridge) 7. Via Princessa/Magic Mountain Rainbow Glen / San Femando 8. Golden Valley Road Siena Highway / SR -14. 9. Wiley Canyon Road Calgrove Blvd. / Lyons Avenue LEGEND x = RATING (1 MINIMUM - 5 MAXIMUM) (x) = WEIGHTING (1-3) SAMPLE: Traffic Rating 3 Weight 3 Criteria Score = 9 eng-civ1newroad.xls RGN:3/14/95 3 (3) 2 (2) 2 (2) 2 (1) 1 (1) 2(l) 2 (3) 2 (2) 4 (2) 3(l) 1 (Q 1 (1) 2 (3) 3 (2) 4 (2) 3 (1) 2 (1) 2 (1) VCn 3 (2) 2 (2) 2 (1) 3 (1) 3 (1) 3 (3) 4 (2) 2 (2) 3 (1) 2 (A 2 (1) w 4 (2) ~ 4 (1) 4 (1) 4 (1) 5 (3) 4 (2) 3 (2) 4 (1) F 4 (1) 1 (3) 1 (2) W 3 (1) E 1 (1) O W E m E LL1L E (' Z " °�' W 4 �' U) V E 3. m cc n° $' Z} r LL Q" p y Z S n€ 'gy pp .4) E oo. ROADWAY LINK LL o H Z Lu CL F h U i 3 Q. 0 1., Golden Valley Road Plum Canyon / SR -14 2. Lyons Avenue Extension San Femando Road/ Dcc oveiler 3. Newhall Ranch/Santa Clarita Pkwy Bouquet Canyon / Soledad Canyon 4. Santa Clarita Parkway Bouquet Canyon / Soledad Canyon 5.. Santa Clarita Parkway Soledad Canyon / SR -14 6.. Via Princessa Rainbow Glen / Wiley Canyon (including bridge) 7. Via Princessa/Magic Mountain Rainbow Glen / San Femando 8. Golden Valley Road Siena Highway / SR -14. 9. Wiley Canyon Road Calgrove Blvd. / Lyons Avenue LEGEND x = RATING (1 MINIMUM - 5 MAXIMUM) (x) = WEIGHTING (1-3) SAMPLE: Traffic Rating 3 Weight 3 Criteria Score = 9 eng-civ1newroad.xls RGN:3/14/95 3 (3) 2 (2) 2 (2) 2 (1) 1 (1) 2(l) 2 (3) 2 (2) 4 (2) 3(l) 1 (Q 1 (1) 2 (3) 3 (2) 4 (2) 3 (1) 2 (1) 2 (1) 3 (3) 3 (2) 2 (2) 2 (1) 3 (1) 3 (1) 3 (3) 4 (2) 2 (2) 3 (1) 2 (A 2 (1) 5 (3) 4 (2) 5 (2) 4 (1) 4 (1) 4 (1) 5 (3) 4 (2) 3 (2) 4 (1) 3 (1) 4 (1) 1 (3) 1 (2) 3 (2) 3 (1) 2 (1) 1 (1) 1 (3) 2 (2) 2 (2) 3 (1) 1 (1) 1 (1) 22 23 27 27 28 45 40 17 16