Loading...
HomeMy WebLinkAbout1995-05-23 - AGENDA REPORTS - PONTIUS COMMUTER RAIL TRAIL (2)AGENDARE� � 1 POT er o`' Item to be presented by Rick Putnam 75 'Id CONSENT CALENDAR DATE: May 23, 1995 SUBJECT: Bid Award for Chuck Pontius Commuter Rail Trail Project No. 99-029-02 DEPARTMENT: Parks, Recreation, and Community Services At the regularly scheduled City Council meeting of May 24, 1994, the City Council approved an alignment and trail features for the Chuck Pontius Commuter Rail Trail. This trail will ran between the Santa Clarita Metrolink Station and Phase I of the Santa Clara River Trail. Desired trail features included: • a concrete pedestrian sidewalk; • a decomposed granite jogging path; • an asphalt bike trail; • a landscaped "corridor"; and • a white woodcrete post -and -rail fence. At the time of alignment approval, staff advised Council that it was likely there would not be sufficient budget to incorporate all desired trail features. A decision was made to incorporate all of the desired features in the construction package and to make a final decision once bids were received. On December 13, 1994, staff also received authorization to consolidate portions of the following three projects and proceed with advertising for bids as one consolidated project: Chuck Pontius Commuter Rail Trail, the Soledad Bridge Bikeway project, and a portion of the Soledad Bridge Widening project. Twenty-three bid packages were purchased during the bid period, and five bids were subsequently received by the City Clerk, The Engineer's Estimate for the consolidated project, with all desired features, is $1,580,000. The following bids were received: Pima Corporation C. A. Rasmussen, Inc. Granite Construction Union Engineering Excel Paving Santa Monica, CA Simi Valley, CA Watsonville, CA Ventura, CA Long Beach, CA $1,387,508.50 $1,670,124.73 $1,678,380.55 $2,029,384.40 $2,078,378.74 Agena item:� Bid Award for Chuck Pontius Commuter Rail Trail - Project No. 99-029-02 Page 2 The apparent low bidder, Pima Corporation, did not comply with Disadvantaged Business Enterprise (DBE) requirements, did not provide a list of subcontractors as required by State law, did not indicate in its bid (by way of references) an ability to perform the required work in the river, and contained at least one mathematical error in the bid. Pima Corporation has also formally requested to be relieved of their bid due to a mistake made on one of the bid items. Staff recommends that the Pima Corporation bid be disqualified due to these irregularities, and that C.A. Rasmussen, Inc, be considered the lowest responsible bidder. The construction budget (project budget minus right-of-way, construction administration, survey, testing, inspection, and contingency costs) for the consolidated project is $1,113,729. The "shortfall" for the project is therefore $556,395. Staff recommends that $75,000 of this shortfall be made up by changing the white woodcrete post -and -rail fence to a pressure -treated "lodgepole" fence (wood color) similar to that used on the South Fork Trail. Project savings in the amount of $367,000 are also available from the recently completed San Fernando Phase IIUIV and Annual Overlay projects. The final $115,000 of the shortfall could be made up by eliminating that portion of the Soledad Bridge Bikeway interchange ramping which would not affect Commuter Rail Trail usage. Should the City Council approve these recommendations, the project would include all of the originally desired features with the exception of the fence material change. Staff would also like to advise Council that the project would include the relocation and rebuilding of three billboards which were impossible to avoid in their current location. 1. The City Council adopt the plans and specifications for Project No, 99-029-02, Chuck Pontius Commuter Rail Trail; 2. Disqualify the Pima Corporation bid, and award a contract to C.A. Rasmussen, Inc., the lowest responsible bidder, in the amount of $1,670,124.73 plus 11 percent contingency for potential change orders. Authorize the City Manager or his designee to approve all documents relating to this contract.. Authorize the City Manager to enter into the necessary survey, inspection, testing, maintenance guaranty, and other work necessary to support construction of the project; 3. Authorize the change from a woodcrete fence to a lodgepole fence; 4. Authorize a $347,000 budget transfer from account no, 16-96027-227 and a $20,000 budget transfer from account no. 16-9607 227 to new account no. 16-99029-2 7; and a $190,000 budget transfer from account no. 95003-227 to new account no.�99029-227. Also authorize a budget increase of 09,895 to expense account no.`r 17-99029-227 and corresponding revenue account no. 17-3579 to reconcile unbudgeted grant monies previously awarded by the Los Angeles County Metropolitan Transportation Authority for this project; and 5. Authorize expenditures for this project to be from the following account numbers, as applicable: 16-99029-227, 17-99029-227, 28-99029-227, and 17-99040-227. REP:KN.dis councillagcriam.rep