HomeMy WebLinkAbout1995-05-09 - AGENDA REPORTS - PROGRAM SUPPLEMENT SL TPP (2)AGENDA REPORT
City Manager Approval 4!Z
Item to be presented by:
"nthony J. Nisiclf`r�\
V
CONSENT CALENDAR
DATE: May 9, 1995
SUBJECT: PROGRAM SUPPLEMENT AGREEMENT FOR STATE/LOCAL
TRANSPORTATION PARTNERSHIP PROJECTS
DEPARTMENT: Community Development
The State/Local Transportation Partnership Program identifies and participates in funding
locally supported projects, and the following projects have been previously approved by Caltrans
for participation in this program:
Lyons Avenue Golden State Freeway to Valley Street
(Project No. SB94-5450-35) Street Overlay/Reconstruction
Rockwell Canyon Road: McBean Parkway to Valencia Boulevard
(Project No. SB94-5450-36) Street Overlay/Reconstruction
Soledad Canyon Road: 5400' E/O Bouquet Canyon Road to 90' E/O Langside Avenue
(Project No. SB94-5450-37) Street Overlay/Reconstruction
On May 25, 1993, Council awarded the above projects to Boral Resources, Inc. The project was
completed on September 30, 1993 for a total construction cost of $985,200. These projects were
completed on schedule and 5% under budget. On October 26, 1993 Council accepted the work
performed by Boral Resources, Inc. As part of this program, the City has applied for
$220,980.00 in State Partnership grant funds.
Soledad Canyon Road: Sierra Highway to 1000' E/O Sierra Highway
(Project No. SB94-5450-37) Street Overlay/Reconstruction
On October 26, 1993, Council awarded a contract for the above project to Excel Paving
Company. This project was completed on April 13, 1994, for a total construction cost of
$67,918.75. This project was completed three days ahead of schedule and under the approved
budget amount. On May 24, 1994, Council accepted the work performed by Excel Paving
Company. As part of this program, the City has applied for $14,938.00 in State Partnership
grant funds.
APPROW ED Agenda Item:
PROGRAM SUPPLEMENT AGREEMENT
May 9, 1995 - Page 2
San Fernando Road (Route 126) Phase V: Valencia Boulevard to Bouquet Canyon Road
(Project No. SB94.5450-44) Street and Bridge Widening
On April 26, 1994, Council awarded the above project to Reyes, Security, J.V. in the amount of
$4,900,585.48 for the widening of the street and bridge of Phases II and V. Costs for this project
have been tracked in Account No. 30-96036-227. As part of this program, the City has applied
for $933,452.00 in State Partnership grant funds.
Caltrans' procedures for the Partnership Program requires the execution of a Local Agency -
State Master Agreement. In addition, a Program Supplement must be executed for each
approved project.
We anticipate reimbursement from the State during the 1995-1996 fiscal year.
RECOMMENDATION
1. Approve Program Supplement Nos. 016, 017, 018, 019, and 020 to the State/Local Entity
Master Agreement, and direct staff to process these supplements through Caltrans.
ATTACHMENT
Program Supplement Nos. 016, 017; 018, 019, 020 to State/Local Transportation Partnership
Program Agreement No. SLTPP-5450.
MHF:lkl
cwanci/larysn.mh(
STATE. OF CALIFORNIA—BUSINESS AND TRANSPORTATION AGENCY PETE WILSON, Ge...+.w
DEPARTMENT OF TRANSPORTATION
DISTRICT 7, 120 SO.. SPRING ST.
LOS ANGELES, CA 9W12-3606
TELEPHONE (213) 897-3854
TELEFAX (213) 897-1581
March 17, 1995
Mr. Jeff Kolin
Director of Public Works
City of Santa Clarita
23920 Valencia Boulevard, Suite 300
Santa Clarita, California 91355
Attention: Ms. Lynn M. Harris
Dear Mr. Kolin:
RECEIVED
MAR 2 1 1995
COMMUNITY DEVELOPMENT
07-LA-0-SCTA CITY OF SANTA CLARITA
SB94-5450(035)
SB94-5450(036)
SB94-5450 (03 7)
SB94-5450(041)
SB94-5450(044)
Street Widening/Reconstruction
State -Local Transportation
Partnership Program
(SLTPP) Cycle 4
Attached are two (2) original copies of Program Supplement
Nos. 016, 017, 018, 019, and 020 to Local Agency -State Agreement
No. 07-5450. These Supplemental Agreements cover the State -Local
Transportation Partnership Program in the City of Santa Clarita,
California for the above-mentioned project.
Please have these Agreements executed by your Agency,
returning all originals along with a certified copy of the
City Council Resolution or minutes authorizing execution.
Also, please indicate on the Agreement the date of signature.
Upon execution by the State, one (1) Program Supplement with
original signature for each project will be returned to you for
your files.
Any changes to the funding or the Special Covenants of these
Agreements must be approved by this office.
Sincerely,
7� s- ATrs R f
Office of Local Assistance
Attachments
Date: March 2, 1995
PROGRAM SUPPLEMENT NO. 016 Location: 07-LA-0-SCTA
to Project Number: SB94-5450(035)
STATE -LOCAL TRANSPORTATION E.A. Number: 07-927675
PARTNERSHIP PROGRAM AGREEMENT NO. SLTPP-5450
This Program Supplement is hereby incorporated into the State -Local Trans-
portation Partnership Program Agreement for State Share Funds which was
entered into between the Local Entity and the State on 03/09/92 and is
subject to all the terms and conditions thereof. This Program Supplement
is adopted in accordance with Paragraph 3 of Article I of the aforemen-
tioned Master Agreement under authority of Resolution No.
approved by the Local Entity on (See copy attached).
The Local Entity further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with any covenants or
remarks setforth on the following pages..
PROJECT TERMINI:
LYONS AVENUE: GOLDEN STATE FREEWAY TO VALLEY STREET
TYPE OF WORK: STREET OVERLAY/RECONSTRUCTION LENGTH: 1.5 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X] Construction
Estimated Cost State Share Funds I Matching Funds
$ 67426 Local OTHER OTHER
300605IFY94
FY95 $ 0 $ 233179 $ 0 $ 0
FY96 $ 0
City of Santa Clarita STATE OF CALIFORNIA
Department of Transportation
By By
Chief, Local Assistance Branch
District 7
Date Date
Attest
Title
Shereby Certify upon my personal knowledge that bu/deted funds are available for this encumbrance;
Accounting Officer tY5 Date l/S $ 67426.00
i
Chapter Statutes I Item Year I Program BC1 Fund Source I AMOUNT
55 1993 2660-125-042 93-94 20.25,010.10D C 258010 042-T 67426.00
Page 1 of 3
07-LA-0-SCTA DATE: 03/02/95
SB94-5450(035)
SPECIAL COVENANTS OR REMARKS
1. It is mutually understood between the parties that this
contract may have been written before ascertaining the
availability of legislative appropriation of funds, for
the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the
agreement were executed after that determination was
made.
The total amount of State -Local Transportation
Partnership funds payable by the State shall not exceed
$67426 to be encumbered and reimbursed as follows:
FY 93-94 $ 67426
FY 94-95 0
FY 95-96 0
Any increase in State Partnership funds will require a
revised program supplement.
Any decrease in State Partnership funds will require a
revised finance letter.
2. The State Funds Share is calculated based on the lower of the
approved eligible application amount or the eligible award
amount.
3. The Reimbursement Ratio for this Cycle 4 (93/94) Project is
22.43%.
4. SPECIAL COVENANTS FOR SLTPP PROJECTS UNDER EARLY
REIMBURSEMENT PLAN AND UNDER $300,000 STATE SHARE
These Covenants supersede any conflicting provisions of the
Master Agreement:
A. The LOCAL ENTITY agrees that the payment of State Share
Funds will be limited to the lessor of the product of
multiplying the calculated pro rata percentage as determined by
the STATE by either:
(a) The eligible award amount or
(b) The total eligible State/Local Partnership Project cost
in the approved State/Local Partnership Program Application and
accepts any consequent increase in LOCAL ENTITY funding
requirements.
B. The LOCAL ENTITY will invoice the State for the full "State's
Share" after the contract award or upon the State Budget Act
appropriation of funds, whichever occurs later. "State's Share"
Page 2 of 3
0.7-LA-0-SCTA DATE: 03/02/95
SB94-5450(035)
SPECIAL COVENANTS OR REMARKS
is considered a grant and will be reimbursed as a lump sum
payment regardless of final project cost.
C. Prior to reimbursement under this Program Supplement, a
Request For 'Early Reimbursement form, executed by the LOCAL
ENTITY, must be on file with the STATE.
D. The financial audit and Final Project Expenditure Report
provisions of Sections 9 and 10 of ARTICLE I of the Master
Agreement are not applicable to this PROJECT.
5. In accordance with the State and Local Transportation Partnership
Program Guidelines dated April 1993, Section IV, Project
Eligibility, the 10% allowance for construction engineering and
contingencies is not eligible after Cycle 2. Only state/agency
furnished materials can be added to the contract item cost for
State Partnership funds eligibility.
Page 3 of 3
Date: March 2, 1995
PROGRAM SUPPLEMENT NO. 017 Location: 07-LA-0-SCTA
toI Project Number: S994-5450(036)
STATE -LOCAL TRANSPORTATION E.A. Number: 07-927676
PARTNERSHIP PROGRAM AGREEMENT NO. SLTPP-5450
This Program Supplement is hereby incorporated into the State -Local Trans-
portation Partnership Program Agreement for State Share Funds which was
entered into between the Local Entity and the State on 03/09/92 and is
subject to all the terms and conditions thereof„ This Program Supplement
is adopted in accordance with Paragraph 3 of Article I of the aforemen-
tioned Master Agreement under authority of Resolution No.
approved by the Local Entity on (See copy attached).
The Local Entity further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with any covenants or
remarks setforth on the following pages.
PROJECT TERMINI:
ROCKWELL CANYON ROAD: MCBEAN PARKWAY TO VALENCIA BOULEVARD
TYPE OF WORK: STREET OVERLAY/RECONSTRUCTION LENGTH: 1.0 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X) Construction
Estimated Costa State Share Funds Matching Funds
FY94 $ 44199 Local OTHER OTHER
$ 197054 FY95 $ 0 $ 152855 $ 0 $ 0
FY96 $ 0
City of Santa Clarita STATE OF CALIFORNIA
Department of Transportation
By By
Chief, Local Assistance Branch
District 7
Date Date
Attest
Title
I hereby Certify uponmy personal knowledge that bulgeted funds are available for this encumbrance:
Accounting Officer Datev1 S $ 44199.00
Chapter Statutes I Item Year I Program 1BC1 Fund Source I AMOUNT
55 1993 2660-125-042 93-94 20.25.010.100 C. 258010 042-T 44199.00
Page 1 of 3
07-LA-0-SCTA
SB94-5450(036)
SPECIAL COVENANTS OR REMARKS
DATE: 03/02/95
1. It is mutually understood between the parties that this
contract may have been written before ascertaining the
availability of legislative appropriation of funds, for
the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the
agreement were executed after that determination was
made.
The total amount of State -Local Transportation
Partnership funds payable by the State shall not exceed
$44199 to be encumbered and reimbursed as follows:
FY 93-94 $ 44199
FY 94-95 0
FY 95-96 0
Any increase in State Partnership funds will require a
revised program supplement.
Any decrease in State Partnership funds will require a
revised finance letter.
2. The State Funds Share is calculated based on the lower of the
approved eligible application amount or the eligible award
amount.
3. The Reimbursement Ratio for this Cycle 4 (93/94) Project is
22.43%.
4. SPECIAL COVENANTS FOR SLTPP PROJECTS UNDER EARLY
REIMBURSEMENT PLAN AND UNDER $300,000 STATE SHARE
These Covenants supersede any conflicting provisions of the
Master Agreement:
A. The LOCAL ENTITY agrees that the payment of State Share
Funds will be limited to the lessor of the product of
multiplying the calculated pro rata percentage as determined by
the STATE by either:
(a) The eligible award amount or
(b) The total eligible State/Local Partnership Project cost
in the approved State/Local Partnership Program Application and
accepts any consequent increase in LOCAL ENTITY funding
requirements.
B. The LOCAL ENTITY will invoice the State for the full "State's
Share" after the contract award or upon the State Budget Act
appropriation of funds, whichever occurs later. "State's Share"
Page 2 of 3
07-LA-0-SCTA DATE: 03/02/95
SB94-5450(036)
SPECIAL COVENANTS OR REMARKS
is considered a grant and will be reimbursed as a lump sum
payment regardless of final project cost.
C. Prior to reimbursement under this Program Supplement, a
Request For Early Reimbursement form, executed by the LOCAL
ENTITY, must be on file with the STATE.
D. The financial audit and Final Project Expenditure Report
provisions of Sections 9 and 10 of ARTICLE I of the Master
Agreement are not applicable to this PROJECT.
5. In accordance with the State and Local Transportation Partnership
Program Guidelines dated April 1993, Section IV, Project
Eligibility, the 1026 allowance for construction engineering and
contingencies is not eligible after Cycle 2. Only state/agency
furnished materials can be added to the contract item cost for
State Partnership funds eligibility.
Page 3 of 3
P
Date: March 2, 1995
PROGRAM SUPPLEMENT NO. 018 Location: 07-LA-0-SCTA
to Project Number: SB94-5450(037)
STATE -LOCAL TRANSPORTATION E.A. Number: 07-927677
PARTNERSHIP PROGRAM AGREEMENT NO. SLTPP-5450
This Program Supplement is hereby incorporated into the State -Local Trans-
portation Partnership Program Agreement for State Share Funds which was
entered into between the Local Entity and the State on 03/09/92 and is
subject to all the terms and conditions thereof. This Program Supplement
is adopted in accordance with Paragraph 3 of Article I of the aforemen-
tioned Master Agreement under authority of Resolution No,
approved by the Local Entity on (See copy attached),
The Local Entity further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with any covenants or
remarks setforth on the following pages.
PROJECT TERMINI:
SOLEDAD CANYON RD: 54001E/O BOUQUET CYN RD TO 901E/O OF LANGSIDE
TYPE OF WORK: STREET OVERLAY/RECONSTRUCTION LENGTH: 2.4 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X) Construction
Estimated Cost State Share Funds Matching Funds
FY94 $ 109355 Local OTHER OTHER
$ 487541 FY95 $ 0 $ 378186 $ 0 $ 0
FY96 $ 0
City of Santa Clarita STATE OF CALIFORNIA
Department of Transportation
By By
Chief, Local Assistance Branch
District 7
Date Date
Attest
Title
I hereby Certify upon my personal knowledge that b dgeted funds are available for this encumbrance:
Accounting Officer Date $ 109355.00
Chapter Statutes I Item Year I Program incl Fund Source I AMOUNT
55 1993 2660-125-042 93-94 20.25.010.100 C 258010 042-T 109355.00
Page 1 of 3
07-LA-0-SCTA DATE: 03/02/95
SB94-5450(037)
SPECIAL COVENANTS OR REMARKS
1. It is mutually understood between the parties that this
contract may have been written before ascertaining the
availability of legislative appropriation of funds, for
the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the
agreement were executed after that determination was
made.
The total amount of State -Local Transportation
Partnership funds payable by the State shall not exceed
$109355 to be encumbered and reimbursed as follows:
FY 93-94 $ 109355
FY 94-95 0
FY 95-96 0
Any increase in State Partnership funds will require a
revised program supplement.
Any decrease in State Partnership funds will require a
revised finance letter.
2. The State Funds Share is calculated based on the lower of the
approved eligible application amount or the eligible award
amount.
3. The Reimbursement Ratio for this Cycle 4 (93/94) Project is
22.430.
4. SPECIAL COVENANTS FOR SLTPP PROJECTS UNDER EARLY
REIMBURSEMENT PLAN AND UNDER $300,000 STATE SHARE
These Covenants supersede any conflicting provisions of the
Master Agreement:
A. The LOCAL ENTITY agrees that the payment of State Share
Funds will be limited to the lessor of the product of
multiplying the calculated pro rata percentage as determined by
the STATE by either:
(a) The eligible award amount or
(b) The total eligible State/Local Partnership Project cost
in the approved State/Local Partnership Program Application and
accepts any consequent increase in LOCAL ENTITY funding
requirements.
B. The LOCAL ENTITY will invoice the State for the full "State's
Share" after the contract award or upon the State Budget Act
appropriation of funds, whichever occurs later. "State's Share"
Page 2 of 3
N
07-LA-0-SCTA DATE: 03/02/95
SB94-5450(037)
SPECIAL COVENANTS OR REMARKS
is considered a grant and will be reimbursed as a lump sum
payment regardless of final project cost.
C. Prior to reimbursement under this Program Supplement, a
Request For Early Reimbursement form, executed by the LOCAL
ENTITY, must be on file with the STATE.
D. The financial audit and Final Project Expenditure Report
provisions of Sections 9 and 10 of ARTICLE I of the Master
Agreement are notapplicable to this PROJECT.
In accordance with the State and Local Transportation Partnership
Program Guidelines dated April 1993, Section IV, Project
Eligibility, the loo allowance for construction engineering and
contingencies is not eligible after Cycle 2. Only state/agency
furnished materials can be added to the contract item cost for
State Partnership funds eligibility.
Page 3 of 3
PROGRAM SUPPLEMENT NO. 019
to
STATE -LOCAL TRANSPORTATION
PARTNERSHIP PROGRAM AGREEMENT NO
Date: March 2, 1995
Location: 07-LA-0-SCTA
Project Number: SB94-5450(041)
E.A. Number: 07-927678
SLTPP-5450
This Program Supplement is hereby incorporated into the State -Local Trans-
portation Partnership Program Agreement for State Share Funds which was
entered into between the Local Entity and the State on 03/09/92 and is
subject to all the terms and conditions thereof. This Program Supplement
is adopted in accordance with Paragraph 3 of Article I of the aforemen-
tioned Master Agreement under authority of Resolution No.
approved by the Local Entity on (See copy attached).
The Local Entity further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with any covenants or
remarks setforth on the following pages.
PROJECT TERMINI:
SOLEDAD CANYON ROAD: SIERRA HWY TO 1000 FT E/O SIERRA HWY
TYPE OF WORK: MEDIAN MODIFICATION LENGTH:. 0.2 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X] Construction
Estimated Cost State Share Funds Matching Funds
FY94 $ 14938 Local OTHER OTHER
$ 66597 FY95 $ 0 $ 51659 $ 0 $ 0
FY96 $ 0
City of Santa Clarita STATE OF CALIFORNIA
Department of Transportation
By
By Chief, Local Assistance Branch
District 7
Date Date
Attest
Title
I hereby Certify upon my personal knowledge that bud eted funds are available for this encumbrance:
Accounting Officer Date $ 14938.00
Chapter Statutes I Item Year Program 113C Fund Source AMOUNT
55 1993 2660-125-042 93-94 20.25.010.100 C. 258010 042-T 14938.00
Page 1 of 3
07 -LA 0-SCTA
SB94-5450(041)
SPECIAL COVENANTS OR REMARKS
DATE: 03/02/95
1. It is mutually understood between the parties that this
contract may have been written before ascertaining the
availability of legislative appropriation of funds, for
the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the
agreement were executed after that determination was
made.
The total amount of State -Local Transportation
Partnership funds payable by the State shall not exceed
$14938 to be encumbered and reimbursed as follows:
FY 93-94 $ 14938
FY 94-95 0
FY 95-96 0
Any increase in State Partnership funds will require a
revised program supplement.
Any decrease in State Partnership funds will require a
revised finance letter.
2. The State Funds Share is calculated based on the lower of the
approved eligible application amount or the eligible award
amount.
3. The Reimbursement Ratio for this Cycle 4 (93/94) Project is
22.430.
4. SPECIAL COVENANTS FOR SLTPP PROJECTS UNDER EARLY
REIMBURSEMENT PLAN AND UNDER $300,000 STATE SHARE
These Covenants supersede any conflicting provisions of the
Master Agreement:
A. The LOCAL ENTITY agrees that the payment of State Share
Funds will be limited to the lessor of the product of
multiplying the calculated pro rata percentage as determined by
the STATE by either:
(a) The eligible award amount or
(b) The total eligible State/Local Partnership Project cost
in the approved State/Local Partnership Program Application and
accepts any consequent increase in LOCAL ENTITY funding
requirements.
B, The LOCAL ENTITY will invoice the State for the full "State's
Share" after the contract award or upon the State Budget Act
appropriation of funds, whichever occurs later. "State's Share"
Page 2 of 3
, r _
s 07-LA-0-SCTA DATE: 03/02/95
SS94-5450(041)
SPECIAL COVENANTS OR REMARKS
is considered a grant and will be reimbursed as a lump sum
payment regardless of final project cost.
C. Prior to reimbursement under this Program Supplement, a
Request For Early Reimbursement form, executed by the LOCAL
ENTITY, must be on file with the STATE.
D. The financial audit and Final Project Expenditure Report
provisions of Sections 9 and 10 of ARTICLE I of the Master
Agreement are not applicable to this PROJECT.
5. In accordance with the State and Local Transportation Partnership
Program Guidelines dated April 1993, Section IV, Project
Eligibility, the 10a allowance for construction engineering and
contingencies is not eligible after Cycle 2. Only state/agency
furnished materials can be added to the contract item cost for
State Partnership funds eligibility.
Page 3 of 3
• Date: March 2, 1995
PROGRAM SUPPLEMENT NO. 020I Location: 07-LA-0-SCTA
Project Number: SB94-5450(044)
to
STATE -LOCAL TRANSPORTATION E.A. Number: 07-927679
PARTNERSHIP PROGRAM AGREEMENT NO. SLTPP-5450
This Program Supplement is hereby incorporated into the State -Local Trans-
portation Partnership Program Agreement for State Share Funds which was
entered into between the Local Entity and the State on 03/09/92 and is
subject to all the terms and conditions thereof. This Program Supplement
is adopted in accordance with Paragraph 3 of Article I of the aforemen-
tioned Master Agreement under authority of Resolution No.
approved by the Local Entity on (See copy attached).
The Local Entity further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with any covenants or
remarks setforth on the following pages.
PROJECT TERMINI:
SAN FERNANDO ROAD(RTE 126) PHASE V: VALENCIA
BLVD TO BOUQUET CYN RD
TYPE OF WORK: STREET & BRIDGE WIDENING
LENGTH: 0.0 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
[X] Construction
Estimated Costl State Share Funds
Matching Funds
$ 933452
Local
OTHER
OTHER
$ 4161622IFY94
FY95 $ 0
$
3228170
$ 0
$ 0
FY96 $ 0
City of Santa Clarita
STATE OF CALIFORNIA
Department of Transportation
By
By
Chief, Local Assistance Branch
District 7
Date
Date
Attest
Title
I hereby Certify upon my personal knowledge that budgeted funds are availablefor this encumbrance:
Accounting Officer
Date $ 933452.00
Chapter] Statutes Item Year
Program ' BBC1 Fund Source I 86OMT
55 1993 2660-125-042 93-94
.20.25.010.100 C 258010 042-T 933452.00
Page 1 of 2
07-LA-0-SCTA
SB94-5450(044)
SPECIAL COVENANTS OR REMARKS
DATE: 03/02/95
1. It is mutually understood between the parties that this
contract may have been written before ascertaining the
availability of legislative appropriation offunds, for
the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the
agreement were executed after that determination was
made.
The total amount of State -Local Transportation
Partnership funds payable by the State shall not exceed
$933452 to be encumbered and reimbursed as follows:
FY 93-94 $ 933452
FY 94-95 0
FY 95-96 0
Any increase in State Partnership funds will require a
revised program supplement.
Any decrease in State Partnership funds will require a
revised finance letter.
2, The State Funds Share is calculated based on the lower of the
approved eligible application amount or the eligible award
amount.
3. Within 120 days of project completion a Final Report of
Expenditures must be transmitted to the Caltran's District Local
Streets and Roads Engineer.
4. The Reimbursement Ratio for this Cycle 4 (93/94) Project is
22.43%.
S. In accordance with the State and Local Transportation Partnership
Program Guidelines dated April 1993, Section IV, Project
Eligibility, the 10i allowance for construction engineering and
contingencies is not eligible after Cycle 2. Only state/agency
furnished materials can be added to the contract item cost for
State Partnership funds eligibility.
Page 2 of 2