SUBJECT: An appeal of the Planning Commission's approval of a conditional use permit to allow
for the development of a 3.3 acre site with a car wash facility and other auto -related
service businesses. The project is located adjacent to the southwest corner of Valencia
Boulevard and Cinema Drive (Assessor's Parcel Nos. 2811-026-006 & 027), and is zoned
CC (Community Commercial).. Project Applicant: Cardinal Development / Cressel-
Wilcke Partnership. Project Appellant: Valencia Auto Care Center.
DEPARTMENT: Community Development
BACKGROUND
On November 15, 1994, the Planning Commission adopted Resolution P94-16, approving Master Case 94-
112 (Conditional Use Permit 94-004). The project would include the development of a car wash facility and
other auto -related businesses in the CC (Community Commercial ) zone. Proposed is the construction of
four buildings, with a total floor area of 24,866 square feet. Access to the site includes one drive approach
off of Valencia Boulevard, and one drive approach off of Cinema Drive. The applicant is proposing to
construct 107 parking spaces in conjunction with the development.
Master Case 94-112 was appealed by Charles J. Lockett of the Valencia Auto Care Center, on November
28, 1994. The appeal was based on concerns with the potential for additional traffic conflicts on Cinema
Drive and Valencia Boulevard, concern about the number of other car washes which are within close
proximity to the proposed project, and concern about the appropriateness of the project site for a car wash
facility as opposed to other retail and/or service oriented businesses.
PLANNING COMMISSION ACTION
The project was originally heard by the Planning Commission on October 18, 1994.. Issues cited by the
Commission with regard to the project were related to the potential for both on and off-site traffic conflicts
associated with the project's site design.
During the meeting of October 18, 1994, the Commission focused on staffs concerns with traffic conflicts
generated by the site specific layout of the project, and discussed alternatives in order to improve the
project's on-site and off-site circulation patterns. The Planning Commission directed the applicant to
consult with staff and return with a modified site plan, and tabled the item to a date uncertain.
p APPROVED Agenda Itern.- /
On November 15, 1994, the applicant returned to the Planning Commission with a modified site plan. The
applicant had met with staff, and had incorporated changes to the site plan which included the addition
of a right turn pocket and deceleration lane along Valencia Boulevard, totaling a length of 180 feet, the
addition of on-site directional signage encouraging patrons of the center to utilize Cinema Drive as an exit,
and the addition of a landscaped buffer area at the Valencia Boulevard access point in order to mitigate
traffic conflicts with vehicular traffic exiting the drying area of the car wash.
After receiving public testimony and deliberating, the Commission conditionally approved the project by a
vote of 3-2, with Commissioners Cherrington and Brathwaite dissenting. The Planning Commission
required the applicant to incorporate the following modifications to the project:
1) An increase in the landscaped setback area along Valencia Boulevard by 10'-0", thus increasing the
setback area to a total width of 20'-0".
2) Relocation of the freestanding convenience gas island pumps 10'-0" farther north on the project site,
including the elimination of 10'-0" of the building area of service building "D" in order to
accommodate the relocated gas island pumps.
3) Modification of the site plan to allow for a 40'-0" drive aisle width between service building "A" and
the freestanding convenience gas island pumps.
ANALYSIS
The applicant hired Austin -Foust Associates, Inc, a traffic engineering and transportation planning group,
to analyze trip generation patterns created by the project. According to Austin -Foust Associates, Inc., the
proposed project creates a demand for 85 entering trips during the typical weekday PM peak hour, 60 of
which will make right turns on to the project site from Valencia Boulevard. The car wash itself would
generate approximately 30 of the entering trips from Valencia Boulevard. By way of comparison, a typical
retail use on this property would create two and a half times as many total right turns.
Three letters of opposition were submitted to the Planning Commission, two from representatives of the
Valencia Car Wash, and one from a representative of the neighboring Mann's Theater complex. During the
meeting of November 15, 1994, a total of three persons spoke in favor of the project while a total of six
persons spoke in opposition to the development.
RECOMMENDATION
The Planning Commission recommends that the City Council:
1) Approve Master Case 94-112; and,
2) Direct staff to prepare a resolution of approval for the Council's consideration at the February 14,
1995, meeting.
ATTACHMENTS
Planning Commission Resolution and Conditions
Planning Commission Minutes and Staff Reports
Correspondence
GAC:RAH:JDR
cow it\ar 4112.jdr
e alencia War dash
CITY OF SANTA CLARITA
23920 VALENCIA BLVD., SUITE 300
SANTA CLARITA, CA 91355-2190
ATTN. DONNA M. GRINDEY
CITY CLERK
NOTICE OF APPEAL TO THE CITY COUNCIL
RE: MASTER CASE NO. 94-112
(CONDITIONAL USE PERMIT 94-004, RESOLUTION P94-16)
LOCATION: ADJACENT TO THE SOUTHWEST CORNER OF
VALENCIA BLVD, AND CINEMA DRIVE
HONORABLE CITY COUNCIL - CITY OF SANTA CLARITA,
THIS LETTER CONSTITUTES OUR FORMAL NOTICE OF APPEAL TO THE CITY
COUNCIL TO THE ACTION TAKEN BY THE PLANNING COMMISSION AT THEIR MEET-
ING ON NOVEMBER 15, 1994, IN GRANTING A REQUEST FOR A CONDITIONAL USE
PERMIT IN AND UNDER THE ABOVE CAPTIONED CASE NUMBER AND AFFECTING THE
ABOVE DESCRIBED LOCATION IN GRANTING A CAR WASH USEAGE.
THIS APPEAL IS BASED ON AT LEAST THE FOLLOWING REASONS:
1. THE APPROVAL OF A CAR WASH AT SAID LOCATION CAUSES ADDITIONAL
TRAFFIC PROBLEMS ON CINEMA DRIVE AND VALENCIA BLVD. THESE PROBLEMS ARE
MOST AGGRAVATED DUE TO THE FACT THAT SATURDAYS AND SUNDAYS ARE THE
BUSIEST DAYS IN A CAR WASH OPERATION AND ALSO HAPPEN TO BE THE BUSIEST
DAYS IN THE MOVIE THEATRE BUSINESS WHICH IS CLOSE TO THE PROPOSED CAR
WASH. THE MOVIE THEATRE TRAFFIC IS ALREADY BAD ON THE WEEKEND, PARTI-
CULARLY ON SATURDAYS, AND WILL, BY THE ADDITION OF THE PROPOSED CAR
WASH, BECOME INTOLERABLE AND UNACCEPTABLE TO THE COMMUNITY.
2. THE PROPOSED CAR WASH WILL NOT BENEFIT THE COMMUNITY NOR IS
SAME NEEDED, AS THE COMMUNITY IS ALREADY SERVED BY APPROXIMATELY FIVE
OTHER CAR WASHES WITHIN A REASONABLY CLOSE DISTANCE. THREE CAR WASHES
ARE WITHIN A HALF -MILE OF THE SITE!
3. THE AREA BEING PROPOSED FOR ANOTHER CAR WASH WOULD BE MUCH
MORE SUITABLE FOR OTHER USES.
24233 Creekside Road Valencia, CA 91355 (8051255-3448
PAGE 2
CITY OF SANTA CLARITA
NOTICE OF APPEAL TO THE CITY COUNCIL
4. FOR SUCH OTHER REASONS THAT MAY BE RELEVANT AND APPROPRIATE.
WHEREFORE. WE SUBMIT THAT ANY FINDINGS BY THE COMMISSION THAT THE
SITE WILL NOT GENERATE EXCESS TRAFFIC ON SURROUNDING STREETS ARE IN
ERROR, WE ALSO SUBMIT THAT THE SITE WILL HAVE A HARMFUL EFFECT UPON
DESIRABLE NEIGHBORHOOD CHARACTER. WE ALSO SUBMIT THAT THE PROPOSED
USE AND THE CONDITIONS UNDER SAME WILL BE DETRIMENTAL TO PUBLIC WEL-
FARE AND/OR MATERIALLY INJURIOUS TO PROPERTIES AND/OR IMPROVEMENTS IN
THE VICINITY.
THEREFORE, IT IS REOESTED THAT THE COUNCIL OVERRULE THE DECISION
OF THE PLANNING COMMISSION AND THAT THE CONDITIONAL USE PERMIT BE
DENIED.
ACCOMPANYING THIS NOTICE OF APPEAL TO THE CITY COUNCIL IS THE
REQUIRED FEE FOR SAME IN THE SUM OF 3465.00.
RESPECTFULLY SUBMITTED,
VALENCIA AUTO CARE CENTER
AKA VALENCIA CAR WASH
BY: Ll'"LL f �sr
DATED: 400 �- R , 1994
THE PLANNING COMMISSION
OF THE CITY OF SANTA CLARITA
Tuesday
October 18, 1994
7:00 p.m.
ITEM 4 MASTER CASE NUMBER 94-112 (CONDITIONAL USE PERMIT 94-004)
Rich Henderson introduced the item, a conditional use permit to allow for the development
of a car wash in a Community Commercial zone.The applicant is also proposing to develop
the site with automobile related service businesses. Included in the applicant's request for
auto related services are tire sales and a quick lube service. Notices were sent out but no
responses were received.
Jennifer Reid, Planning Technician, gave the staff report and slide presentation. Two letters
of opposition were received on the project after the packet was prepared. She stated staff
recommendations were to direct the applicant to modify the site plan to either relocate the
car wash facility to the eastern portion of the lot or reverse the traffic flow and queing area
of the car wash.
Commissioner Doughman asked if the development of the site would be all at once or one
facility at a time. Ms. Reid stated that as far as she had been told it would be all at one
time.
Commissioner Brathwaite asked how many car washes were in the area. Ms. Reid said there
were three within a one mile radius, the Arco station, Valencia Car Wash and the Unocal
station.. This did not include the car washes at Bouquet Canyon and Seco.
Commissioner Cherrington wanted to know what the need for a two story building was. Ms.
Reid answered that it was primarily for aesthetic purposes.
Commissioner Townsley asked what was behind Building C. Ms. Reid stated there is a
vacant portion of land between Building C and Trader Joe's Market,
Commissioner Modugno opened the Public Hearing at 10:18 p.m.
Carl Middleton, 375 Bristol, Suite 50, Costa Mesa, CA. Mr. Middleton is the applicant. He
stated the appearance of the auto care facilities is that of a two-story building but they are
actually one-story in height. It is done for visual appearances. This is the company's
fourteenth project. A slide presentation was given. What is planned is very upscale in
design with heavy landscaping. The centers are designed light in color, white with a lot of
greenery. The service bays will be parallel to Valencia Boulevard. The center is 90% pre-
leased.
Commissioner Cherrington asked who the lessees of the center were. Mr. Middleton said
they were the car wash, a quick lube, a tire store, a convenience automotive repair facility
and brake shop, specialty mechanics, and an accessories store.
Commissioner Cherrington commented on Bouquet Junction and how it is one of the busiest
intersections in the City. He asked Mr. Middleton if this use would flood Valencia Boulevard
with traffic. Mr. Middleton said the use characteristics were studied and it was found that
the traffic tends to be considerably less total volume, especially during peak hour volume.
Commissioner Brathwaite stated that the access/egress at the site would go directly into the
line of traffic coming in and going out. He felt that staffs redirection of the traffic toward
Cinema Drive made a lot of sense.
Mr. Middleton said he thought their plan worked very well. He felt the staff plan would
cause a potential safety movement because of the sudden stop and left turn.
Commissioner Brathwaite stated to Mr. Middleton that coming out of any driveway now in
existence along Valencia Boulevard is like trying to play "double -dutch" - if you miss the rope
you're going to get hit. He stated that what Mr. Middleton was saying did not make any
sense.
Chairman Modugno stated to Mr. Middleton that what was being presented as far as traffic
flow did not make logical sense from someone who drives in that area.
Randy Cressal, 10732 Sepulveda Boulevard, Mission Hills, CA. He is one of the applicants
for this project.. He has 34 years of operating experience in the automotive service field. He
stated their facility will maintain onsite water reclamation. He stated one of the main
concerns with staffs recommendation was the queing area, stacking area and safety pass-
thru, through the gas and fueling islands. He felt there was not sufficient space to do this.
The queing area would be limited.. He said the traffic would normally enter on Valencia
Boulevard but the normal traffic flow would exit out on Cinema Drive. He said additional
signs could be placed on the property recommending the consumer exit on Cinema Drive. If
forced to implement an unworkable site plan on the Auto Spa, it would destroy any
opportunity for a chance of success.
Commissioner Cherrington felt two of the issues were not addressed. One was the need for
an additional car wash at this site and the other was regarding the proposal that Buildings
C and D be exchanged. He wanted to know why this would not be workable.
Mr. Cressal said he did not own the parcel on which Building C was located. As far as
necessity for another car wash, he felt that the more there was to offer the consumer, the
better off the environment will be.
Jennifer Reid stated that the Conditional Use Permit for the car wash facility was the only
discretionary item. The rest of the site plan could be approved, the CUP is actually what the
Commission is making a decision on. If the applicant's feel that they do not want to modify
the site plan, traffic engineering did talk about a right -turn pocket and a deceleration lane
along Valencia Boulevard.
Rich Henderson said with just the automotive uses the plot plan could be approved.
Commissioner Doughman asked if one of the options could be not to allow an exit onto
Valencia Boulevard.
Mr. Henderson stated that the traffic engineers have informed staff that exiting onto
Valencia Boulevard is not a big issue, the danger is trying to get out of the moving traffic and
turn in to the driveway.
Commissioner Townsley asked if there were any CC & R's with this land. Mr. Middleton said
yes. There were CC & R's in the land purchase and the lease document.
Jeffrey Paul, 24233 Creekside Road, Valencia. He is a partner in Valencia Carwash, He is
against this project. It is within one mile of his facility and he feels it is too close. A fourth
car wash is not needed in the area.
Lawrence R. Lieberman, 9401 Wilshire Blvd., #1250, Beverly Hills, CA. He is the attorney
for Valencia CarCenter. He had concerns regarding the ownership and the enforcement of
the CC&R's.
Ken Strem, 28750 N. Citrus Place, Saugus. He is concerned with traffic. He feels there are
enough car washes in the area. There are new food establishments going up in the area. He
does not think people want to smell motor oil while they are eating. He would like to see
something for the young people of the community put at the location.
John VanDeventer, 28015 Glasser Avenue, Canyon Country, He runs Big John Performance
Tire in the Valencia Car Center. He does not see what difference this new car wash can
bring to the community. It has the same things as the Valencia Car Wash. He said it would
generate a lot of traffic.. He does not think it will benefit the community. He also feels the
moisture on the road will cause accidents.
Mr. Middleton responded to some of the comments that were made. He feels there is room
for competition. He presented his traffic engineer to answer questions. The traffic engineer
stated that the plan submitted by the applicant does not conflict with inbound traffic,
however, if changes were made as proposed by staff, the circulation would be affected.
Chairman Modugno stated the Commission is looking for something more functional that will
have traffic coming in off of Valencia Boulevard and exit off of Cinema.
Commissioner Brathwaite recommended that the applicant explore the changes proposed by
staff to generate a new circulation plan and come back with a modified plan instead of
reaching a conclusion that evening.
Commissioner Cherrington stated he did not see any notice of the hearing on Valencia
Boulevard or Cinema Drive. He said he was not enamored with an automotive center at the
location of the project. He thought the design was lovely. If it is not possible to have a
deceleration lane he felt Commissioner Doughman's suggestion that there be no access from
Valencia Boulevard was perfect. He would like to see a hold put on the minor use permit
until the issues on the conditional use permit are resolved.
Commissioner Doughman liked the design of the facility. He thought the location was okay.
His main concern was traffic flow and how it impacts Valencia Boulevard..
Chairman Modugno thought the design was appealing. He wished there would have been
an opportunity of putting in a right hand pocket. He felt something different had to come
back that would be appealing.
Commissioner Townsley thought the aesthetics were beautiful but stated that as a consumer,
if there is too much traffic, she would avoid the car wash. She stated this city has a road
deficit.
Mary Gayle said that if notice was not properly given the project would have to be
readvertised. She said the Commission could table this item pending return at a date to be
determined and upon readvertising.
Chairman Modugno told Mr. Middleton that the project looked fine on paper but there were
problems that have to be addressed.
Mr. Middleton said he will work with staff and try to resolve the issues. He stated he
understood the two main concerns to be the right turn pocket and the exiting movement from
the car wash traffic.
Commissioner Brathwaite asked staff to read what the proposals were..
Ms. Reid read what the proposals were to the Commission, no access off of Valencia
Boulevard; redesign the layout for the drying to be at the far end, not at the front end; a
deceleration lane; encourage traffic to exit at Cinema Drive or eliminate exiting at Valencia
Boulevard; consider building swapping if feasible or what the center would look like without
a car wash.
Commissioner Cherrington questioned the economic viability of having a car wash at this
location since there are others in the area.
Commissioner Doughman motioned for the item to be tabled and staff bring it back after it
has been properly advertised and the changes suggested by the Commission have been
reviewed, bringing forth a modified project and withholding the minor use permit for the tire
usage. Said motion was seconded by Commissioner Brathwaite. The motion was carried by
a vote of 5-0.
0
MINUTES OF
THE PLANNING COMMISSION
OF THE CITY OF SANTA CLARITA
Tuesday
November 15, 1994
7:00 p.m.
ITEM 4: MASTER CASE NUMBER 94-112 (CONDITIONAL USE PERMIT 94-004),
RESOLUTION P94-16
Rich Henderson introduced the item, a continued hearing for the Autoplex Center. He stated
that since the last hearing some things had taken place. Staff had met with the developer
and through discussions some minor redesigns had taken place. The developer has offered
the right turn pocket. The developer did not feel that it was feasible to put the car wash
more to the rear.
Jennifer Reid, Planning Technician, gave the staff report along with a slide presentation. Ms.
Reid stated the developers met with staff and submitted a revised site plan with changes that
were recommended by staff that would help mitigate the traffic conflict at the Valencia
Boulevard access point. She stated that staff is concerned with the negative visual impact
along Valencia Boulevard that would be associated with some of the auto related uses. Ms.
Reid said the developer had proposed a four foot high landscaped berm area along Valencia
Boulevard. Ms. Reid stated that staff recommends that the car wash facility be relocated to
the eastern portion of the lot, replace service building C with the auto wash facility and
include the incorporation of the traffic mitigation measures submitted by the applicant on the
revised site plan.
Commissioner Cherrington asked if the 180 feet length of the deceleration lane extended off
the property to the south. Ms. Reid replied that it did. He also wanted to know if there was
a need for bike racks. Ms. Reid said this condition is always required by the Parks and
Recreation Department.
The public hearing was reopened at 8:15 p.m.
Carl Middleton, 375 Bristol, Suite 50, Costa Mesa. He is the applicant. They have worked
with staff to identify the issues and to clarify ways to better improve the site. He believes
that what they have come up with shows substantial improvement with respect to the major
issues of traffic circulation both on site and ingress and egress to the property.
Mr. Middleton said that once traffic crosses the bridge, the northbound traffic on Valencia
Boulevard would encounter the new deceleration lane. The deceleration lane would be 180
feet long and provide the car an opportunity to slow down and make a turn at a safe speed
onto the property. The driveway has been kept at 40 feet in width, 15 feet wider than a
standard driveway configuration. He stated that once the customer leaves either the car
wash, quick lube, or other service facilities, they would be encouraged to make a left-hand
turn on to Cinema Drive back to Valencia Boulevard. There would also be directional
signage. He feels that the improvements that have been made will make the site safer.
Commissioner Brathwaite asked how many gasoline islands there were. Mr. Middleton said
there would be five islands.
Commissioner Doughman asked what percentage of the customers would turn right going out
on to Valencia Boulevard. Mr. Middleton let Joe Faust, the traffic engineer for the applicant,
give the information, Mr. Faust said the actual figure would be 40-45%. Commissioner
Doughman also wanted to know if a large car would have a problem making a turn. Mr.
Faust answered that the driveway has been made larger than required and there would not
be any problems with large cars blocking the driveway..
Commissioner Cherrington asked how many cars could stack up at the car wash dispensing
area. Mr. Middleton said there was stacking for 24 cars, 4 lanes with 6 cars per lane.
Commissioner Cherrington asked how important the convenience pump area was. He said
it seems this is what blocks the traffic flow for virtually everything on the site. Mr.
Middleton answered the car wash operator felt the pumps were important, that this is a
heavy commuting area and there may be a need for gasoline without someone getting their'
car washed.
Commissioner Doughman asked if there would be a convenience store. Mr. Middleton said
there would be convenience items but it is not meant to be a full convenience store like an
Arco AM/PM The primary facility is the car wash. There would be sodas, snacks, and car
wash accessories. There would also be restroom facilities.
Commissioner Cherrington asked where the market for another car wash facility comes from.
Mr. Middleton answered that there were several factors, the growth of the community, the
toxic issues associated with grease, oil and soap and the fact that the car wash uses less
water than if you washed it at home because of the water reclamation system.
Commissioner Brathwaite made reference to the fact that there are five other car washes in
the area. He asked if this was a good location. Mr. Middleton said the market place has
been analyzed. There is a lot of growth in the area and this car wash is more of a full service
facility.
Mark Subbotin, 23825 Valencia Boulevard, representing the Valencia Company, spoke to the
Commission. He addressed the concern raised in the staff report regarding the potential for
negative visual impact along Valencia Boulevard. He stated he felt the car wash was
architecturally pleasing. Outside storage would be regulated through the CC&R's. There
would be no outside storage of tires or outside repair of vehicles. He said the car wash is set
back over 100 feet from Valencia Boulevard which allows for the landscaping in front. Mr.
Subbotin said there would be a 10 foot landscaping berm across the front of the property to
enhance the visual appearance. If the Commission desires, there is an opportunity to provide
up to an additional 10 feet of landscaping across the front of the car wash property to further
screen it from the street.
Allan Cameron, 27612 Ennismore, Santa Clarita. He said the fact that this is a "hand wash"
car wash it makes it unique. He recommended approval of this project..
Norman Stern, 14044 Ventura Boulevard, Sherman Oaks. He is opposed to this project. He
is associated with the Valencia Car Wash. He feels there is more detriment to this project
2
than there is good. He cited the traffic problems and the fact that there are other car washes
in the area.
Steve Strem, 8029 Masefield Court, West Hills. He is employed by California Business
Services and he specializes in the financial review of car washes to determine their possible
success in any area. He feels the project has not been analyzed adequately. He feels that
the traffic will be very heavy, especially on Cinema Drive. He brought up the fact that most
people wash their cars on the weekend and Cinema Drive is heavily congested on the
weekend because of the Mann Theaters.
Reena Newhall, 26084 Charing Cross, Valencia. She represents Cinema Plaza Partners.
She wondered if a car wash was the best possible use for the land. She felt that the center
of the city is not best served by a car wash and automotive repair facility. She is concerned
that there will be trash and debris. She is also concerned about the traffic. Ms. Newhall felt
there were enough car washes in the area.
Carol D'Egidio, 17410 Rayen Street, Northridge. Ms. D'Egidio is one of the owners of
property next to the proposed site. She was surprised when she heard a car wash was
proposed. She feels it does not conform with the rest of the area. She is concerned about the
traffic. She feels it will create traffic problems. She urged denial of this project.
John Capra, 9944 Glade Avenue, Chatsworth. He is a property owner on Valencia Boulevard.
He is concerned about the traffic. He does not feel there will be adequate parking for the
center. He does not think Cinema Drive can handle anymore traffic.
Michael D'Egidio, 5502 Welsey Drive. He is concerned about traffic and he does not think
there is a need for another car wash.
Carl Middleton was given an opportunity to address any issues raised by the previous
speakers. He stated his facility will be clean. They will work very hard to accomplish this.
He also stated one of the misconceptions regarding the car wash was the amount of traffic.
The site will be well managed.
The Public Hearing was closed at 9:10 p.m.
Commissioner Townsley said she was happy to see CC&R's. She did not have a problem with
the proposed project and would endorse it.
Commissioner Cherrington felt the development team did a great job of presenting the
project; however, he did not think this was a suitable location for it to be developed. He is
very concerned about the internal traffic flow. Commissioner Cherrington had concerns
regarding the convenience pumps.. He would support the project if it was at another location
which did not present a traffic hazard.
Commissioner Doughman stated he had concerns regarding traffic flow. He would prefer that
all traffic come and go off Cinema Drive. He also had concerns regarding the convenience
island and suggested having one island instead of two. He would like to have seen something
other than a car wash on the site. He felt the car wash was well designed.
Commissioner Brathwaite stated he had a problem with the car wash being there. He felt
there were better locations for the car wash where it would not be on the main drag
Chairman Modugno felt the developer addressed the concerns that were brought up at the
last meeting. He said the design of the building blended well with the area. He could
support the project. He asked Mr. Middleton to step back up to the podium. He asked him
what would happen if the number of convenience pumps was cut:
Mr. Middleton stated he would like to have several minutes to discuss the matter with the
car wash operator.
Commissioner Doughman said he would like the issue of more landscaping to be discussed
along with the elimination of one island.
Commissioner Cherrington clarified he would like the removal of the ramada and the removal
of the convenience pumps in that area all together.
RECESS
Chairman Modugno called a recess at 9:25 p.m.
RECONVENE
The meeting was reconvened at 9:35 p.m
Mr. Middleton proposed to agree to the 10 foot landscape setback increase. He asked the
Commission to consider a shifting of the pumps which would increase the pass-through area
to 40 feet instead of 26 feet. The islands would be moved closer together but they would not
eliminate any of the pumps. There would be a distance of 36 feet between the two islands
which is standard in the industry.
Randy Cressel, the car wash operator, explained what would be done. The entire parcel
would be shifted, and the building would be made a little smaller, and the canopied area
would be moved approximately 10 feet. The convenience islands could be squeezed closer
together which would leave a 40 foot pass-through area.
Commissioner Brathwaite said the new proposals do not decrease nor diminish the traffic
flow or congestion in that area. Moving the islands closer to the building creates a problem
area north of the islands. He did not feel the changes would benefit the site.
Commissioner Cherrington felt the proposed changes were not desirable. It is a compromise
move, not a consensus move. He said it fails to achieve the objectives that the applicants
wanted and the objectives he would have.
A motion was made by Commissioner Doughman and seconded by Commissioner Townsley
to approve Master Case Number 94-112 (Conditional Use Permit 94-004), Resolution P94-16
with the added conditions of additional landscaping along Valencia Boulevard, elimination
of part of the building and the movement of the gas pumps to provide a 40 foot driveway
space. It would also include approval of the tire store. The motion was carried on a vote of
3-2 with Commissioners Brathwaite and Cherrington dissenting.
51
CITY OF SANTA CLARITA
STAFF REPORT
MASTER CASE NO. 94-112
CONDITIONAL USE PERMIT 94-004
DATE: November 15, 1994
TO: Chairman Modugno and Members of the Planning Commission
FROM: Lynn M. Harris, Deputy City Manager, Community Development
CASE PLANNER: Jennifer Reid, Planning Technician
APPLICANT: Cardinal Development / Cressel-Wilcke Partnership
LOCATION: Adjacent to the southwest corner of Valencia Boulevard and Cinema
Drive. Assessor's Parcel Nos. 2811-026-006 & 027.
REQUEST: A conditional use permit request to allow for the development of a car
wash facility in the CC (Community Commercial) zone. The applicant
is also proposing to develop the site with other automobile -related
service businesses.. Included in the applicant's proposal for auto -related
services are tire sales and a quick lube service.
BACKGROUND
On September 20, 1994, Cardinal Development and the Cressel-Wilcke Partnership filed,
with the City of Santa Clarita, for a development review and conditional use permit for a car
wash facility in the CC (Community Commercial) zone. Along with the applicant's request
for a car wash were other auto -related service businesses. According to Section 17.13.050 of
the Unified Development Code, car wash facilities are a permitted use in the CC zone with
the inclusion of an approved conditional use permit. The applicant has also proposed tire
sales, a use which requires a minor use permit in the CC zone, and a quick lube auto service
business as additional auto -related establishments.
Conditional Use Permit #94-004 was originally presented to the Planning Commission on
October 18, 1994. During the meeting, the Commission focused on staffs concerns with the
potential traffic conflicts generated by the project's site design. The following alternatives
were discussed in order to improve the on-site and off-site circulation patterns created by the
design of the proposed project:
- Conditioning the developer to construct a right turn pocket and deceleration lane
along the Valencia Boulevard street frontage. If the addition of a deceleration lane
was not feasible, then potentially blocking all access off of Valencia Boulevard.
- Modifying the on-site circulation by reversing the traffic flow and queuing area of
the car wash.
Members of the Commission also addressed concern with the appropriateness of the use of
a car wash on the subject site.
Staffs recommendation was that the Planning Commission direct the applicant to return
with a modified site plan, in order to mitigate the potential traffic conflicts that were created
by the proposal's circulation patterns. During the course of the presentation, the Commission
discussed several design options with the applicant, and directed the applicant to consult
with staff and return with a modified site plan. With a 5-0 vote, the Planning Commission
tabled the item to a date uncertain. The minutes for the meeting of October 18, 1994, are
attached for your reference.
ANALYSIS
Staffs review of the original proposal had addressed concern about the site's design with
regard to the safety of vehicular traffic along Valencia Boulevard. The site's main access point
is located off of Valencia Boulevard, a major street in which the average speed of traffic is 45-
50 miles per hour, The Traffic Engineering Section had expressed that they preferred the
developer to provide a right turn pocket with a deceleration lane along Valencia Boulevard,
in order to accommodate the traffic that would be turning into the project site.
The applicant hired Austin -Foust Associates, Inc., a traffic engineering and transportation
planning group, to analyze trip generation patterns created by the project. According to
Austin -Foust Associates, Inc., the proposed project creates a demand for 85 entering trips
during the typical weekday PM peak hour, 60 of which will make right turns on to the project
site from Valencia Boulevard. The car wash itself would generate approximately 30 of the
entering trips from Valencia Boulevard. By way of comparison, a typical retail use on this
property would create two and a half times as many total right turns.
Design options were discussed between the developer and staff that have the potential to
mitigate negative traffic impacts at the Valencia Boulevard access point, which were created
by the original design of the site. In discussing these options, the developer and staff
reached an agreement that the most feasible option is for the developer to provide a right
turn pocket and deceleration lane along Valencia Boulevard. Austin -Foust provided staff
with information justifying a deceleration lane length of 160 feet, while staff expressed a
concern that this proposed length would not adequately serve the purpose of accommodating
the 45-50 mile per hour traffic that would turn right into the project site. An agreementwas
made between the developer and staff, with the conclusion that a right turn pocket of 180 feet
in length would adequately serve the Valencia Boulevard traffic turning right onto the project
site. The documentation provided by Austin -Foust has been included for your reference.
After meeting with staff, the developer re -submitted the site plan with the following changes:
A transition lane and right turn pocket, with a total length of 180 feet, has
been provided along the Valencia Boulevard street frontage.
Service building "A" has been shifted slightly towards the east on the project
site, in order to accommodate the 10'-0" landscaping setback requirement along
Valencia Boulevard. The shift of service building "A" will require the
elimination of six (6) parking spaces. 107 on-site parking spaces are currently
proposed, 17 more than are required by the Unified Development Code.
A landscaping buffer has been provided at the Valencia Boulevard access point,
in order to mitigate traffic conflicts with vehicular traffic exiting the drying
area of the car wash. Directional signage encouraging patrons of the auto
center to use Cinema Drive as an exit will be located in this landscaped buffer
area.
Service building 'D" has been shifted towards the north of the project site, in
order to accommodate the right turn pocket. A 5'-0" landscaped area between
the adjacent site and the project site has been provided for by the applicant.
Additional on-site directional signage will be placed in the appropriate
landscaped areas to encourage patrons of the auto -related businesses to use
Cinema Drive as an exit.
The original recommendation for this project discussed two design options which would
mitigate the negative traffic impacts associated with the design of the site. One of the
options discussed reversing the traffic flow and queuing area of the car wash, while the other
option addressed the potential on-site exchange of service building "C" with the car wash
facility. Staff feels, though, that the changes proposed by the developer adequately address
the concerns originally expressed regarding traffic conflicts created by the site's design. A
right turn pocket and transition lane, along with the additional on-site directional signage
and landscaped buffer area at the Valencia Boulevard access point will mitigate potential on-
site and off-site traffic conflicts. Staff feels that a reasonable compromise has been met, and
that the submitted site plan adequately addresses the traffic concerns originally expressed
by staff and by the Planning Commission.
Staff has also expressed concern with the potential for negative visual impacts along Valencia
Boulevard, due to the close proximity of the car wash facility to the street. The applicant has
provided a bermed landscaped setback area along the Valencia Boulevard street frontage in
order to mitigate the negative visual impacts associated with the auto -related uses. However,
one design alternative is available which would mitigate the negative visual impacts
associated with the car wash facility. This option includes relocating the car wash facility
to the eastern portion of the site, replacing service building "C" with the car wash facility.
Conditioning the developer to comply with this alternative would relocate the auto -related
use with the highest negative visual impact away from the Valencia Boulevard street
frontage. During the Planning Commission meeting of October 18, 1994, the applicant stated
that relocating the car wash facility to the eastern portion of the site would not be financially
appropriate, and would hinder the development of this site to the extent that the construction
of the car wash would be infeasible.
In a letter addressed to staff, the developer cited the following reasons as to why the
aforementioned option is unsuitable: 1). The architecture and landscaping of this center
continue the theme established by the Valencia Town Center and upgrade the Cimema Drive
area, 2). Moving building"C" to the front of the autoplex would decrease the building setback
from Valencia Boulevard to 10'-0", and the setback of 100' to the car wash provides a more
visually pleasing design, 3). Currently, minimal signage is required at the center because
the car wash is a "self-explanatory" use: a large directional sign would be needed on Valencia
Boulevard in order to advertise the auto wash facility, 4). The site is presently designed with
a 4 -foot berm and hedge which screens the front portions of the car wash and enhances the
visual appearance of the site, 5). The buyer and operator of the car wash has previously
stated to the Commission that the business would not be economically viable without frontage
on Valencia Boulevard, 6). The location of the car wash serves as an anchor to attract
customers to the center, enhancing the viability of the other tenants on the site, and 7). The
developer has a proven tract record of successful autoplexs using this basic design with the
car wash to the front of the site, and has worked with City staff to balance aesthetic and
economic considerations.
Two alternatives that staff feels the Planning Commission should explore include:
Approving Master Case 94-112, which consists of Conditional Use Permit
94-004, subject to the modifications submittted by the applicant, including:
a). Modification of eastbound Valencia Boulevard to provide a right
turn pocket and transition lane totaling 180 feet in length,
b). Modification of the original site plan for the addition of a
landscaped buffer area at the Valencia Boulevard access point,
and
c): Modification of the original proposal in order to allow for the
addition of on-site directional signage, encouraging patrons of
the auto -related uses to use the Cinema Drive access point as an
exit; or
Conditioning the applicant to relocate the car wash facility to the eastern
portion of the lot, replacing service building "C" with the auto wash facility, in
addition to requiring the incorporation of the modifications to the site plan
submitted by the applicant.
Staff feels that the Planning Commission should review the changes on the re -submitted site
plan, receive public testimony, and consider the concerns addressed by staff regarding the
negative visual impacts associated with the car wash facility.
RECOMMENDATION:
Staff: recommends that the Planning Commission:
1). Adopt Resolution P94-16, approving Master Case 94-112, which consists of Conditional
Use Permit 94-004, subject to the attached conditions of approval; and
2). Condition the developer to incorporate the following modification:
Relocate the car wash facility to the eastern portion of the lot, replacing service
building "C" with the auto wash facility, and include the incorporation of the
traffic mitigation measures submitted by the applicant as indicated on the
revised site plan.
LMH:JDR
pingcom\rr94-112jdr
RESOLUTION NO. P94-16
A RESOLUTION OF TIIE PLANNING COMMISSION OF THE
CITY OF SANTA CLARITA APPROVING
CONDITIONAL USE PERMIT 94-004
TO ALLOW FOR THE DEVELOPMENT OF A CAR WASH FACILITY
AND OTHER AUTOMOBILE RELATED USES IN A CC (COMMUNITY
COMMERCIAL) ZONE FOR THE PROPERTY LOCATED ADJACENT
TO THE SOUTHWEST CORNER OF VALENCIA BOULEVARD
AND CINEMA DRIVE
(MASTER CASE NO. 94-112)
THE PLANNING COMMISSION OF THE CITY OF SANTA CLARITA DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission does hereby make the following
findings of fact:
a. An application for a conditional use permit was filed on September 20, 1994,
by Cardinal Development / Cressel - Wilcke Partnership (the "applicant"). The
property for which this entitlement has been filed is adjacent to the southwest
corner of Valencia Boulevard and Cinema Drive (Assessor Parcel Numbers
2811-026-006 and 027). The existing zoning and general plan designations for
the property are Community Commercial (CC).
b. The applicant has filed a conditional use permit to allow for the construction
of a 24,866 square foot facility, containing a car wash and other automotive
related uses. The facility consists of four buildings. The maximum height of
the structures is 35'.
c. The property is flat, having been previously graded by the owner of the
property.
d. Access to the site is from Valencia Boulevard and Cinema Drive, both of which
are public streets. Public utilities and services are available to the site.
e. The surrounding land uses include commercial to the north, baseball fields to
the west, commercial vacant land to the east, and the Santa Clara River to the
south.
The project site is approximately 141,121 square feet in size.. Approximately
15,500 square feet of the site would be landscaped. The project would provide
a total of 107 parking spaces.
g. The City of Santa Clarita Development Review Committee met and supplied
the applicant with draft conditions of approval.
h. The project was reviewed pursuant to the provisions of the California
Environmental Quality Act (CEQA). An initial study has been completed for
RESOLUTION NO. P 94-16
PAGE 2
this project and a mitigated negative declaration has been prepared
is A public hearing regarding the project was held by the Planning Commission
on October 18, 1994, at the City Council Chambers, 23920 Valencia Boulevard,
Santa Clarita, at 7:00 p.m. At this meeting, the Planning Commission tabled
the item to a date uncertain, due to the deficient public notification of the
project. The Planning Commission also directed the applicant to redesign the
project to resolve circulation concerns, and directed staff to ensure that proper
notification of the project is completed.
j. A duly noticed public hearing was held by the Planning Commission on
November 15, 1994, at the City Council Chambers, 23920 Valencia Boulevard,
Santa Clarita, at 7:00 p.m.
SECTION 2. Based upon the testimony and other evidence received at the
hearing, and upon the study and investigation made by the Planning Commission and on its
behalf; the Commissionfurther finds as follows:
a. At the hearing of November 15, 1994, the Planning Commission considered the
staff report prepared for this project and received testimony on this proposal.
b. The City's General Plan designation for the project site is Community
Commercial (CC). The project is consistent with this designation with the
inclusion of a conditional use permit.
C. The granting of the conditional use permit will not adversely affect the health,
peace, comfort, or welfare of persons residing or working in the surrounding
area; nor be materially detrimental to the use, enjoyment or valuation of
property of other persons located in the vicinity of the subject property; nor
jeopardize, endanger or otherwise constitute a menace to the public health,
safety or general welfare. The project complies with the requirements of the
Unified Development Code, provides parking and landscaping in excess of
minimal requirements, provides a deceleration lane on Valencia Boulevard and
is orientated in such a manner as to provide adequate on-site circulation.
d. The project will not cause substantial environmental damage to fish or wildlife
because the project is located in a previously developed area.
e. The proposed use will not affect existing circulation; the peace, comfort and
welfare of persons residing in the surrounding area; nor be materially
detrimental to the adjacent uses. The project is located in a commercial area,
and is conditioned to provide traffic mitigation. The proposed structures will
be consistent and compatible with surrounding commercial uses.
f A Mitigated Negative Declaration has been prepared for this project pursuant
to the California Environmental Quality Act (CEQA) (Public Resources Code.
Section 21000 et seq.).
RESOLUTION NO. P 94-16
PAGE 3
SECTION 3. Based upon the foregoing facts and findings, the Planning
Commission hereby determines as follows:
a. The project is compatible with existing development in the area, is consistent
with the City's General Plan, and complies with the standards of the CC zone
with the inclusion of a conditional use permit. The applicant has substantiated
the required findings for the granting of a conditional use permit.
b. The project will not have a significant effect upon the environment.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the
City of Santa Clarita, California, as follows:
a. The Planning Commission hereby approves the Mitigated Negative Declaration
prepared for the project with the finding that, with the inclusion of mitigation
measures, the project will not have a significant effect upon the environment.
b. The Planning Commission hereby approves Conditional Use Permit 94-004 to
allow for the construction of a car wash and other automobile related uses, a
project consisting of four buildings totaling 24,866 square feet, subject to the
attached conditions of approval.
PASSED,
November
ATTEST:
APPROVED AND
127
Lynn/M. Harris
Secretary, Planning Commission
1994.
ADOPTED this 15th day of
Pat Modu o, C rman
Planni Co ission
RESOLUTION NO, P 94-16
PAGE 4
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) §
CITY OF SANTA CLARITA )
I, Donna M. Grindey, City Clerk of the City of Santa Clarita, do hereby certify that
the foregoing Resolution was duly adopted by the Planning Commission of the City of Santa
Clarita at a regular meeting thereof, held on the 15th day of November
1994, by the following vote of the Planning Commission:
AYES: COMMISSIONERS
NOES:- COMMISSIONERS
Modugno, Doughman and Townsley
Brathwaite and Cherrington
ABSENT: COMMISSIONERS: None
pingcem\nx8�16 gee
;fttCLERK
CONDITIONS OF APPROVAL
MASTER CASE NO. 94-112
CONDITIONAL USE PERMIT 94-004
GENERAL CONDITIONS
The approval of this project shall expire if not put into use within two years from the
date of conditional approval, unless it is extended in accordance with the terms and
provisions of the City of Santa Clarita's Unified Development Code.
The applicant may file for an extension of the conditionally approved project prior to
the date of expiration. If such an extension is requested, it must be filed no later than
60 days prior to expiration.
3. The applicant shall be responsible for notifying the Department of Community
Development; in writing, of any change in ownership, designation of a new engineer,
or change in the status of the developer, within 30 days of said change.
4. Unless otherwise apparent from the context, the term "applicant" shall include the
applicant and any other persons, corporation, or other entity making use of this grant.
The applicant shall defend, indemnify, and hold harmless the City of Santa Clarita,
its agents, officers, and employees from any claim, action, or proceeding against the
City or its agents; officers, or employees to attach, set aside, void, or annul the
approval of this Project by the City, which action is provided for in Government Code
Section 66499.37. In the event the City becomes aware of any such claim, action, or
proceeding, the City shall promptly notify the applicant, or if the City fails to
cooperate fully in the defense, the applicant shall not thereafter be responsible to
defend, indemnify, or hold harmless the City. Nothing contained in this Condition
prohibits the City from participating in the defense of any claim, action, or proceeding,
if both of the following occur; 1) The City bears its own attorneys' fees and costs; and
2) the City defends the action in good faith. The applicant shall not be required to
pay or perform any settlement unless the settlement is approved by the applicant.
5. A stop -work order shall be considered in effect at any point in the development
process upon the discovery of any historic artifacts and/or remains, at which time the
City shall be notified.
6. In lieu of establishing the final specific locations of structures on each lot at this time,
the owner, at the time of issuance of building permit, agrees to develop the property
in conformance with the City Code and other appropriate ordinances such as the
Building Code, Plumbing Code; Grading Ordinance, Highway Permit Ordinance,
Mechanical Code, Zoning Ordinance, Undergrounding of Utilities Ordinance, Water
Ordinance, Oak Tree Ordinance, Sanitary Sewer and Industrial Waste Ordinance,
Electrical. Code, Department of Oil and Gas, South Coast Quality Air Management
District, U.S. Army Corps of Engineering, and Fire Code. Improvements and other
requirements may be imposed pursuant to such codes and ordinances,
MASTER CASE NUMBER 94-112
RESOLUTION P94-16
PAGE 2
7. The property shall be developed and maintained in substantial conformance with the
approvals granted by the City. Any modifications shall be subject to further review
by the City.
8. The Sanitation Districts are empowered by the California Health and Safety Code, to
charge a fee for the privilege of connecting to the Sanitation Districts' Sewerage
System. A connection fee is required so that necessary expansions to the Sewerage
System can be constructed to accommodate new development_ Payment of a
connection fee will be required before a permit to connect to the sewer is issued.
FIRE DEPARTMENT
Provide and indicate on the site plan Fire Department access or vehicular turn -around
in accordance with specifications below:
a. Provide a minimum, unobstructed width of 26 feet clear to sky, and vehicular
access to within 150 feet of all portions of the exterior walls.
Post "No Parking - Fire Lane" signs along vehicular access roads.
10. The required fire flow for public fire hydrants at this location is 2,000 gallons per
minute at 20 psi for a duration of 2 hours, over and above maximum daily domestic
demand. This shall include the possible installation of one public hydrant and the
possible upgrade of one additional hydrant to the satisfaction of the Fire Department.
11. All hydrants shall measure 6"x 4" x 2 1/2", brass or bronze, conforming to current
AWWA Standard C503, or approved equal. Hydrants shall be installed per
specifications of the Los Angeles County Water Ordinance No. 7834 (Title 20) (Utility
Manual, Section 4,0 to 4.6).
12. All required public fire hydrants shall be installed, tested and accepted prior to
construction.
13. Vehicular access must be provided and maintained serviceable throughout
construction.
14. The applicant shall complete and return the "Water Availability" form.
ENGINEERING
15. The applicant shall place above -ground utilities, outside sidewalks, or provide a
minimum of four feet clear path of travel along sidewalks,
16. The applicant, by agreement with the City Engineer, may guarantee installation of
improvements as determined by the City Engineer through faithful performance
MASTER CASE NUMBER 94-112
RESOLUTION P94-16
PAGE 3
bonds, letters of credit or any other acceptable means
17. The applicant shall repair any broken or damaged curb, gutter, sidewalk and
pavement on streets within or abutting the project, and shall replace driveways to be
abandoned with standard curb, gutter, and sidewalk.
18. The applicant shall install separate house laterals to serve each building in the
project, Installation and dedication of main line sewers may be necessary to meet this
requirement. Applicable sewer connection fees shall be paid prior to building permit
issuance.
19. The applicant shall submit grading and drainage plans and necessary support
documents to comply with Engineering requirements. These must be approved to the
satisfaction of the Community Development Department.
20. Driveways shall be constructed using the City of Santa Clarita alley intersection
design #101-0 type C. The applicant shall obtain approval from the traffic engineer
for the location of all driveways.
TRAFFIC ENGINEERING
21. Prior to occupancy, the applicant shall modify eastbound Valencia Boulevard to allow
for a 180 foot long right turn deceleration lane to the satisfaction of the Director of
Community Development.
PARKS AND RECREATION DEPARTMENT
22. The applicant shall provide street trees to the satisfaction of the Parks and Recreation
Department. The applicant shall use trees from the City's approved Master Street
Tree List, which can be obtained from the City Arborist. The irrigation and
maintenance of these trees shall be per Ordinance 90-15.
23. The applicant shall provide final landscape and irrigation plans for review and to the
satisfaction of the Parks and Recreation Department. Drought resistant plants and
water efficient irrigation systems shall be utilized in the design.
24. The applicant shall provide bike racks and an area for said racks to the satisfaction
of the Parks and Recreation Department.
PLANNING DIVISION
25, The wash rack and any other enclosed work space shall be constructed and arranged
so that entrances, exits and openings therein shall not face any property in any
residential zone, or shall be adequately screened and noise buffered from the
residential zone.
MASTER CASE NUMBER 94-112
RESOLUTION P94-16
PAGE 4
26. Servicing of motor vehicles, other than cleaning; polishing and the dispensing of fuel
and oil shall not be included as a part of the car wash operations,. unless the facility
also meets all requirements for a service station.
27. Wash and rinse water shall be fully reclaimed and recirculated at the full service car
wash. Additional non -reclaimed water required to account for losses due to
evaporation, water carried out on vehicles as a result of their having been washed,
and similar losses is permitted. The reclamation and recirculation system shall be:
designed by a professional engineer registered in the State of California to practice in
the field of mechanical engineering. The applicant shall be required to comply with
all Federal NPDES regulations regarding the discharge of waste waters and
pollutants.
28. Provisions shall be made to prevent area water from the site from flowing over any
public sidewalk.
29. Public restrooms shall be provided.
30. Prior to the issuance of building permits the applicant shall submit final architectural
elevations and a materials board to the Community Development Department for
review and approval. The elevations shall be in substantial conformance with those
approved by the Planning Commission.
31. Prior to the issuance of building permits, the applicant shall submit a lighting plan
to the satisfaction of the Community Development Department, All project sighting
shall be directed away from any adjacent residential properties.
32. The applicant shall pay the appropriate school fees in effect at the time of building
permit issuance to the satisfaction of the. Building Official.
33. The applicant shall comply with all Building and Safety, and Engineering Division
requirements.
34. The property shall be developed and maintained in substantial conformance with the
approved Conditional Use Permit.
35. It is hereby declared and made a condition of this permit that if any condition hereof
is violated, or if any law, statute, or ordinance is violated, the permit shall be
suspended and the privileges granted hereunder shall lapse; provided that the
applicant has been given written notice to cease such violation and has failed to do so
for a period of 30 days.
36. This grant shall not be effective for any purpose until the permittee and the owner of
the property involved have filed, with the Community Development Department, their
affidavit stating that they are aware of, and agree to accept, all conditions of this
MASTER CASE NUMBER 94-112
RESOLUTION P94-16
PAGE 5
grant.
37. The applicant shall provide a signage program for the center to the satisfaction of the
Director of Community Development. This plan shall include provisions for on-site
directional signage to encourage the use of the Cinema Drive access point.
PLANNING COMMISSION
38. The applicant shall increase the landscaped setback area along Valencia Boulevard
by 10'-0", increasing the setback area to a total width of 20'-0".
39. The applicant shall relocate the freestanding convenience gas island pumps 10'-0"
farther north on the project site, and shall eliminate 10'-0" of the building area of
service building "D" in order to accommodate the relocated gas island pumps.
40. The applicant shall maintain a 40'-0" drive aisle width between service building "A"
and the freestanding convenience gas island pumps.
FLF
sura"f�m�san2�.nr
CITY OF SANTA CLARITA
STAFF REPORT
MASTER CASE NO. 94-112
CONDITIONAL USE PERMIT 94-004
DATE: October 18, 1994
TO: Chairman Modugno and Members of the Planning Commission
FROM: Lynn M. Harris, Deputy City Manager, Community Development
CASE PLANNER: Jennifer Reid, Planning Technician
APPLICANT: Cardinal Development / Cressel-Wilcke Partnership
LOCATION: Adjacent to the southwest corner of Valencia Boulevard and Cinema
Drive. Assessor's Parcel Nos. 2811-026-006 & 027.
REQUEST: A conditional use permit request to allow for the development of a car
wash facility in the CC (Community Commercial) zone. The applicant
is also proposing to develop the site with other automobile -related
service businesses. Included in the applicant's proposal for auto -related
services are tire sales and a quick lube service.
BACKGROUND
On September 20, 1994, Cardinal Development and the Cressel-Wilcke Partnership filed,
with the City of Santa Clarita, for a development review and conditional use permit for a car
wash facility in the CC (Community Commercial) zone. Along with the applicant's request
for a car wash are other auto -related service businesses. According to Section 17.13.050 of
the Unified Development Code, car wash facilities are a permitted use in the CC zone with
the inclusion of an approved conditional use permit. The applicant has also proposed tire
sales, which require a minor use permit, and a quick lube auto service business as additional
auto -related establishments.
PROJECT DESCRIPTION
The applicant would be developing on a 3.3 acre site. The project would provide a total of 113
on-site parking spaces, 23 more than the required 90 spaces. Approximately 15,505 square
feet of the site would be landscaped, which exceeds the 5% landscaped parking area
requirement specified by the Unified Development Code. The property has been recently
graded, thus the topography of the site is flat. Access to the site is proposed off of Valencia
Boulevard and Cinema Drive. The parcels were created with Vesting Tentative Parcel Map
22010 which recorded in 1991.
Four buildings are proposed, with a total floor area of 24,866 square feet. Building "A" is
proposed at 2785 square feet, and would function as a quick lube servicing facility. Building
"B" is proposed at 7850 square feet, and would be utilized for general automobile servicing.
Building "C" is proposed at 9350 square feet, and would contain the tire service center. This
building would also house other general automobile retail and service oriented businesses.
Building "D" is proposed at 4878 square feet and would be utilized as the car wash facility.
All proposed buildings are two story structures with a height of 35'-0". The maximum height
of any structure in the CC zone is two stories or 35'-0", thus the proposed structures are in
compliance with the Unified Development Code. Setbacks for the property include a 10'-0"
landscaped setback area along Valencia Boulevard, and a 5'-0" landscaped setback area along
Cinema Drive. A minimum drive aisle dimension of 26'-0" has been provided for throughout
the property.
The applicant has oriented three of the proposed buildings away from the Valencia Boulevard
street frontage, Building "C" is proposed with frontage orienting towards the boulevard and
is set back approximately 380 feet from Valencia Boulevard.
The queuing area for the quick lube service is located behind building "A". Furthermore, all
servicing of vehicles from this facility will be conducted from a subterranean work area, in
contrast to the more customary method of elevating cars on hydraulic jacks for servicing. The
applicant has also proposed that the drying area for vehicles exiting the car wash facility be
located at the westernmost portion of the lot, near Valencia Boulevard. In order to mitigate
the potential negative visual impacts associated with the auto -related services, the applicant
has proposed berming the landscaped area along the Valencia Boulevard street frontage.
GENERAL PLAN DESIGNATION. SURROUNDING LAND USE, ZONING
The site is presently zoned CC (Community Commercial). The following table sets forth
information as it pertains to the project site and surrounding areas, including planning
categories, zoning, and land use designations:
General Plan Zoning Land Use
Project CC CC Vacant
North CC CC Existing commercial use, adjacent
to undeveloped land
South CC CC South Fork of the Santa Clara
River, undeveloped land, and
electrical transmission lines
West
(unincorporated land)
East CC CC
William S. Hart baseball fields (Los
Angeles County)
Commercial property currently
under development
ENVIRONMENTAL STATUS
As part of the project review, an environmental assessment was made to evaluate the impacts
of the project. It was determined that the adverse environmental impacts could be avoided
with- mitigation measures. Subsequently, a draft mitigated negative declaration was
prepared for the project.
INTERDEPARTMENT/INTERAGENCY REVIEW
The project has been distributed to the affected City Departments and agencies.
Subsequently, the Community Development Department has received comments and has
recommended conditions accordingly. Certain requirements and comments have been
included as mitigation measures to environmental impacts.
ANALYSIS
The project site is zoned CC (Community Commercial), which corresponds to retailing and
service uses of a community -wide nature that attract people from beyond the immediate
neighborhood. This zone typically includes at least one or two major users and should not
be construed to be an allowance for a proliferation of small, multi -tenant convenience
commercial centers located on corners and in strip commercial fashion along the City's
commercial streets.
General auto -related service businesses are permitted in the CC (Community Commercial)
zone. The applicant's request for tire sales, though, requires the granting of a minor use
permit. All adjacent property owners were notified of the applicant's request to allow for on-
site tire sales. The Department of Community Development has not received any written
opposition to this request, thus the Director will approve the applicant's request for a minor
use permit on Wednesday, October 18, 1994, unless specifically directed otherwise by the
Planning Commission.
A car wash is a permitted use in the CC (Community Commercial) zone with an approved
conditional use permit. According to the General Plan, the project is located in the
Office/Financial Corridor of the Valley Center. This component of the Valley Center concept
is seen as linking the Retail and Civic Center / Entertainment / Information components into
a unified and cohesive corridor running along Valencia Boulevard and Soledad Canyon Road.
The General Plan states that retail and service businesses should serve as a secondary, or
support relationship to the Offices and Financial institutions of the Office/Financial Corridor.
Staff believes that the Planning Commission could make a finding that, at present, the use
is consistent with the General Plan.
Staff has reviewed the proposal and has expressed concern about the site's design with regard
to the safety of vehicular traffic along Valencia Boulevard. As presently designed, the site's
main access point is off of Valencia Boulevard, a major street in which the average speed of
traffic is 45-50 miles per hour. The Traffic Engineering Section prefers the developer to
provide a right turn pocket with a deceleration lane along Valencia Boulevard, in order to
accommodate the traffic that would be turning into the project site. General Plan Goal 1.20
of the Circulation Element states that the City should, "Develop design standards for
roadway and intersection improvements to safely and efficiently accommodate existing and
projected traffic patterns and circulation."
The applicant has hired Austin -Foust, Associates, Inc., a traffic engineering and
transportation planning group, to analyze trip generation patterns generated by the project.
According to Austin -Foust Associates, Inc., the proposed project will create a demand for 85
entering trips during the typical weekday PM peak hour, 60 of which will make right turns
from Valencia Boulevard. The car wash itself will generate approximately 30 of the entering
trips from Valencia Boulevard. By way of comparison, a typical retail use on this property
would create two and a half times as many total right turns. A copy of the trip generation
rates, provided by Austin -Foust Associates, Inc., is included for your reference.
Design options are available that have the potential to divert traffic away from the Valencia
Boulevard access, to the Cinema Drive access, in lieu of conditioning the applicant to provide
the right turn pocket and deceleration lane. One of the design options available is to relocate
the car wash to the eastern portion of the lot, replacing the proposed service building "C"
with the auto wash facility. This option would encourage patrons of the auto -related service
businesses to utilize Cinema Drive more frequently for both ingress and egress on to the
property. This option would also move the car wash and its related activities farther away
from the Valencia Boulevard street frontage. The applicant has stated that locating the car
wash to the rear of the site would not be appropriate financially.
A second design option available is to reverse the traffic flow and queuing area of the car
wash. This option would require that the car wash facility be relocated farther away from
the Valencia Boulevard street frontage, but would allow the facility to remain in
approximately the same location as is currently proposed. This design option would also
require that the gas station and vacuum canopies be relocated to the west entrance of the car
wash facility, with the freestanding gas island pumps being shifted slightly farther to the
east on the project site. By reversing the traffic flow through the car wash facility, traffic
congestion at the Valencia Boulevard access point would be decreased, and the drying area
would be located away from the street frontage. As currently proposed, traffic from the quick
lube facility, vehicles from the car wash, and normal vehicular traffic entering and exiting
the site converge in a singular area in front of the Valencia Boulevard access point.
RECOMMENDATION
Staff recommends that the Planning Commission;
1) Direct the applicant to modify the site plan with one of the following options:
a. Relocate the car wash facility to the eastern portion of the lot, replacing service
building "C" with the auto wash facility; or
b. Reverse the traffic flow and queuing area of the car wash, relocating the
facility farther to the east, repositioning the gas station and vacuum canopies
to the western entrance of the facility, and shifting the freestanding gas island
pumps farther east on the subject site; and
2) Directthe applicant to return to the Planning Commission with the modified site plan
for further consideration.
LMH:JDR
p1ngom\sr94-112jdr
BURTON $. LEVINSON
LAWRENCE R. LIEBERMAN
FRANCIS S, MAAS
PATRICIA M. SNYBERT
NANCY E. MARCUS
PETER M. HEBERT•
SHOSHANA B. BOTNICK••
THERESA A COGHLANH
BRANDON L KIRK
LEVINSON & LIEBERMAN
A PROFESSIONAL CORPORATION
9401 WILSHIRE BOULEVARD. SUITE 1250
BEVERLY HILLS. CALIFORNIA 9 0 212-2 9 9 7
TELEPHONE (310) 550-0500
FACSIMILE (310) 959-3949
November 14, 1994
City of Santa Clarita
23920 Valencia Boulevard
Santa Clarita, California 91355-2175
Attn.: Planning Commission
Re: Planning Commission Meeting,
November 15, 1994
AL O MEMBER
'ARI20NA AND WASHINGTON BARS
1 OLORAOO BAR
'•IW NOI$ BAR
11N YORK BAR
PLEASE REFER TO
OUR FILE NO,
Dear Honorable Members of the Santa Clarita Planning Commission:
This office represents Valencia Car Wash. I am writing
concerning Item 4 on the calendar for November 15, 1994, the
application of Cardinal Development/Cressel-Wilcke Partnership.
Both my client and I spoke at the prior meeting where various
members of the Commission expressed extreme reservations about.
the need or desirability of another car wash in Santa Clarita and
also of equal concern the traffic problems which would be created
by the proposed development.
I have spoken with various adjoining property owners and
their counsel who, likewise, have serious concerns about traffic.
Additionally, I have reviewed the CC&R's which are in place for
this property as well as those which burden the Valencia Car
Wash. I believe that a very credible argument could be made that
there could be a violation of those CC&R's should Newhall Land
and Development approve this plan. Specifically, there could be
a violation of certain implied conditions dealing with
competition when the CC&R's on my client's property are read in
conjunction with the CC&R's on the applicant's property. While
this may not be a direct concern of the Planning Commission, we
are putting the applicant and Newhall Land on notice of this
potential violation.
LEVINSON & LIEBERMAN
A PROFESSIONAL CORPORATION
City of Santa Clarita
November 14, 1994
Page 2
We would respectfully suggest that the application should be
denied.
Sincerely yours,y�
C/
Lawrence R. Lieberman
LRL/cmk
cc: Cardinal Development
Newhall Land
ROBERTS: ACKERMAN
RICHARD A CORLETO.
JAMES. D (YEARN
VIA FEDERAL EXPRESS
CORLETO & ACKEItMAN
ATTORNEYS AT LAW
15760. VENTURA-BOULEVARD, SUITE 601
ENCINO. CALIFORNIA 91436
October 13, 1994
Ms. Jennifer Reid, Project Planner
City of Santa Clarita
Department of Community Development
23920 Valencia Boulevard
Third Floor
Santa Clarita, California 91355
Dear Ms. Reid:
TELEPHONE
I6181 907-6677
FACSIMILE
16161 990-1965
Our office represents the Las Palmas Land Company ("Las
Palmas") which is the owner of that certain real property located
at '23415 Cinema Center Drive, Valencia, California, on which
there currently exists a Mann Cinema complex. Las Palmas has
provided our office with your notice of Public Hearing relating
to the development of the southwest corner of Valencia Boulevard
and Cinema Drive with four structures to be constructed and used
for automotive servicing (Master Case 94-112; Conditional Use
Permit 94-004). The property is across from my client's complex.
Accordingly, the purpose of this letter is to formally
object, on behalf of our client, to such development. This
objection is based, in large part, on our client's fear that such
use may lead to the contamination of the subject and surrounding
properties by "Hazardous Substances" (i.e., contaminants such as
oil, gasoline, cleaning fluids, etc.) or that a contamination of
the groundwater may occur as a result of such use. They are also
concerned with the current density of the neighborhood and the
excess traffic which will be generated by such use. They do not
believe that the site chosen by the applicant is proper for the
use proposed.
Neither our client or a representative from our office will
be attending the hearing scheduled for October 17. However, we
would like to lodge this objection to the contemplated granting
of the Conditional Use Permit on behalf of our client. In doing
so, we reserve any and all rights available to our client regard-
ing such proposed land use.
1:A1adjem\Reid.ttr
Agenda Item:__(_
Ms. Jennifer Reid
October 13, 1994
Page 2
Further, this letter is not intended and shall not be deemed i
represent a waiver of any rights or remedies of our client,
whether at law or in equity, all of which are expressly resern
JDH:lr
cc: Richard A. Corleto, Esq.
IW ad! W\Rei d. it r
Sincerely,
b -M -a-- t
�AidES D. HEARN
Valencia War Vash
October 14, 1994
Planning Commission
City of Santa Clarita
23920 Valencia Blvd.
Santa Clarita, CA
Dear Commissioners:
OCT 1710
We understand Item 4 on your Agenda for your October 18th
meeting is the request for a conditional use permit to build a
car wash at Valencia Blvd. and Cinema Drive.
This letter is in formal protest to the proposal to add a fourth
car wash approximately in a one mile radius from where we.
operate our business. Our location, together with the car
washes operated by Arco and Unocal, are more than sufficient
to serve this area. A fourth car wash --about one-half mile
from the from each of these locations --would jeopardize our
businesses and conflict with the Commission's plans for logical
growth in the area.
When we began doing business in Santa Clarita seven years ago,
we had first considered a variety of other locations. We were
impressed with Valencia's commitment to controlled growth
and a plan for quality living. We were confident our business
would grow in the community; and the City would hold firm to
its commitment to a logical business plan within our area. As
the years passed, you have held true to this commitment. Other
communities have caved in to outside pressures and have paid
the price in later years. I commend every member of the
Commission for not only protecting the integrity of Santa
Clarita, but for enhancing its value.
Agenda Item: _�_
24233 Creekside Road Valencia, CA 91355 (805) 255-3448
Planning Commission
October 14, 1994
It is for this reason that we are particularly distraught with
the recent proposal to add a fourth car wash with a one mile
proximity. When a third car wash began doing business about
one month ago, we did not protest. After all, our belief in the
free enterprise holds strong. We encourage healthy competition
in the area. This recent proposal, however is an outrage.
In closing, we urge the Planning Commission to deny the
proposal for a fourth car wash. This community's reputation is
built on integrity, intelligence, and a strong commitment to
quality. To entertain the possibility of an additional car wash
denies all of these principles.
Sincerely,
9M U
Jeffrey Paul
General Partner