HomeMy WebLinkAbout1996-06-11 - AGENDA REPORTS - APPLICATION SLTPP (2)r'11 &' City Manager Approval Item to be presented by: Steve Stark CONSENT CALENDAR DATE: June 11, 1996 SUBJECT: APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROJECTS Resolution No. 96-76 DEPARTMENT: Administrative Services Caltrans is currently accepting project applications for the eighth cycle of the State -Local Transportation Partnership Program (SLTPP). The SLTPP is a state sponsored program designed to encourage local agencies to support roadway improvements with funds other than gas tax or developer contributions. Eligible projects must be locally constructed on a local road, a State highway, or an exclusive mass transit guideway. The completed project must either increase capacity, extend service to a new area, or extend useful life of the roadway a minimum of ten years. Only contract and construction engineering costs are eligible for reimbursement under this program. The percentage of reimbursement for this program is dependent upon the number of approved projects statewide. It is expected that Cycle 8 reimbursements will be between 3.5 and 19 percent of the actual project contract costs. As a procedural matter, Caltrans requires that the City Council approve the submission of potential projects for the program. Staff recommends that the following projects be selected for consideration: 1. Valencia Boulevard - I-5 to McBean Parkway - Overlay 2. Sierra Highway - Soledad Canyon to San Fernando Road - Interconnect 3. Bouquet Canyon - Magic Mountain to Plum Canyon - Interconnect Seco Canyon - Bouquet Canyon to Copper Hill - Interconnect Adapted: �- 1 /-qAgenda item:_ 9 RESOLUTION NO. 96-76 June 11, 1996 - Page 2 4. Sierra Highway - San Fernando Road to Soledad Canyon - Restripe 5. Bouquet Canyon - Plum Canyon to North City limits - Overlay 6. Valley Street - Lyons Avenue to 8th Street - Overlay 7. Calgrove - I-5 to 600' W/O Wiley Canyon - Overlay 8. Soledad Canyon - Miss Grace to Sand Canyon - Overlay 9. Orchard Village McBean Parkway to Lyons Avenue - Overlay 10. Valencia Boulevard and Soledad Canyon - Creekside Drive to Commuter Way - Bikeway RECOMMENDATION Adopt Resolution No. 96-76, and authorize the City Engineer to submit these projects to Caltrans for consideration. ATTACHMENT Resolution No. 96-76 Applications are in the Council Reading file in the City Clerk's Office RGN:CMR:hds ..61%res%-76.e RESOLUTION NO. 96-76 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA APPROVING FORMAL APPLICATION FOR CYCLE 8 STATE/LOCAL TRANSPORTATION PARTNERSHIP PROJECTS WHEREAS, the California State Legislature has authorized the State/Local Transportation Partnership Program to identify and construct locally supported transportation projects; and WHEREAS, the adopted procedures established by the State of California Department of Transportation require the applicant to certify the City Council's approval by resolution prior to submission of applications to the Department of Transportation: and WHEREAS, the City Council of the City of Santa Clarita hereby resolves as follows: SECTION 1. The City Engineer is authorized to submit appropriate transportation projects for consideration of grant funding. SECTION 2. The City Council certifies that the City of Santa Clarita understands the assurances and certifications contained in the applications. SECTION 3. The City Council supports the following transportation projects for SLTPP funding cycle 8 and endorses the application submittal for: 1. Valencia Boulevard - I-5 to McBean Parkway - Overlay 2. Sierra Highway - Soledad Canyon to San Fernando Road - Interconnect 3, Bouquet Canyon - Magic Mountain to Plum Canyon -Interconnect Seco Canyon - Bouquet Canyon to Copper Hill - Interconnect 4. Sierra Highway - San Fernando Road to Soledad Canyon - Restripe 5. Bouquet Canyon - Plum Canyon to North City limits - Overlay 6. Valley Street - Lyons Avenue to 8th Street - Overlay 7. Calgrove - I-5 to 600'W/0 Wiley Canyon - Overlay 8. Soledad Canyon - Miss Grace to Sand Canyon - Overlay 9. Orchard Village - McBean Parkway to Lyons Avenue - Overlay 10, Valencia Boulevard and Soledad Canyon - Creekside Drive to Commuter Way - Bikeway RESOLUTION NO. 96-76 June 11, 1996 - Page 2 PASSED, APPROVED AND ADOPTED this 19 MAYOR ATTEST: CITY CLERK STATE OF CALIFORNIA COUNTY OF LOS ANGELES CITY OF SANTA CLARITA day of I, Donna M. Grindey, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the day of 19_ by the following vote of Council: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: CITY CLERK RGN:CMR:hds m 61\ree6&76.c EXHYRI T A (APP.05) (PAGE 1 OF 2) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUND Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD.. SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Phone: 805-255-4963 Expenditure Authorization (EA): Project Planning Number: State Administered Project []Yes ®No Transit Project Yes ®No Caltrans District: 7 State Route: N/A State Highway []Yes ®No Staged Project []Yes ®No County: LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: Valencia Boulevard from I-5 to McBean Parkway Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 600,400 A (B) Less Ineligible Amount (Contract Items) $ ( (C) Total Eligible Amount = A - B $ 600,400 (D) Maximum State Share = 0.5 x (C) $ 300,200 'c: \monim \clepp\altppl.npp .hed I C u EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUND Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+1) = 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: Al�✓A4 -,l Sill Signature: Attachments: Location Map, Typical Cross -Section, Engineers Estimate e Annie.\.ltpp% .Ifpplapp .heel 2 Date: Q ry p > U (] U OP 4S U Z O m Ll Mp OEAN z 31 N0 d R Q d � o GS 7 S S u sm CANYON 0 U s 1 V U K} F Z .. 0 RO FP��,HPY / a`"A spa 5S P� pp10EN � Z U O wF —�� 0 Q Ov �o R; W VARIES R/W VARIES g' 8, COLD MILL COLD MILL LIMITS LIMITS EXISTING �- JI SURFACE PAVING FABRIC OR S.A.M.I. WHERE REQUIRED 1-1/2" TO 2" THICK ASPHALT RUBBER HOT MIX TYPICAL SECTION N. T. S. NOTE1 THE ROADWAY CROSS-SECTION AND EXTENT OF REPAIR AND RECONSTRUCTION IS PRELIMINARY IN NATURE. THE FINAL DESIGN CROSS-SECTION, EXTENT OF R & R, MEDIANS, AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN Part A - Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Valencia Blvd. from the 1-5 to McBean Parkway Description of Work: Street Overlay Length: 5,252 feet Item Description Unit Quantity Unit Price Extended Amount Asphalt -Rubber Hot Mix (ARHb TON 4,600 $ 75.00 $ 345,000 Paving Fabric (or SAMI) SY 41,000 1.50 61,500 Cold Milling SF 250,000 0.50 125,000 Adjust Manhole EA 25 350.00 8,750 Adjust Pull/Meter Boxes EA 15 300.00 4,500 Project Signs EA 6 500.00 3,000 Traffic Control Plan LS 100% 2,500.00 2,500 Traffic Loop Detectors EA 20 350.00 7,000 Painted Lane Line Striping LF 5,000 0.70 3,500 Turn Arrows EA 6 150.00 900 Raised Pavement Markers LF 25,000 0.75 18,750 Construct Curb Ramps EA 10 2,000.00 20,000 Subtotal Contract Items $ 600,400 sltpp.X1S sheet4 EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I- Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355' Contact Person: Anthony J. Nisich, City Engineer Phone: 805-255-4963 Expenditure Authorization (EA): Project Planning Number State Administered Project Transit Project Caltrans District: 7 ❑ Yes ® No []Yes [NNo State Highway Staged Project County: E]Yes ®No []Yes ®No LOS ANGELES State Route: N/A Post Mile Limits: N/A to N/A Project Location / Limits: SIERRA HIGHWAY FROM SOLEDAD CANYON ROAD TO SAN FERNANDO ROAD Type of Work: TRAFFIC SIGNAL INTERCONNECT Source of Local Share Funds: TDA Justification of Project: To improve the mobility of vehicles, improve access and relieve congestion in the area. Part II: Project Costs (A) Contract Items $ 300,000 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B $ 300,000 C (D) Maximum State Share = 6.5 x (C) $ 150,000 D c: Vmonimisf[pp\.aurroti.aDD sheet ! EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 50 50 100 199X/199(X+1) = 1998/1999 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: 1' pc—kr / _(,)✓!5 /tsi (l ✓� E,v�j/N�f✓� Signature: Attachments: Location Map, Typical Cross -Section, Engineer's Estimate c' \manim \a8pp4ie�rati.aPP duet 2 Date: Part VI - Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Sierra Highway From Soledad Canyon Road to San Fernando Road (SR -126) Description of Work: Traffic Signal Interconnect Length: Subtotal Contract Items $300,000 RGN:lkl eng-civi\engestrgn Unit Extended Item Description Unit Quantity Price Amount Conduit Cable Installation LF 15,000 $15.00 $225,000 Miscellaneous LS 75,000 Subtotal Contract Items $300,000 RGN:lkl eng-civi\engestrgn PROJECT LOCATION MAP SIERRA HIGHWAY/STATE ROUTE 14 CONGESTED CORRIDOR INTERCONNECT LL .o v�v MATCH UNE -SEE LEFT N O Jfy� �f lli� y MATCH UNE - SEE RIGHT LEGEND: ` O - EXISTING TRAFFIC SIGNALS- �^p - PROPOSED INTERCONNECT EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: Address: CITY OF SANTA CLARITA 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA. CA 91355 Contact Person: Anthony J. Nisich, City Engineer Expenditure Authorization (EA): State Administered Project E]Yes [NNo Transit Project Caltrans District: State Route: N/A E]Yes [NNo 7 Phone: 805-255-4963 Project Planning Number: State Highway F]Yes [NNo Staged Project E]Yes ®No County: LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: Bouquet Canyon Road from Magic Mountain Parkway to Plum Canyon Road and Seco Canyon Road from Bouquet Canyon Road and Copper Hill Road.. Type of Work: TRAFFIC SIGNAL INTERCONNECT Source of Local Share Funds: TDA Justification of Project: To improve the mobility of vehicles, improve access and relieve congestion congestion in the area. Part II: Proiect Costs (A) Contract Items $ 530,000 A (B) Less Ineligible Amount (Contract Items) $ ( ) B (C) Total Eligible Amount = A - B $ 530,000 C (D) Maximum State Share = 0.5 x (C) $ 265,000 D e\rnonim Is(rpo ��gs<Fa�rP sheet I EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 50 50 100 199X/199(X+1) = 1998/1999 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: ?,oBFpr A4tiiw,4AI A Signature: Attachments: Location Map, Typical Cross -Section, Engineer's Estimate CN r mw\eapp\Wo ftmapp &&Kf2 Date: Part VI - Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Bouquet Canyon Road from Magic Mountain Parkway to Plum Canyon Road and Seco Canyon Road from Bouquet Canyon Road and Copper Hill Road Description of Work: Traffic Signal Interconnect Length: Subtotal Contract Items $530,000 RGN:IkI eng-cMN engeSt Tg Unit Extended Item Description Unit Quantity Price Amount Conduit Cable Installation LF 30,000 $15.00 $450,000 Miscellaneous LS 80,000 Subtotal Contract Items $530,000 RGN:IkI eng-cMN engeSt Tg PROJECT LOCATION MAP NORTH/SOUTH METROLINK FEEDER CORRIDOR INTERCONNECT AT�61 t�, ` `j� a - 1 w / Y I f LEGEND: O - EXISTING 'TRAFFIC SIGNALS \ - PROPOSED INTERCONNECT EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Expenditure Authorization (EA): State Administered Project Transit Project Caltrans District: State Route: I 7 []Yes ®No []Yes [NNo Phone: 805-255-4963 Project Planning Number: State Highway Staged Project County: E]Yes [NNo E]Yes ®No LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: SIERRA HIGHWAY FROM SAN FERNADO ROAD TO SOLEDAD CANYON ROAD Type of Work: Restriping from four to six lanes of travel, modification of catch basins, signing, standardizing traffic signals. Source of Local Share Funds: MTA Grant and Local Funds Justification of Project: This project is a regional corridor, and it parallels the State Route 14, which is in the CMP Network and considered in the MTA's Congested Corridors. This project will reduce delays, noise, and pollution which are the goals of the Air Quality Management Program. Part II: Project Costs (A) Contract Items $ 438,000 A (B) Less Ineligible Amount (Contract Items) $ ( (C) Total Eligible Amount = A - B (D) Maximum State Share = 0.5 x (C) c: \maxum\a!lpplakrropp.:(a rheet 7 $ 438,000 C $ 219,000 D ENGINEER'S ESTIMATE To be used as a basis for computation of State -Local Transportation Partnership Program Funds. Project Title: Sierra Highway Restripe from San Fernando Road to Soledad Canyon Road Description of Work: Restripe Sierra Highway from four to six lanes of travel, modification catch basins, signing, standardizing traffic signals, installing new traffic signal loops, median nose modifications at intersections, and construct bus turnouts. Length: Five miles ITEM ESTIMATE ITEM$ ITEM DESCRIPTION I INTT AMOUNT 001 Signing and Striping Lump Sum $120,000 002 Traffic Signal Modification Lump Sum $140,000 Traffic Signal Loops 003 Median Modifications Lump Sum $140,000 Catch Basin Modifications 004 Bus Turnouts Lump Sum $38,000 Total $438,000 EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 50 50 100 199X/199(X+l) = 1998/1999 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: t— 414-1mA/i✓ Signature: Ctv'n E,11(—iA14kt_ Attachments: Location Map, Typical Cross -Section, Engineer's Estimate ' N.. %,Ltpp \ aiermpp.:la sheet 2 Date: 1A -O& 1 I I • �+ ® Proposed bridge widening — - - 1). Santa Clarita River 2). Railroad Proposed Traffic Signal Interconnect �� �. Proposed 6 Lanes Striping EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD.. SUITE SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Expenditure Authorization (EA): State Administered Project Transit Project Caltrans District: State Route: N/A E]Yes ®No E]Yes [NNo Phone: 805-255-4963 Project Planning Number: State Highway Staged Project []Yes ®No E]Yes ®No 7 County: LOS ANGELES Post Mile Limits: N/A to N/A Project Location/ Limits: Bouquet Canyon Road from Plum Canyon Road to North City Limits Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 104,745 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B (D) Maximum State Share = 0.5 x (C) aNMnimWepp\eifPPs PP ghee[ ] $ 104,745 C $ 52,373 D EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSIIIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+1)= 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: L>o/3FrZT �(%u rt11 Signature: Attachments: Location Map, Typical Cross -Section, Engineer's Estimate ,%M.ni.%,Up, Wfpp�p, eheel2 Date: JEN • r.,. .ODD ..... AY .. - SUSA • .. Of C) CIR .,S;l -. ., . PROJECT .0, RJW VARIES VARIES 8' 8' COLD MILL LIMITS COLD MILL LIMITS I EXISTING SURFACE PAVING FABRIC OR S. A.M.L WHERE REQUIRED 1-1/2" TO 2" THICK ASPHALT RUBBER HOT MIX TYPICAL SECTION N. T. S. NOTE THE ROADWAY CROSS-SECTION AND EXTENT OF REPAIR AND RECONSTRUCTION IS PRELIMINARY IN NATURE, THE FINAL DESIGN CROSS-SECTION, EXTENT OF R & R„ MEDIANS, AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN. R/W Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Bouquet Canyon Road from Plum Cyn Rd to North City Limits Description of Work:. Street Overlay Length: 5152 feet Item Description Unit Quantit Unit Price Extended Amount Asphalt -Rubber Hot Mix (ARID TON 773 $ 55.00 $ 42,515 Cold Milling SP 82,432 0.30 24,730 Adjust Manhole EA 15 400.00 6,000 Adjust Pull/Meter Boxes EA 10 250.00 2,500 Project Signs EA 2 500.00 1,000 Traffic Control Plan LS 100% 1,500.00 1,500 Traffic Loop Detectors EA 10 350.00 3,500 Signing & Striping LS 3,000 1.00 3,000 Construct Curb Ramps EA 10 2,000.00 20,000 Subtotal Contract Items a4nonkaLsltopkyrled est sheet? $ 104,745 EXHIBIT A (APP.05) (PAGE 1 OF 2) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA - Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Phone: 805-255-4963 Expenditure Authorization (EA): Project Planning Number: State Administered Project E]Yes ®No State Highway []Yes No Transit Project []Yes [NNo Staged Project E]Yes ®No Caltrans District: 7 County: LOS ANGELES State Route: N/A Post Mile Limits: N/A to N/A Project Location / Limits: Valley Street from Lyons Ave to 8th Street Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 61,981 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B $ 61,981 C (D) Maximum State Share = 0.5 x (C) $ 30,991 D c'%m \altPP\altPP'&pp ahtttl EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSFIIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+1)= 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best, of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: Signature: Attachments: Location Map, Typical, Cross -Section, Engineer's Estimate c\mnnfm N.Uppkak"S..PP I&W 2 909 2Q (PVT.) S y LYONS AVE T LIB 23200 DMV. r -r < z �� s °' 9K m N m r- TAZ c CT a N o WA y 0C. CHERRY A ST o N�� OF C SHADOW HE -;J / <G OAK LN m m HAPPY D 0 APPYVALLEY 2 Y ~ VDARL LEY m AKRUN �N m c QOj A D Co m m P �r1 o z g D ST A NEARGATE STH �E� titi D R AR1 3400 $ o PROJECT PLHEATHER m O 0 TIMON 0 �P Z LOCATION - ® R/W COLD MILL LIMITS n I I L_ - - EXISTING SURFACE VARIES VARIES PAVING FABRIC OR S.A.M.I. WHERE REQUIRED 1-1/2" TO 2" THICK ASPHALT RUBBER HOT MIX TYPICAL SECTION COLD MILL LIMITS Jfl N, T. S. NOTE, THE ROADWAY CRDSS-SECTION AND EXTENT OF REPAIR AND P,ECDNSTRUCTION IS PRELIMINARY IN NATURE. THE FINAL DESIGN CROSS-SECTION, EXTENT OF R & R, MEDIANS, AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN_ R/W Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Valley Street from Lyons Ave to 8th Street Description of Work: Street Overlay Length: 2341 feet Item Description Unit Quantit Unit Price Extended Amount Asphalt -Rubber Hot Mix (APJD TON 348 $ 55.00 $ 19,140 Cold Milling SF 37,136 0.30 11,141 Adjust Manhole EA 8 400.00 3,200 Adjust Pull/Meter Boxes EA 4 250.00 1,000 Project Signs EA 2 500.00 11000 Traffic Control Plan LS 100% 1,500.00 1,500 Traffic Loop Detectors EA 10 350.00 3,500 Signing & Striping LS 1,500 1.00 1,500 Construct Curb Ramps EA 10 2,000.00 20,000 Subtotal Contract Items $ 61,981 c honlcelsttpplcycleaest sheet 6 EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Expenditure Authorization (EA): State Administered Project []Yes ®No Transit Project []Yes [NNo Caltrans District: 7 State Route: N/A Phone: 805-255-4963 Project Planning Number: State Highway Staged Project County: E]Yes ®No []Yes ®No LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: Calgrove from I-5 to 600'W/0 Wiley Canyon Road Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 45,457 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B $ 45,457 C (D) Maximum State Share = 0.5 x (C) $ 22,729 D c\ma� \slfpp\�P➢4aPD ehntl EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+1) = 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: /_ b ear ' JPE nv/fl /t/(�r L`t�ly L Signature: t Uk, Attachments: Location Map, Typical Cross -Section, Engineer's Estimate c.\moven %,U,,\'U'P4.." sheet 2 Date: co aT CANER�WELL S r 0 �PM580RO P Q w i Q ST N STA DA15 gR� DR CPLGROVE 73 LEY OAK DR a <9 CT Wy�cOqK. LVD T o 0 RITgO£ k 2 r cT c� J Q U PROJECT LOCATION - R/W VARIES VARIES COLD MILL - LIMITS COLD MILL LIMITS 11_1L I _ L EXISTING SURFACE PAVING FABRIC OR S.A.M.I. WHERE REQUIRED 1-1/2" TO 2" THICK ASPHALT RUBBER HOT MIX TYPICAL SECTION N. T_ S. NOTE; THE ROADWAY CROSS-SECTION AND EXTENT OF REPAIR AND RECONSTRUCTION IS PRELIMINARY IN NATURE. THE FINAL DESIGN CROSS-SECTION, EXTENT OF R & R, MEDIANS, AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN, R/W Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Calgrove from 1-5 to 600' W/O Wiley Cyn Rd Description of Work: Street Overlay Length: 686 feet Item Description Unit Quantit Unit Price Extended Amount Asphalt -Rubber Hot Mix (ARHD TON 373 $ 55.00 $ 20,515 Cold Milling SF 25,308 0.30 7,592 Adjust Manhole EA 4 400.00 1,600 Adjust Pull/Meter Boxes EA 4 250.00 1,000 Project Signs EA 2 500.00 1,000 Traffic Control Plan LS 100% 1,500.00 1,500 Traffic Loop Detectors EA 5 350.00 1,750 Signing & Striping LS 2,500 1.00 2,500 Construct Curb Ramps EA 4 2,000.00 8,000 Subtotal Contract Items $ 45,457 a lmonicalshpplcycle& est sheet 5 EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO. PLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUND Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Expenditure Authorization (EA): State Administered Project Transit Project Caltrans District: 7 State Route: N/A []Yes [NNo E]Yes [NNo Phone: 805-255-4963 Project Planning Number:. State Highway Staged Project County: E]Yes ®No E]Yes ®No LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: Soledad Canyon Road from Miss Grace to Sand Canyon Road Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 238,270 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B $ 238,270 C (D) Maximum State Share = 0.5 x (C) $ 119,135 D & \ monim N slfpp %aUpplopp sheet I EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= 8 Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+l) = 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title:. Signature: Date: Attachments: Location Map, Typical Cross -Section,, Engineer's Estimate v%mo w. We" IdtPP3.." sheet 2 Q r Q 441 a ZI FAIRGLADE LA VEDA p ¢ / p ST o Q 11 9LF co Lu �2 a G� Z Qc` N , ( w P� x N tiF BAINBUR' R GPS P��s o <�I`N�E� o y� MISS GRACE DR �R Sr c` op SCF v O o `4� FOPS SAN L! 14 �—O PROJECT LOCATION - R/W COLD MILL - LIMITS Ip I I IL L EXISTING SURFACE VARIES VARIES COLD MILL LIMITS _ - I PAVING FABRIC OR S.A.M.I, WHERE REQUIRED 1-1/2 TO 2" THICK ASPHALT RUBBER HOT MIX TYPICAL SECTION N. T. S. NOTE: THE ROADWAY CROSS-SECTION AND EXTENT OF REPAIR AND RECONSTRUCTION IS PRELIMINARY IN NATURE:. THE FINAL DESIGN CROSS-SECTION, EXTENT OF R & R, MEDIANS, AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN.. R/W Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Soledad Canyon Road from Miss Grace to Sand Cyn Rd Description of Work: Street Overlay Length: 3170 feet Item Description Unit Quantit Unit Price Extended Amount Asphalt -Rubber Hot Mix (ARH3 TON 2,378 $ 55.00 $ 130,790 Cold Milling SF 253,600 0.30 76,080 Adjust Manhole EA 6 400.00 2,400 Adjust Pull/Meter Boxes EA 8 250.00 2,000 Project Signs EA 2 500.00 1,000 Traffic Control Plan LS 100% 1,500.00 1,500 Traffic Loop Detectors EA 10 350.00 3,500 Signing & Striping LS 5,000 1.00 5,000 Construct Curb Ramps EA 8 2,000.00 16,000 Subtotal Contract Items c:lmonicaWtpp1cyc1e8.est sheet4 $ 238,270 EXHIBIT A (PAGE 1 OF 2) (APP.05) STATE USE ONLY PROJECT NO, APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part I: Information and Certification Pursuant to California Streets and Highways Code, Division 3, Chapter 16, Section 2600 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: CITY OF SANTA CLARITA Address: 23920 VALENCIA BLVD., SUITE 300 SANTA CLARITA, CA 91355 Contact Person: Anthony J. Nisich, City Engineer Phone: 805-255-4963 Expenditure Authorization (EA): Project Planning Number: State Administered Project Transit Project Caltrans District: State Route: N/A []Yes ®No State Highway []Yes ®No ElYes ®No Staged Project []Yes ®No 7 County: LOS ANGELES Post Mile Limits: N/A to N/A Project Location / Limits: Orchard Village from McBean Parkway to Lyons Avenue Type of Work: STREET OVERLAY Source of Local Share Funds: General Fund, Local Bonds and/or TDA Article 8 Justification of Project: To reestablish the integrity of the pavement that adversely affects the quality of the ride. Extends the useful life of the roadway by ten years. Part II: Project Costs (A) Contract Items $ 416,173 A (B) Less Ineligible Amount (Contract Items) $ ( 0 ) B (C) Total Eligible Amount = A - B $ 416,173 C (D) Maximum State Share = 0.5 x (C) $ 208,087 D c \ m nim \skpp\sGpplapp sdsel I EXHIBIT A (PAGE 2 OF 2) APPLICATION FOR STATE -LOCAL TRANSPORTATION PARTNERSHIP PROGRAM FUNDS Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X= Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F.Y. QUARTER 1 (JUL-SEPT) QUARTER 2 (OCT -DEC) QUARTER 3 (JAN -MAR) QUARTER 4 (APR -MAY) TOTAL 199(X -1)/199X = 1997/1998 199X/199(X+1) = 1998/1999 50 50 100 199(X+1)/199(X+2) = 1999/2000 199(X+2)/199(X+3) = 2000/2001 GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of the applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. �E2-i �fccJM 4nl �/PE/LciS�cu�� (ill,,- � /N�l`� Name and title:. � Signature: Date: Attachments: Location Map, Typical Cross -Section, Engineer's Estimate c.lmoaim \altpp Wfppl app ,hmt2 PROJECT R• LOCATION - LYONS HEEN�RY MAYO /J MEM: �P/ MIENSai;l PLACERITA 3L HIGH SCH, H.M. NEWHALL MEMORIAL \ CITY PARK WM. S HART HIGH SCHOOL i AVE R/'w R/W VARIES I VARIES 8' 8' COLD MILL COLD MILL LIMITS LIMITS n 'L J' EXISTING SURFACE PAVING FABRIC OR S. A. M.I. WHERE REQUIRED 1-1/2" TO 2" THICK ASPHALT RUBBER ::HOT MIX TYPICAL SECTION N. L S. NOTE THE ROADWAY CROSS-SECTION AND EXTENT OF REPAIR AND RECONSTRUCTION IS PRELIMINARY IN NATURE. THE FINAL DESIGN CROSS-SECTION, EXTENT OF R 8, R, MEDIANS. AND OTHER DETAIL DESIGN CONSIDERATIONS WILL BE DETERMINED DURING FINAL DESIGN. Engineer's Estimate To be used as a basis for computation of State -Local Transportation Partnership Program funds. Project Title: Orchard Village from McBean Pkwy to Lyons Ave Description of Work: Street Overlay Length: 7134 feet Item Description Unit Quantit Unit Price Extended Amount Asphalt -Rubber Hot Mix (ARHb TON 4,280 $ 55.00 $ 235,400 Cold Milling SF 456,576 0.30 136,973 Adjust Manhole EA 12 400.00 4,800 Adjust Pull/Meter Boxes EA 10 250.00 2,500 Project Signs EA 2 500.00 1,000 Traffic Control Plan LS 100% 2,500.00 2,500 Traffic Loop Detectors EA 20 350.00 7,000 Signing & Striping LS 6,000 1.00 6,000 Construct Curb Ramps EA 10 2,000.00 20,000 Subtotal Contract Items c:lmon/cals/fppl cycfe8.est sheet $ 416,173 EXHIBIT A (APP•05) (PAGE 1 OF 2) STATE USE ONLY PROJECT NO._ rari l: tntuIII)au�,I Pursuant to California Streets and Highways Code. Division 3, Chapter 16, Section 2606 et seq., application for State -Local Transportation Partnership Program Funds is hereby made by: Applicant: City of Santa Clarita Address: 23920 Valencia Blvd., Suite 300 Santa Clarita, CA 91355 Contact Person: Wayne Weber Phone: (805) 286-4000 Expenditure Authorization (EA): State Administered Project ❑ Yes 0 Ao Transit Project ❑ Yes ❑ No Caltrans District: 07 Project Planning Number: State Highway ❑ Yes x❑ No Staged Project ❑ Yes E No County: Los Angeles State Route: N/A Post Mile Limits: N/A to N/A Project Location/Limits: Valencia Boulevard and Soledad Canyon Road between Creekside Drive and Commuter Way. Type of Work: Class I bikeway to connect the regional trail system to the intermodal 4Y r.n t., Source of Local Share Funds: Local Public Financing Bonds Justification of Project: This project replaces bike lanes on Soledad Canyon Road allowing Soledad Canyon Road to be restriped to six lanes of traffic increasing roadway capacity. Part il: Project Costs (A) Contract Payments g 1,500,000 A (B) Less Ineligible Amount (Contract Payments) S( 0 ) B (C) Total Eligible Amount = A - B $ 1,500,000 C (D) Maximum State Share= 0.5 X (C) $ 750,000 D 12 EXHIBIT A (Page 2 of 2) Part III: Quarterly Expenditure Plan SLTPP CYCLE NUMBER X 8 (For example:,' for Cycle 6. X=6) Percent by Quarter of Total Eligible Local Agency Expenditures (Do not adjust for early reimbursement procedures) STATE F. Y. QUARTER'1 QUARTER 2 QUARTER 3 QUARTER 4 TOTAL 1.(JUL-SEPT) (OCT- DEC) (JAN -MAR) (APR -JUNE) 139(X-1) / 199X = 1996/1997 I I 25. I- 25 I 50 I 100 i 99X / 199(X+1) = I - 199(X+1) / 199(X+2) = 1199(X+2) / 199(X+3) = jrui =xampie: [or i,ycte o, 199(X-1) / 199X = 1995 / 1996) GRAND TOTAL: 100% CERTIFICATION: To the best of my knowledge and belief, the data and information provided in this application are true and correct, and I am authorized to file this application on behalf of Me applicant. Applicant acknowledges that it understands, and can comply with the time limits for award of contracts and expenditure of funds. Name and title: Joseph Inch, Bikeway Coordinator Signatu Date: 56_/7 —9Ce-, Attachments: Location Map, Typical Cross -Section, Engineer's Estimate 13 CITY BOl1N0ARY t �E / SOLEOAO CANYON RD PROJECT LOCATION P{ / L �P{ I { JP SANTA CLARITA LOCATION MAP N TS. Cross Section Not Applicable To be used as a basis for computation of State -Local Transportation Partnership Program Funds. Project Title: Santa Clara River Trail Phase III Description of Work: Replace the existing on -street bicycle lanes on Soledad Canyon Road and Valencia Boulevard, between Commuter Way and the existing South Fork Trail at Creekside Drive, with an off-street bicycle lane in order to accommodate six lanes of travel on Soledad Canyon Road and Valencia Boulevard. 1= Description Amount 001 Earthwork $450,000 002 Bridge Overcrossing $325,000 003 Ramp Undercrossing $475,000 004 Asphalt Bikeway $150,000 005 Fence $100,000 Total: $1,500,000 plandevlengesb5.jmi