HomeMy WebLinkAbout1996-05-14 - AGENDA REPORTS - MCBEAN PKWY STORMDRN BID (2)AGENDA REPORT
City Manager Approval
Item to be presented by:
Robert G. Newman
CONSENT CALENDAR
DATE: May 14, 1996
SUBJECT: MCBEAN PARKWAY STORM DRAIN: WEST SIDE OF MCBEAN
PARKWAY FROM VALENCIA BOULEVARD TO THE SANTA CLARA
RIVER - PROJECT NO. 95064 - ADVERTISE FOR BIDS
DEPARTMENT: Building and Engineering Services
The scope of this project includes the construction of a major storm drain system. The storm
drain will replace an existing open channel that currently extends just north of Valencia
Boulevard to the Santa Clara River (see attached location map). The proposed construction will
allow for future development of adjacent properties which include the Hotel/Conference Center
and the Spectrum Club as approved by the City. The project is being funded by the Economic
Development Administration. The engineer's estimate for construction of this project is
approximately $3 million. Construction is scheduled to begin early August of this year with an
anticipated completion date of February 1997.
The City is currently discussing with Castaic Lake Water Agency the possibility of including the
installation of a new water line in conjunction with the storm drain project. Combining these
two projects will save both agencies money in construction costs, and will prevent delays during
construction that could delay the opening date for the Hotel/Conference Center. The estimated
cost of the water line is approximately $1 million.
Plans and specifications for this project have been completed and are available for review in
the office of the City Clerk.
1. Approve the plans and specifications for this project, and authorize the advertising for bids.
2. Appropriate $20,000 to Account No. 23-95064-227 and increase Estimated Revenues Account
No. 23-3551 by $20,000.
Location Map
RGN:KB:vjj
wmcil\adadrein.kh
Appogg Agenda Item:
City of Santa Clarita
Building and Engineering Services Department
Project Location Map
Ct
0
N A
�¢'ROAo
s
2
Q
SAN A m
U
RIVER
Af, PA
2 CRF VW
74 frs
s
RD
VALENCIATOWN SMEW VA
n
UIL
CENTER yT
v =
x
BLVD
GIT
t °RF
K
Vq�E 1A
North Project Limits of
xrs Proposed storm Drain