HomeMy WebLinkAbout1996-02-27 - AGENDA REPORTS - PHASE II STORMWATER MP (2)AGENDA REPORT CONSENT CALENDAR DATE: February 27, 1996 City Manger Approva Item to be presented Don Williams SUBJECT: ADDENDUM TO THE CONTRACT FOR PHASE II OF THE STORMWATER MASTER PLAN DEPARTMENT: Building & Engineering Services :� .'• Jam: On December 12, 1995, City Council approved a contract for Phase II of the Stormwater Master Plan (SMP). The original contract was approved in the amount of $399,133. The original scope of work and cost estimate submitted by the consultant were significantly reduced by more than $230,000 by City staff in the preparation of the contract for Phase II. It has now been determined that some additional services recommended in the original scope of work will be necessary during Phase II to better complete that portion of the SMP contract. The addendum covers the costs of consultant services for management and coordination of all portions of the work to ensure that all elements of the SMP, automated mapping system and hydraulic modeling are compatibly designed and will successfully integrate when completed. It is essential that this coordination occur during the design and set-up of the database and mapping system. This item recommends approval of the addendum to the contract for Phase II of the SMP and automated mapping in the amount of $24,300. This is a six percent increase to the existing SMP contract. These costs were anticipated when the Stormwater Utility was established and were included in the three-year Utility start-up budget. RiXWO)AIM0112 •� City Council direct the City Manager to execute an addendum to the contract in the amount of $24,300 with Woodward -Clyde Consultants, and authorize the transfer of $24,300 from the Stormwater Utility fund balance Account No. 51-2600 to Account No. 51-5602-227. ATTACHMENT Addendum to the Stormwater Management Plan Phase II Contract NED:hds council\smguadd..d WIMMED Agenda Item:JA CITY OF SANTA CLARITA c ''- BUILDING & ENGINEERING SERVICES DEPARTMENT _ 23920 VALENCIA BOULEVARD, SUITE 300 SANTA CLARITA, CALIFORNIA 91355 �'^••-«=' ADDENDUM TO THE CONTRACT FOR A STORMWATER MASTER PLAN AND AUTOMATED MAPPING SERVICES ADDENDUM TO AGREEMENT NO. 51-5602-227-3 This Addendum to the Agreement, dated the 18th of January 1996, is entered into this 27th day of February 1996, by and between the City of Santa Clarita, a municipal corporation of the State of California, hereinafter "City," and Woodward -Clyde Consultants, hereinafter "Consultant" WHEREAS, on December 12, 1995, the City Council approved a contract for Phase II of the Stormwater Master Plan. The City has entered into a contract with Woodward -Clyde Consultants for the preparation of the Stormwater Master Plan and all other services described in the scope of work for the signed contract for Phase II of the Stormwater Master Plan and Automated Mapping Services; and WHEREAS, it has now been determined that additional services recommended in the original scope of work will be necessary during Phase II to better complete that portion of the Stormwater Master Plan contract. This Addendum is to add consultant services to the scope of work as shown in Table 6-1A. The services to be added are for project management and coordination of all portions of the work to ensure that all elements of the Master Plan, automated mapping system and hydraulic modeling are compatibly designed and will successfully integrate when completed. It is essential for this to happen during the design and set-up of the database and mapping system. WHEREAS, this Addendum to the contract for Phase II of the Stormwater Master Plan and automated mapping is in the amount of $24,300, in addition to the previous contract amount of $399,133 as shown on the attached Table 64A. NOW, THEREFORE, for mutual consideration as provided herein, it is agreed by and between City and Consultant as follows: A. This Addendum and Table 6-1A forms part of the contract documents for AGREEMENT NO. 51-5602-227-3, dated January 18, 1996. All portions of the original contract and terms and conditions remain in full force and effect and apply to this Addendum also. B. Consultant shall provide the additional services to manage and coordinate all portions of the work to ensure that all elements of the Master Plan, automated mapping system and hydraulic modeling are compatibly designed and will successfully integrate when completed. C. City will compensate Consultant for the additional services in the amount of $24,300 in accordance with the Terms and Conditions contained in the AGREEMENT NO. 51-5602-227-3, dated January 18, 1996. Page 1 of 2 M lU ?J.JG� 9LYJ: ADDENDUM TO AGREEMENT NO. 51-5602-227-3 Page 2 1), HS S .D S qPL OF WORK The revised scope of work which includes the items from this addendum is attached as Table 6.1A. In rccognition of the obligation stated in this Addendum, the parties have executed this Agreement on the date indicated above. A'1"1'FS'1': CITY OF SANTA CLARITA City Clerk Woodward -Clyde Consultants 2020 East First Street, Suite 400 Santa Ana, CA 82705 Pbone: (714) 835-6886 FAX: (714) 667-7147 By: Stoven Pearson, Vice President Woodward -Clyde Consultants NED:hds yw.�nR.w.wm Page 2of2 City Manager ADDENDUM TO AGREEMENT NO. 51-5602-227-3 Page 2 D. REVISED SCOPE OF WORK The revised scope of work which includes the items from this Addendum is attached as Table 6-1-A. In recognition of the obligation stated in this Addendum, the parties have executed this Agreement on the date indicated above. ATTEST: CITY OF SANTA CLARITA City Clerk Woodward -Clyde Consultants 2020 East First Street, Suite 400 Santa Ana, CA 92705 Phone: (714) 835-6886 FAX: (714) 667-7147 By: E. Steven Pearson, Vice President Woodward -Clyde Consultants NED:hds „pdu%.M,.dd, , Page 2 of 2 City Manager TABLE 6-1A 105menfecS.Perrsac�riaters?t,arY.iss ) ,P., & Budget - City of Santa Clarita Phase 2 Work Plan TASK COST Section 2.0 Stormwater Management Plan Master Plan Staffing & Resource Needs $4,889 Total Section 2.0 $4,889 Section 3.0 Stormwater Monitoring Plan Total Section 3.0 $0 Section 4.0 Hydrology/Hydraulics Modeling 1.1 Existing Flood Control Facilities $8,854 1.2 Topographic information $2,713 1.3 Hydrologic Land Use Designations $4,480 1.4 Hydrologic Soil Grouping Data $1,003 1.5 Field Verification $4,871 2.1 Analysis Criteria $4,131 2.2 Watershed Boundary $20,456 2.3 Network Development $16,868 2.4 Computer Model Data Base Development $18,662 2.5 Hydrology Model Runs $15,762 2.6 Runoff Volume Estimation $8,830 2.7 Storm Drain Deficiencv $13.830 Total Section 4.0 Section 5.0 Automated Mapping Tasks 1, Database Design $43,602 2. Topo/Planimetry Coverages $28,858 3. Cadastral Coverage $33,504 4. Hardware/Software Design $42,825 5. ArcCad Training $17,705 6. SMP Model Coverages $74,842 10. Arcview Interface $27,448 ntingency $5,000 Total Section 5.0 $284,700 1 43tt5 eco a 8gr' neitx' a VNEIMMOW WO Total Sections 2.0 - 5.0 $423,433 (Original contract amount of $399,133 + $24,300 = $423,433) s:\cd\npdes\table6la.xls Page 1 2/8/96 8:56 AM