CONSENT CALENDAR
City Manager, Approval
Item to be presented by:
Bahman Janka
DATE: March 26, 1996
SUBJECT: SIERRA HIGHWAY, BOUQUET/SECO CANYON ROADS TRAFFIC
SIGNAL INTERCONNECT DESIGN CONTRACT
DEPARTMENT: Building and Engineering Services
C' 1• K
The Los Angeles County Metropolitan Transportation Authority (MTA) has awarded
improvement grants to the City totaling $868,000 for traffic signal interconnect projects along
the subject streets. On November 28, 1995, the City Council authorized the City Manager to
execute the Memoranda of Understanding (MOU) between the City and MTA; authorized budget
appropriation; and adopted Resolution No. 95-144, which sets forth the availability of local
matching funds for these projects.
The interconnect will run along Sierra Highway from San Fernando Road to Placerita Canyon
Road and from Rainbow Glen Drive to Soledad Canyon Road, Bouquet Canyon Road from Magic
Mountain Parkway to Plum Canyon Road, and Seco Canyon Road from Bouquet Canyon Road
to Copper Hill Drive. It will include installation of conduit and cable to link the traffic signals
along these routes. The main goal is to effectively implement signal synchronization of all traffic
signals and to improve traffic flow and reduce travel times.
The funding status for this project is shown in the attached Agenda Report, dated
November 28, 1995. It is anticipated that the design for this project will be completed in FY
1995-96, while the construction and implementation will occur in FY 1996-97. The total local
match for the design portion of this project is anticipated to be approximately $28,000.00 and
has been set aside in a Public Financing Authority (PFA) match account for FY 1995-96.
After MTA executed the MOU on December 31, 1995, staff requested proposals from Traffic
Engineering Consultants to prepare the interconnect design plans and develop new signal
timing plans for the entire project. Staff received proposals for professional services from fifteen
firms as follows:
1r0- F1, j� p
I r 011 U, E 0 Agenda Item:
SIERRA HIGHWAY, BOUQUET/SECO CANYON ROADS
TRAFFIC SIGNAL INTERCONNECT DESIGN CONTRACT
March 26, 1996 - Page 2
Firm Name Location
Abratique & Associates
Los Angeles
Albert Grover &Associates
Fullerton
ASL Consulting Engineers
Irvine
Austin Foust Associates
Tustin
Barton-Aschman & Associates
Pasadena
DKS & Associates
Santa Ana.
F.A.R. Inc.
Rosemead
FPL &.Associates
Irvine
Hank Mohle & Associates
La Habra
Katz, Okitsu & Associates
Monterey Park
Linscott Law & Greenspan
Pasadena
Meyer, Mohaddes Associates
Los Angeles
Minagar & Associates
Costa Mesa
Transtech Engineers
Walnut
Weston Pringle Associates
Laguna Hills
Based on technical qualifications and methodology for the project, Albert Grover & Associates
is the recommended firm. Staff has negotiated a price of $118,000.00 for these services.
RECOMMENDATION
Authorize the City Manager to execute a contract with Albert Grover & Associates in the
amount of $118,000.00 and authorize $22,000.00 in contingency expenditures should any
changes to the consultant's contract become necessary, subject to the approval of the City
Attorney as to form.
Agenda Report - November 28, 1995
Location Map
BJ:NMB:lkl
mu�inwrru.=b
0
CONSENT CALENDAR
DATE: November 28, 1995
City Mana€
Item to be
Bahman Janka
SUBJECT: MEMORANDUM OF UNDERSTANDING FOR THE SIERRA HIGHWAY
AND BOUQUET/SECO CANYON TRAFFIC SIGNAL INTERCONNECT
RESOLUTION NO. 95-144
DEPARTMENT: Building and Engineering Services
The Los Angeles County Metropolitan Transportation Authority ("MTA") has awarded
improvement grants totaling $868,000 for the above projects. MTA procedures require that a
Memorandum of Understanding (MOU) be executed and that Council certify that matching
funds will be made available to complete each project. The status of the two projects is provided
below:
Sierra Highway Interconnect
• Staff estimates that the total cost for this project will be $465,000 with the MTA
awarding a $372,000 discretionary grant to be used for this project within three years
from July 1, 1995. The remaining balance of $93,000 will be the local matching funds
needed.
• It is estimated that $60,000 will be needed for design and $405,000 for construction.
All design costs will be utilized this FY 1995-96 while construction costs will be used
in FY 1996-97.
A local match of $12,000 will be needed for design this FY 1995-96 and the remaining
local match of $81,000 will be appropriated in FY 1996-97.
• Local matching funds required this year have been set aside in a Public Financing
Authority (P.F.A.) match account for FY 1995-96.
Agenda Item: 7Z
RESOLUTION NO. 95-144
November 28, 1995 -Page 2
2. Bouquet Canyon Road and Seco Canyon Road Interconnect
• Staff estimates that the total cost for this project will be $660,000 with the MTA
awarding a $496,000 discretionary grant to be used for this project within three years
from July 1, 1995. The remaining balance of $164,000 will be the local matching
funds needed.
• It is estimated that $80,000 will be needed for design and $580,000 for construction.
All design costs will be utilized this FY 1995-96 while construction costs will be used
.in FY 1996-97.
• A local match of $16,000 will be needed for design this FY 1995-96 and the remaining
local match of $148,000 will be appropriated in FY 1996-97.
Local matching funds required this year have been set aside in a P.F.A. match account
for FY 1995-96.
Adopt Resolution No. 95-144. Authorize a budget appropriation for the Sierra.Highway Traffic
Signal Interconnect for FY 1995-96 as follows: Account No. 28-95051-227 - $12,000 P.F.A ,
Account No. 17-95051-227 -$48,000 MTA Grant. Authorize a budget appropriation for the
Bouquet Canyon Road/Seco Canyon Road Traffic Signal Interconnect for FY 1995-96 as follows:
Account No. 28-95052-227 - $16,000 P.F.A.; Account No. 17-95052-227 - $64,000 MTA Grant.
Direct staff to increase Revenue Account No. 17-3579 by $112,000.
ATTACHMEM.
•1. Resolution No. 95-144
2. Memorandum of Understanding for the Sierra Highway/State Route 14 CMP Corridor
Interconnect
3. Memorandum of Understanding for the North/South Metrolink Feeder Corridor
Interconnect
NMB:lld
eouncdk1rt -W.h
LA
a
RESOLUTION NO. 95-144
November 28, 1995 - Page 2
2. Bouquet Canyon Road and Seco Canyon Road Interconnect
Staff estimates that the total cost for this project will be $660,000 with the MTA
awarding a $496,000 discretionary grant to be used for this project within three years
from July 1, 1995. The remaining balance of $164,000 will be the local matching
funds needed.
• It is estimated that $80,000 will be needed for design and $580,000 for construction.
All design costs will be utilized this FY 1995-96 while construction costs will be used
in FY 1996-97.
• A local match of $16,000 will be needed for design this FY 1995-96 and the remaining
local match of $148,000 will be appropriated in FY 1996-97.
• Local matching funds required this year have been set aside in a P.F.A. match account
for FY 1995-96.
Adopt Resolution No. 95-144.. Authorize a budget appropriation for the Si
Signal Interconnect for FY 1995-96 as follows: Account No..28-95051-
Account No. 17-95051-227 -$48,000 MTA Grant. Authorize'a budget
Bouquet Canyon Road/Seca Canyon Road Traffic Signal Interconnect for F
Account No. 28-95052-227 -$16,000 P.F.A.; Account No. 17=95052-227 -
Direct staff to increase Revenue Account No. 17-3579 by $112;000.
lay Traffic
100 P.F.A.;
.on for the
as follows:
TA Grant.
-1. Resolution No. 95-144
2. Memorandum of Understanding for the Sierra Highway/State Route 14 CMP Corridor
Interconnect
3. Memorandum of Understanding for the North/South Metrolink Feeder Corridor
Interconnect
NMB:Ikl
mwril�nAS.lu.nmb
A
Sierra Highway Traffic Signal
Interconnect
�I
qO
FF
1
�w I MATCH ONE - SEE LEFT
y �la✓L � O
I
v�PQ,P It
MATCH UNE - SEE RIGHT
LEGEND:
O - EXISTING TRAFFIC SIGNALS
- PROPOSED INTERCONNECT
Sierra Highway Traffic Signal
Interconnect
Bouquet/Seco Canyon Road
Traffic Signal Interconnect
FF
t �
trP �
I
y �la✓L � O
LEGEND:
O - EXISTING TRAFFIC SIGNALS
- PROPOSED INTERCONNECT'. Qt
Bouquet/Seco Canyon Road
Traffic Signal Interconnect