AGENDA REPORT
City Manager Approval
Item to be presented by:
Robert G. Newman
CONSENT CALENDAR
DATE: April 16, 1996
SUBJECT: VALENCIA BOULEVARD TRAFFIC SIGNAL INTERCONNECT
PROJECT NO. 95-030
DEPARTMENT: Building and Engineering Services
The subject project involves hardwire interconnect installation along Valencia
Boulevard/Soledad Canyon Road from I-5 northbound to McBean Parkway and from Bouquet
Canyon Road to Golden Oak Road. This is the second phase of the Soledad project. The first
phase of the project (from Golden Oak Road to Galeton Road) is under construction.
In conjunction with the above work, staff is proposing to combine the installation of interconnect
conduit and cable from the intersection of Valencia Boulevard/Citrus Street to City Hall, Staff
anticipates that combining the two projects will result in a cost savings for the City.
The project will improve traffic flow through the City by allowing for increased coordination of
the City's traffic signals.
Account Nos. 17-95030-227 and 16-95030-227 were established to track costs associated with
this project, which is currently budgeted for $244,000.
1. Approve the plans and specifications for this project, and authorize the advertising for bids.
2. Authorize staff to transfer $50,000 from San Fernando Phases III and IV Account
No. 16-96027-227 to Account No. 16-95030-227 to cover the cost for the City Hall
interconnect project.
Location Map
MC:lkl
cou,�a�er i,gni.mc
T, , � I I a "11 A
MOMWA
0 CANYON RD
Q�,�� NfK7fA(( RANCH RD
Q
m�
?V /
r ROJECT
0.95-03
�O
LYONS AVE
c
002 � m
9� p0
CALCROVF BI VU
SOLEDAD CANYON RD
P9'2
dQ
l
L OZ
� OP
9�
PO
SqN
Nq�UO
�Q
`v
LOCATION MAP
NO SCALL.
it