Loading...
HomeMy WebLinkAbout1996-04-16 - AGENDA REPORTS - VALENCIA BLVD SIGNAL (2)K9 AGENDA REPORT City Manager Approval Item to be presented by: Robert G. Newman CONSENT CALENDAR DATE: April 16, 1996 SUBJECT: VALENCIA BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT NO. 95-030 DEPARTMENT: Building and Engineering Services The subject project involves hardwire interconnect installation along Valencia Boulevard/Soledad Canyon Road from I-5 northbound to McBean Parkway and from Bouquet Canyon Road to Golden Oak Road. This is the second phase of the Soledad project. The first phase of the project (from Golden Oak Road to Galeton Road) is under construction. In conjunction with the above work, staff is proposing to combine the installation of interconnect conduit and cable from the intersection of Valencia Boulevard/Citrus Street to City Hall, Staff anticipates that combining the two projects will result in a cost savings for the City. The project will improve traffic flow through the City by allowing for increased coordination of the City's traffic signals. Account Nos. 17-95030-227 and 16-95030-227 were established to track costs associated with this project, which is currently budgeted for $244,000. 1. Approve the plans and specifications for this project, and authorize the advertising for bids. 2. Authorize staff to transfer $50,000 from San Fernando Phases III and IV Account No. 16-96027-227 to Account No. 16-95030-227 to cover the cost for the City Hall interconnect project. Location Map MC:lkl cou,�a�er i,gni.mc T, , � I I a "11 A MOMWA 0 CANYON RD Q�,�� NfK7fA(( RANCH RD Q m� ?V / r ROJECT 0.95-03 �O LYONS AVE c 002 � m 9� p0 CALCROVF BI VU SOLEDAD CANYON RD P9'2 dQ l L OZ � OP 9� PO SqN Nq�UO �Q `v LOCATION MAP NO SCALL. it