HomeMy WebLinkAbout1996-06-25 - AGENDA REPORTS - VALENCIA BLVD TRAFSIG PROJ (2)AGENDA REPORT City Manager Approve Item to be. presented Robert G. Newman CONSENT CALENDAR DATE:. June 25, 1996 SUBJECT:. VALENCIA BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT NO. 95-030 - BID AWARD DEPARTMENT: Building and Engineering Services BACKGROUND On April 16, 1996, Council authorized the advertisement of the subject project. The project involves hardwire interconnect installation along Valencia Boulevard/Soledad Canyon Road from I-5 northbound to McBean Parkway and from Bouquet Canyon Road to Golden Oak Road. This is the second phase of the Soledad project. The first phase of the project (from Golden Oak Road to Galeton Road) is under construction. In conjunction with the above work, staff is proposing to combine the installation of interconnect conduit and cable from the intersection of Valencia Boulevard/Citrus Street to City Hall. The Valencia Interconnect Project was divided into two bid schedules based upon budget constraints: Option A contains the complete project as provided in the plans and specifications. Option B is the same as Option A, less an empty conduit, which was for future use. On June 4, 1996, the bids were received by the City Clerk (see Attachment A). The Engineer's Estimate for this project is $307,61500. The amount of $296,479.00 is currently budgeted in Account Nos. 17-95030-227 and 16-95030-227 for contract administration, inspection and construction of this project. Due to budget constraints, City staff is recommending the City award Option B to the lowest bidder, Steven R. Rodgers. Steven R. Rodgers is a local contractor from Newhall and possesses a State contractor's license and is in good standing with the State Contractor's License Board. The bid of $210,631.00 for Option B was reviewed for accuracy and conformance to the contract documents and was found to be complete. This contractor has done similar contract work for many other agencies. The references indicated that this contractor has performed work to their satisfaction. The City Council 1) award the contract to the lower bidder, Steven R. Rodgers, in the amount of $210,631.00, and authorize $22,000.00 in contingency expenditure should any change orders to the contract become necessary; and 2) authorize the City Manager or his designee to execute all contract documents relating to this contract. Appfloffl Agenda Item -7— VALENCIA BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT 95-030 - BID AWARD June 25, 1996 - Page 2 Summary of Bids. Location Map MC:vjj munc4XTRFSGNLI.MC. ATTACIRVIENT A MC:vjj uMRTRPSCNL].MC SUMMARY OF BIDS VALENCIA BOULEVARD TRAFFIC SIGNAL INTERCONNECT PROJECT NO. 95-030 Compan Location Bid Amount Q12tion A Option B 1. Century Constructors Ventura, CA $291,202.70 $225,096.70 2. Steven R. Rodgers Newhall, CA $258,184.40 $210,631.00 3. CT & F, Inc. Bell Gardens, CA $404,849.26 $291,121.96 4. California Electrical Services Glendale, CA $439,245.00 $346,055.00 MC:vjj uMRTRPSCNL].MC {w CANYON RD z d F- r Q�a NEMC.. RANCH RD Q m� PROJECT 0.95-03 LYONS AVE 00 o�y .P, o v o CA[ CROW 81 VD SOlE0A0 OANYON RO �9y �o o �P 9� �o I �0 P� SqA, goo �D LOCATION MAP NO ;CALf