HomeMy WebLinkAbout1997-08-26 - AGENDA REPORTS - ANNUAL SIDEWALK PROGRAM (2)AGENDA REPORT
City Manager Approval
Item to be presented by:
T. Brad Therrien
CONSENT CALENDAR
DATE: August 26, 1997
SUBJECT: 1996/97 ANNUAL SIDEWALK PROGRAM - PROJECT NO. S0009 -
ADVERTISE FOR BIDS
DEPARTMENT:. Transportation and Engineering Services
BACKGROUND
These four projects are part of the City's 1996/97 Annual Sidewalk Program, and will provide
new sidewalks, public access ramps, and curb and gutters at the locations described below.
The sites for this work were selected based on input received from the school transportation
routes and suggested route-to-school.plans,.as well as specific school district requests. The
various projects will combine to increase the level of safety afforded to the school children as
they travel to and from school each day, thereby adding to the high level of community safety
that exists within the City.
Area I: West side of Honby Street between Santa Clara Street and Soledad Canyon Road in
Canyon County, including the construction of sidewalk, public access ramps, and
curb and gutter.
Area II: East side of Atwood Boulevard between Evans Avenue and Powell Drive in Newhall.
This work consists of the construction of sidewalk.
Area III: North side of Sierra Highway between Friendly Valley Parkway and Whispering
Leaves Drive, and the south side of Sierra Highway between Whispering Leaves
Drive and Vista del Canon. This work consists of sidewalk construction.
Area IV: South side of McBean Parkway between the Interstate -5 off -ramp and Tournament
Road. The work includes construction of sidewalk and public access ramps.
Since the City has combined the work for these areas into one project, the cost will be lower due
to the increase in magnitude rather than if each area were to be completed as a separate
project.
Through the expeditious use of Gas Tax, State Transportation Development Act (TDA),
Proposition C, and Developer funds, this work is being accomplished without the use of any
general fund money.
1996/97 ANNUAL SIDEWALK PROGRAM - PROJECT NO. S0009
August 26, 1997 - Page 2
The following accounts have been established to track costs associate with the project, totaling
$175,500.00:
Account Number
Funding Source
Amount
50009201
Gas Tax
$ 20,000.00
50009204
State Transportation Development Act (TDA)
$ 25,000.00
50009205
Proposition C
$ 80,500.00
S0009455
Developer Fees
$ 50.000.00
TOTAL
$175,500.00
City Council approve the plans and specifications for Project No. 50009 and authorize the
advertising for bids for the 1996/97 Annual Sidewalk Program.
Location Map
MC:vjj
c dl%%MDEWMC
AREA
G
LEGEND:
LOCATION
N.T.S.
LOCATIONS
MAP