HomeMy WebLinkAbout1997-12-09 - AGENDA REPORTS - PROJ MGMT SERVS (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: December 9, 1997 City Manager Approval: Item to be presented by SUBJECT: PROJECT MANAGEMENT SERVICES FOR THE 1997-98 ANNUAL PAVEMENT, SIDEWALK, CURB AND GUTTER MAINTENANCE AND INSTALLATION PROJECTS (PROJECT NOS. M0002, M0003, T0006, M0004, T0007, PWS5, S3003) - CONTRACT APPROVAL DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council award contract to Harris & Associates for $177,762.00 and authorize a 15% contingency expenditure for project management of the projects listed below. Funds have been budgeted in FY 97/98 in the corresponding accounts listed below. Authorize the City Manager or designee to execute and sign all documents, subject to City Attorney approval. Proiect Name 1997-98 Annual Overlay Program 1997-98 Annual Slurry Program 1997-98 Annual Access Ramp Construction 1997-98 Annual Curb & Gutter Repair 1997-98 Annual New Sidewalk Program 1997-98 Annual Sidewalk Repair Camp Plenty Road at Calla Way Improvements Project No. Account Nos. - M0002 M0002205, M0002455 M0003 M0003103, M0003201, M0003455 T0006 T0006103 M0004 M0004052 T0007 T0007103 PWS5 5211-8061 S3003 S3003052 To most efficiently use available funding, these seven City projects are being combined and contracted to one consultant firm for project management services. The Annual Overlay Project will resurface various streets throughout the City to provide a smoother ride for traffic, enhance the appearance of the area, and increase the economic life of the roadway. The Annual Slurry Project will seal surface cracks, improve skid resistance and increase the useful pavement life. Streets for both the overlay and slurry projects will be selected based on the City's pavement management system. pp00 U, Agenda Item: VT- PROJECT MANAGEMENT SERVICES FOR PROJECT NOS. M0002, M0003, T0006, M0004, T0007, PWSS, 53003 December 9, 1997 - Page 2 The Annual Access Ramp Construction project will install pedestrian access ramps in the high - demand areas of the City, including transit routes, parks, schools, and hospitals as required by the Americans with Disabilities Act. This project is funded entirely with Federal Aid - Urban funds. The Annual Curb and Gutter Repair program will install new curb and gutter at various locations throughout the City where flowline problems that cause standing water exist. Locations will be selected based on citizen requests and staff observations. The Annual Sidewalk Repair project will repair damaged sidewalks at various locations throughout the City. Locations will be selected based on citizen requests and by staff observations. The Annual New Sidewalk project will install sidewalks at various locations within the City where none currently exist. The primary focus is in areas with high pedestrian usage and pedestrian routes associated with the Suggested Route to School Program. This program helps reduce the City's liability by providing designated pedestrian routes. This project is funded entirely with Federal Aid - Urban funds. The Camp Plenty Road at Calla Way Improvement project will construct curb, gutter, and sidewalk on Camp Plenty Road between Stillmore Street and Calla Way. This project will provide designated pedestrian routes near Sierra Vista Junior High School. Staff prepared a Request for Proposal (RFP) for the subject projects. The RFPs were sent to 11 firms on the City's project management consultant list. Nine firms responded by submitting proposals (see attached list). Interviews were held with the four top rated firms. After going through this selection process, staff recommends Harris & Associates as the most qualified firm. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The total project budget of these seven projects combined is $1,618,500.00. The estimated cost for these project management services is $177,762.00. Sufficient funds are available in the designated accounts. List of Firms Responding to RFP RB:vjj cmmel\m0003\PROJbMNXB LIST OF FIRMS RESPONDING TO RFP 1997-98 ANNUAL OVERLAY & SLURRY PROJECTS Antelope Valley Design Group Lancaster, California CBM Consulting Gardena,.Califomia Construction Management Inspection Thousand Oaks, California Global Engineering Construction, Inc. Escondido, California Harris & Associates Los Alamitos, California Track It Monitoring System Fresno, California Transtech Walnut, California Vali Cooper & Associates Upland, California Willdan & Associates Industry, California IM:vjj ... l \.0002 \ PROJMANXH