HomeMy WebLinkAbout1997-02-11 - AGENDA REPORTS - SOLEDAD CYN LANDSCAPING (2)City
Item to be presented by:
Rick Putnam
CONSENT CALENDAR
DATE: February 11, 1997
SUBJECT: SOLEDAD CANYON ROAD MEDIAN LANDSCAPING
PROJECT NO. 99-059 - ADVERTISE FOR BIDS
DEPARTMENT: Parks, Recreation, and Community Services
Project 99-059 consists of median landscaping along Soledad Canyon Road between Whites
Canyon Road and Langside Avenue (see attached project location map and median design
layout). The project, which is currently under final design review, incorporates landscaping and
stamped concrete features similar to those previously constructed on Soledad Canyon Road
between Sand Canyon Road and Shadow Pines Boulevard.
It is proposed that the Soledad Bridge (west of Camp Plenty Road) consist of a combination of
stamped concrete, broom -finished concrete, and boulders. Staff has determined that it would
be impractical to place landscaping on the bridge due to the depth of planter required and
weight that would be imposed on the bridge.
Budget in the amount of $300,000 (PFA Funds) and $30,998 (TDA Article 8 Funds) for a total
budget of $330,998 were previously authorized by City Council for this project. Account Nos.
10001052-8001 and 10001204-8001 have been established to track these costs.
City Council authorize staff to issue a Notice Inviting Bids for the project, subject to
incorporation of final design review comments. Council adoption of the plans and specifications
to be made at the time of contract award.
Project Location Map
Soledad Canyon Road Median Design Layout
REP:KDN:cac
prlplandev199059Wg cc.01
Benda item:
�9
y�
D
o
s
0
4
V
CANYON
PROJECT
LOCATION — (—]
s
TYPICAL PLANTERS
STAMPED CONCRETE
s
�a
$N
o
BOULDERS
BROOM FINISHED CONCRETE
STAMPED CONCRETE
m„
a
8
Sots DqD
�$
CAN Xy,-
ON gNyON
s�
RD4D
r
BRIDGE
NO SCALE
SOLEDAD
CANYON
ROAD MEDIAN
DESIGN