Loading...
HomeMy WebLinkAbout1997-02-11 - AGENDA REPORTS - SOLEDAD CYN LANDSCAPING (2)City Item to be presented by: Rick Putnam CONSENT CALENDAR DATE: February 11, 1997 SUBJECT: SOLEDAD CANYON ROAD MEDIAN LANDSCAPING PROJECT NO. 99-059 - ADVERTISE FOR BIDS DEPARTMENT: Parks, Recreation, and Community Services Project 99-059 consists of median landscaping along Soledad Canyon Road between Whites Canyon Road and Langside Avenue (see attached project location map and median design layout). The project, which is currently under final design review, incorporates landscaping and stamped concrete features similar to those previously constructed on Soledad Canyon Road between Sand Canyon Road and Shadow Pines Boulevard. It is proposed that the Soledad Bridge (west of Camp Plenty Road) consist of a combination of stamped concrete, broom -finished concrete, and boulders. Staff has determined that it would be impractical to place landscaping on the bridge due to the depth of planter required and weight that would be imposed on the bridge. Budget in the amount of $300,000 (PFA Funds) and $30,998 (TDA Article 8 Funds) for a total budget of $330,998 were previously authorized by City Council for this project. Account Nos. 10001052-8001 and 10001204-8001 have been established to track these costs. City Council authorize staff to issue a Notice Inviting Bids for the project, subject to incorporation of final design review comments. Council adoption of the plans and specifications to be made at the time of contract award. Project Location Map Soledad Canyon Road Median Design Layout REP:KDN:cac prlplandev199059Wg cc.01 Benda item: �9 y� D o s 0 4 V CANYON PROJECT LOCATION — (—] s TYPICAL PLANTERS STAMPED CONCRETE s �a $N o BOULDERS BROOM FINISHED CONCRETE STAMPED CONCRETE m„ a 8 Sots DqD �$ CAN Xy,- ON gNyON s� RD4D r BRIDGE NO SCALE SOLEDAD CANYON ROAD MEDIAN DESIGN