HomeMy WebLinkAbout1997-04-22 - AGENDA REPORTS - SOLEDADCYN LANDSCAPING (2)J AGENDA REPORT City Manager Approval Item to be presented �: Rick Putnam CONSENT CALENDAR DATE: April 22, 1997 SUBJECT: SOLEDAD CANYON ROAD MEDIAN LANDSCAPING PROJECT NO. 99-059 - BID AWARD DEPARTMENT: Parks, Recreation, and Community Services On February 11, 1997, City Council authorized the advertisement of Project 99-059. This project consists of median landscaping along Soledad Canyon Road between Whites Canyon Road and Langside Avenue (see project location map). The project incorporates landscaping and stamped concrete features similar to those previously constructed on Soledad Canyon Road between Sand Canyon Road and Shadow Pines Boulevard. The following bids were received by the City Clerk on March 18, 1997: Terra -Cal Construction Baldwin Park $332,252.91 Engineer's Estimate $340,755.99 Valley Crest Landscape San Fernando $370,102.34 American Landscape Canoga Park $385,183.87 Marina Landscape Irvine $391,483.70 Acacia Landscaping Santa Barbara $409;095.46 S & M Landscape Azusa $412,957.74 Mariposa Horticultural Irwindale $420,241.91 Thomsen Landscape Woodland Hills $435,858.50 Current budget in the Project 99-059 account will only permit landscaping from Whites Canyon to slightly west of the Soledad Bridge (west of Camp Plenty Road). Staff anticipated this shortfall ($100,000) during design, and prepared for the following alternatives: shorten the current limits of work to conform to existing budget constraints; or extend the current limits of work in anticipation of additional median landscape funding in the FY 97-98 annual budget. Extending the current limits of work under this contract would have the advantage of eliminating some mobilization and construction management costs associated with a follow-up project. In addition, a request by the City's Traffic Engineer to extend the existing turn pocket on Soledad Canyon Road at Whites Canyon Road could also be accommodated. Sufficient funds have been identified in Fund 455 (developer fees) to cover the cost of the above work. POpG30�E I ,Agentlaifiem:J-J In summary, staff recommends the following: Award the project to the low bidder, Terra -Cal Construction for $332,252.58 and authorize a contingency expenditure of 10% for unforseen conditions. Other than a minor arithmetic error in the bid schedule (the proposal read $332,252.91) the Terra -Cal proposal was found to be in conformance with contract document requirements. • Authorize an extension of the current project limits to include median landscaping in the vicinity of Crossglade Avenue and Rainbow Glen Drive, and authorize an extension of the turn pocket in the vicinity of Whites Canyon Road. Authorize staff to negotiate a change order with Terra -Cal for this additional work (estimated at $253,000.) Authorize an appropriation of $365,000 to Project 99-059 Account No. 10001455 to cover the following: $100,000 shortfall for the "as -bid" project; $253,000 for construction of the additional work proposed; and $12,000 for survey, inspection, and testing for the additional work proposed. 1. Adopt the plans and specifications for Project No. 99-059. 2. Award a contract to the low bidder, Terra -Cal Construction, in the amount of $332,252.58. Authorize construction inspection expenditures through Willdan Associates not to exceed $55,000. Authorize the City Manager or his designee to approve all documents relating to these contracts. 3. Authorize staff to negotiate the additional work described in the body of the report, and authorize an appropriation of $365,000 to Project 99-059 Account No. 10001455. REP-.FDN:cac prlplandev09059Wg ca C2 " N e " J � 7 O qq pp 61 i " Z CANYON PROJECT LOCATION — Q