HomeMy WebLinkAbout1997-06-24 - AGENDA REPORTS - VALENCIA BLVD BICYCLE BRIDGE (2)AGENDA REPORT
City Manager Approval
Item to be presented by:
Rick Putnam
CONSENT CALENDAR
DATE: June 24, 1997
SUBJECT: VALENCIA BOULEVARD BICYCLE BRIDGE
PROJECT NO. 99-047-01- BID AWARD
DEPARTMENT: Parks, Recreation, and Community Services
M3;I�eT;I•i �. �
On May 13, 1997, City Council authorized the advertisement of Project 99-047-02. This project
consists of the construction of a bicycle bridge adjacent to the west side of the existing Valencia
Boulevard Bridge near Creekside Road, as part of a regional trail system called the Santa Clara
River Trail (see attached project map).
The Engineers Estimate for this project was $286,278. The following bids were received by the
City Clerk on June 12,1997:
Stevens Construction
Los Angeles Engineering
B&P Group
Oberg Contracting
Gerstenberger Construction
Heritage Engineering
Lancaster
$299,400.00
Rosemead
$336,263.25
Los Angeles
$365,982.20
Simi Valley
$383,386.10
Canyon Country
$416,388.19
Ontario
$421,359.10
This project (as well as the adjacent trail Project No. 99-047-02) are being made possible
through a combination of PFA, Proposition 116, Proposition C, and Developer funds.
Appropriate accounts have been established for both this project and the trail project under
master account no. 80001. Sufficient budget, including a 15% contingency for unforseen
conditions, is available in the project account to award construction of this project.
That Council award a contract to the low bidder, Stevens Construction, in the amount of
$299,400 and authorize a contingency expenditure of 15% for unforseen conditions. Authorize
the City Manager or his designee to approve all documents relating to this contract, and to
execute all licenses, agreements, and easements related to this project. Authorize Los Angeles
County Public Works or their designated representative to perform inspection, survey, and
testing services related to this project not to exceed $58,000.
iRP'U 9WE0 Agenda Item; a
Project Map
REP:KDN:ltk
prI plan de N 9904 7-0 11 ag_ca 02
PROJECT LOCATION
2
" MRAM" PORTION TO 9E CON=E=-
-UNDER SEPARATE CONTR.aCi
PROJECT K-�P