HomeMy WebLinkAbout1997-02-25 - AGENDA REPORTS - WILEY CYN ROAD (2)I:C %1,fes D1111:� City Manager Approval *,— Item to be presented by: T. Brad Therrien CONSENT CALENDAR DATE: February 25, 1997 SUBJECT: WILEY CANYON ROAD REALIGNMENT PROJECT NO. 72020 AWARD DESIGN CONTRACT DEPARTMENT: Building & Engineering Services The realignment of Wiley Canyon Road from Lyons Avenue to Calgrove Boulevard has been identified in the City's General Plan. Three possible alignments have been studied for construction. Two of the three alignments will result in major impacts on the property located on the west side of the road, while the third alignment will require massive grading of the hill on the east side of the roadway. The estimated cost for this project is between $11 million and $13 million and is identified as an unfunded project in our Five -Year Capital Improvement Program. In response to community input and Council direction, staff investigated interim solutions to this problem stretch of roadway. This proposal consists of the realignment of Wiley Canyon Road from Powell Drive to Fourl Road. This interim realignment will eliminate the "S" curve, thus enhancing traffic safety along that segment of Wiley Canyon Road. The total estimated cost for this work is $1 million. On December 5, 1996, 11 firms submitted written proposals to the City. Staff evaluated all proposals and interviewed the firms listed below in accordance with the requirements detailed in the Request for Proposals. ° gp$a a° , p �« slx as14 a:"�®����� SIMILAR e e m 11y�fj v '" v - 598ANd r. ti 4 pa&p� d YAR t HPppd pd Et a ` an aro. pPtiv ab amry.Q A RR b P '� J.,dVS S yg °a �pNM*�T 5" p Wd 63 �p 9a9a Qi�`Ai IF'ICATIONSe, s4�.aa&epinae r$vv C'FF ese ma �: [3� ve.ese 0 e tleberi nemro as Rr&e s <:% ees> 3Z a000111_ a ipm@ r e .eeevewmuAem W Boyle Engineering Corporation Ventura Yes ASL Consulting Engineers Irvine Yes Moffatt & Nichol Engineers Ventura Yes HDR Engineering Inc. Irvine Yes Agenda Item: -,.i, WILEY CANYON ROAD ALIGNMENT STUDY PROJECT NO. 72020 - AWARD DESIGN CONTRACT February 25, 1997 - Page 2 Staff determined that Boyle Engineering Corporation was best qualified to fulfill the City's needs for this project. The cost will not exceed $140,000. Therefore, staff recommends awarding the contract to Boyle Engineering Corporation. An amount of $179,555 in TDA funds has been budgeted in Account No. 72020204 for this project. In order to construct the project, it is estimated that an additional $850,000 will be requested in next year's budget. Sufficient funds are available for the design phase of the contract. 1. The City Council approve the award of the design services contract for the Wiley Canyon Road Realignment Project to Boyle.Engineering Corporation, in an amount not to exceed $140,000. 2. The City Council authorize the City Manager or his designee to approve all documents relating to this design contract. ATTACHMENTS Location Map Site Map RM:MC-aj' mooch%WILYALN.MC �1 NOT TO SCALE LOCATION' MAP Iw \ If WLEY CANYON ROAD RECONSTRUCTION BovtE En6-D7eERJl70 C9/4P42RFMCX7 CITY CF SAMA CLARUTA 1 h SDS+LE Eras+rEaRfrG cL'RPaRfiTJcn 7, PIG BIWA, I 1 i WILEY CANYON ROAD RECONSTRUCTION CITY OF SANTA CLARITA