CONSENT CALENDAR
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager
Item to be pre,
DATE: September 22, 1998
SUBJECT: CITYWIDE SIDEWALK REPLACEMENT AND ACCESS RAMP
INSTALLATION — (PROJECT NO: PWS -4) -PROJECT ACCEPTANCE
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
City Council accept the work performed by C.A. Rasmussen, Inc. on the repair work completed
on damaged sidewalks, curb, gutter, driveway approaches, and pedestrian access ramps.
Approve a budget transfer in the amount of $21,368.58 from Account No: 5211-8061 to Account
No.S0010201-8001 to cover the cost of additional improvements performed. Direct the City
Clerk to file the attached Notice of Completion. Direct staff to release the 10% retention 35
days after the Notice of Completion is recorded, provided no stop notices, as provided by law,
have been filed.
On June 24, 1997, Council awarded a contract for the subject project to C.A. Rasmussen, Inc.
This project implemented.two of the City's annual sidewalk and access ramp programs. The
first program repaired damaged sidewalks, curb, gutter, driveway approaches, and pedestrian
access ramps that were damaged due to street tree root lifting and other causes. The contract
replaced damaged public improvements, which had either been reported by residents or
identified by City staff. The second program installed new pedestrian access ramps throughout
the City.
Priority for the new installations was given to existing transit routes and routes heavily used
by children going to and from school. The proposed repairs and new access ramp installations
were located throughout the City. During construction, additional repair needs were identified
in areas adjacent to the contractor's work and were repaired at the same time. The additional
work could have been postponed to the next fiscal year; however, it was deemed more beneficial
to perform the work at this time.
After three months of discussions, staff and C.A. Rasmussen, Inc. avoided a costly claim by
negotiating quantities and prices for additional work discovered during construction. All work
was completed to the satisfaction of the City Engineer on July 20, 1998. This project was
completed on schedule and within the adjusted budget.
°tu'J�tD Agenda Item: L1
A.
CITYWIDE SIDEWALK REPLACEMENT AND ACCESS RAMP INSTALLATION —
(PROJECT NO. PWS -4) — PROJECT ACCEPTANCE
September 22, 1998 — Page 2
ALTERNATIVE ACTIONS
No alternative actions identified by staff.
Iy�YN�itlUi�[�1
Total budget for this project was $269,725.00; however, due to additional improvements
performed, the actual cost was increased by $49,596.00. A budget transfer from Account
No. 5211-8061, Street Maintenance, Curb and Sidewalk is funding this additional amount. The
total cost for this project was $319,321.00, which includes staff time, design, and survey costs.
Notice of Completion
RPN:mrr
counci1%psw2acc.rpn
RECORDING REQUESTED BY:
City of Santa Clarita
Transportation and Engineering Services Department
WHEN RECORDED, MAIL TO:
Sharon L. Dawson, CMC, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 301
Santa Clarita, CA 91355-2196
RECORDING FEES EXEMPTED
G.C. • 6103 AND 27383
144, 6IN& ,01.1a]'L"-11VJWLA
Space Above This Line For Recorder's Use
NOTICE OF COMPLETION
1. The City of Santa Clarita, a municipal corporation, is the owner in fee, except forthe
right-of-way upon which it has been constructed, of a certain public improvement known
as CITYWIDE SIDEWALK REPLACEMENT AND ACCESS RAMP INSTALLATION —
PROJECT NO. PWS -4.
2. The City's address is 23920 Valencia Boulevard, Suite 300, Santa Clarita, California
91355-2196.
3. The general location of said public improvement is multiple locations within the City of
Santa Clarita.
4. On September 11, 1997, a contract to construct said public improvement was awarded to
C.A. Rasmussen, Inc., Antelope Valley Division, 1111 West Avenue L-12, Suite B,
Lancaster, California 93534.
5. Work under said contract was completed on July 20, 1998, to the satisfaction of the City
Engineer, and was accepted by the City on September 22, 1998.
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I have read the foregoing Notice of Completion and know its contents. I am the City Clerk of
the City of Santa Clarita and am authorized to make. this verification for and on its behalf, and
I make this verification for that reason. I am informed and believe and on that ground allege
that the matters stated in the foregoing document are true. I declare under penalty of perjury
under the laws of the State of California that the foregoing is true and correct.
Sharon L. Dawson, CMC, City Clerk
City of Santa Clarita
RPN:mrr
counci1\psw2acc.rpn
Date