Loading...
HomeMy WebLinkAbout1998-03-24 - AGENDA REPORTS - EL NINO 1998 (2)CONSENT CALENDAR DATE: March 24, 1998 AGENDA REPORT City Manager Approval: Item to be presented by SUBJECT: EL NINO 1998 EMERGENCY STORM REPAIRS - PROFESSIONAL SERVICES CONTRACT AND CONSTRUCTION SERVICES CONTRACT DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council ratify the contract entered into by the City Manager with Harris & Associates, under the authority of the California State Public Contract Code, Section 22035, Emergencies Procedure. Ratify the contract entered.into by the City Manager with Oberg Contracting Corporation, under the authority of the California State Public Contract Code, Section 22035, Emergencies Procedure. BACKGROUND The purpose of this report is to request Council ratification of both the professional services contract with Harris & Associates for field engineering and construction management, and the construction contract with Oberg Contracting Corporation for emergency storm repairs, which the City Manager entered into under the authority of the California State Public Contract Code, Section 22035, Emergencies Procedure. This project involves the design, construction management, and construction of emergency capital improvement repairs necessary due to storm damage caused by El Nifio 1998. The scope of the work consists of repairs to the South Fork of the Santa Clara River and Santa Clara River trails and embankments, bridges, slope failures, bank erosions, and streets. The emergency repairs need to be made with the utmost urgency before additional storms further destroy the City's already damaged infrastructure. (The repairs to the Bouquet Canyon Road bridge performed by Los Angeles County will be covered by a separate agreement between the City and County.) On Friday, February 27, 1998, City staff received qualifications and hourly wage rates from three different consultants: Harris & Associates HDR Engineering, Inc. Willdan Associates, Inc. Los Alamitos, California Irvine, California Anaheim, California The design and construction management services for the project have been awarded to Harris & Associates based on their qualifications and prior emergency repair experience they have had with the City of Santa Clarita. Their fee will be based on actual time and materials in accordance with the attached wage rate schedule. The engineering, inspection, and project management costs are estimated to be approximately $130,000. gppROWED Aglen1a Iteam-LI EL NINO 1998 - EMERGENCY STORM REPAIRS PROFESSIONAL SERVICES CONTRACT March 24, 1998 - Page 2 Also on Friday, February 27, 1998, City staff received labor wage rates and equipment wage rates from three different contractors: Oberg Contracting Corporation CalEX Engineering Company C.A. Rasmussen, Inc. Simi Valley, California Santa Clarita, California Lancaster, California The emergency construction repair work has been awarded to Oberg Contracting Corporation due to their wide range of in-house construction capabilities, their ability to immediately move in on the project, and their prior experience with the City of Santa Clarita on related construction projects. Their fee will be based on actual time and materials in accordance with the attached wage rate and equipment rental rate schedules. The construction costs are estimated to be approximately $400,000. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT $650,000 has already been appropriated for El Nino Emergency Response Expenditures. ATTACHMENTS 1998 El Nino Storm Budget Harris & Associates - Hourly Wage Rate Schedule Oberg Contracting Corporation - Labor Wage Rate and Equipment Rental Rate Schedules BEJ:vjj �wa�t�aent.a�c ATTACHMENT 1998 EL NINO STORM BUDGET Appropriate $650,000 from City Council Contingency Account #1240-7401 to accounts as follows: Category A: E0101001-8001 Debris Removal -Golden Bear Category B: E0201001-8001 Emergency Protective Measures - 65,000 Citywide E2202001-8001 Calgrove Barricade E2203001-8001 South Fork Trail Embankment E2204001-8001 San Fernando Rd @ Pine Street E2205001-8001 Creekview Park - Bank Erosion E3206001-8001 Sand/Iron Cyn Rd. E4207001-8001 Bouquet Canyon Bridge Repair (temp) Category C: $ 10,000 29,000 13,000 6,000 50,000 40,000 20,000 250,000 E4302001-8001 Santa Clara River Trail 65,000 E3303001-8001 Sierra Hwy S. of Eternal Valley 20,000 E3304001-8001 Sierra Hwy Slope 20,000 E4305001-8001 Hob St. @ Bouquet - Bridge 25,000 E3306001-8001 Santa Clara River Trail/Luther 50,000 E3307001-8001 Santa Clara River Trail/Mint Cyn. 20,000 Category E: E3501001-8001 Canyon Country Park -Slope Failure 5,000 E3502001-8001 Canyon Country Park Bldg. Roof 10,000 E1503001-8001 Corporate Yard - Roof 7,000 Category F. E2601001-8001 Culvert @ Towsley 10,000 TOTALS: 650.000 FE2727-98 FRI 02:35 PH Mr. Anthony t. Xisici City orsznia ciarita 1'ebnmy 27, 1998 pagc 2 HARRIS & ASSOCIATES FAX N0. 5108275478 P. -03 Jim Guerrero, PL Project _Manager X $140 30 Ramiro Herrera Essr. Projecr Manager X $115 20 Dave Tiberi, PE, Consiruciion Engineer Y 5115 40 Michelle Leonard, PE Contraction Engineer Consrruction Engineer $ 70 40 Jim Thompson fnspccior,?echxiciun Lupcctar/Itchnicimr $ 30 40 John Johnson Inspector,"Technician X S85 40 Kim Foss administrative Support Jnspecror/Technician $ 35 sq 240 Dave Bruett InsfsecwP17'echnician TOTAL: 250 Cost Estimatillo Miguel Calixto Inspecior/Technician S70 Jim Guerrero, PE Froject_k'anager x $140 40 Is= Dee, VES Cos, Fstimator K Si.15 20 Sam Fr.mpong, PE Cast Estimcuor S95 40 David Stuetzel, PF. Design :Clanger 5115 80 Noel Zenila, ?E Destgn Engineer S90 80 Kim Foss Adminisiralive Support S 35 60 TOTAL: 320 Construction Phase (6 weeks assumption Jim Uuerrero, PE 1'rojectd9arager X $140 120. Rsrniro He cera Asst. Froject iVanager Y 5115 80 Dave Tiberi, PE Consrruction Engineer S 115 240 Jim Thompson Lupcctar/Itchnicimr S80 240 Jelm Johnson fnrpector/Teehnician X $ 85 240 Niel Looker Jnspecror/Technician X $ 90 240 Dave Bruett InsfsecwP17'echnician X S90 240 Miguel Calixto Inspecior/Technician S70 240 K. Foss Adntlrsistrutive Support $ 35 iDml TOTAL: 1,940 14arris' team is ready and available to meet the emergency needs of the City of Santa Clarita. We are pmpared to provide you with responsive, flexibile and experienced individuals torepairthe damages incurred from the 1998 El Nino sterns. Sinceroly, Harris & Associates, Inc_ /J nes 'ue en -o' P.E. Associat.. CLASSIFICATION Laborer - Gr 1 Laborer - Gr 2 Laborer- Gro Laborer Foreman >4 Bridge Carpenter Carpenter Apprentice 5 ST"GARO LABOR RATES - CITY OF SANTA CLARITA -. RATES EFFECTIVE AS OF JULY 1, 1997 LABOR BURDEN BASE RATE UNION TAXES, SUBTOTAL MARK-UP LABOR PLUS VAC FRINGES INSURANCE COST @ 20 % TOTAL BENEFIT 6 MISC ST OT @1.5x OT @ 2x ST OT @1.Sx OT @ 2x ST OT @1.5x OT @ 2x ST OT @1.Sx OT @ 2x ST OT @1.5x OT @ 2x ST OT @1.5x OT @ 2x Carpenter Foreman ST OT @t.Sx OT @ 2x Cement Mason ST 629 OT @1.Sx 6.65 OT @ 2x Cement Mason Apprentice 8 ST 7.67 OT @1.Sx 8.67 OT @ 2x Cement Mason Foreman ST 9.05 OT @1.5x 10.69 OT @ 2x Operating Engineer Apprentice 3 ST 6.42 OT @1.Sx 6.76 OT @ 2x Operating Engineer Gr 8 ST 7.83 OT @1.5x 8.82 OT @ 2x Operating Engineer Gr 9 ST OT @1.5x OT @ 2x 19.62 7.35 629 3326 6.65 39.91 28.34 7.35 7.67 43.36 8.67 52.03 37.05 7.35 9.05 53.45 10.69 64.14 20.02 7.35 6.42 33.79 6.76 40.55 28.94 7.35 7.83 44.12 8.82 52.95 37.85 7.35 924 54.44 10.89 65.33 21.27 7.35 6.82 ' 35.44 7.09 42.53 30.81 7.35 8.33 46.49 9.30 55.79 40.35 7.35 9.84 57.54 11.51 69.05 2227 7.35 7.14 36.76 7.35 44.11 32:31 7.35 8.73 48.39 9.68 58.07 42.35 7.35 10.32 60.02 12.00 72.03 25.45 4.87 8.16 38.48 7.70 46.17 37.89 4.87 10.13 52.89 10.58 63.47 50.33 4.87 12.10 67.30 13.46 80.76 18.59 4.87 5.96 29.42 5.88 35.30 27.60 4.87 7.39 39.86 7.97 47.83 36.61 4.87 8.82 50.30 10.06 60.35 26.95 4.87 8.64 40.46 8.09 48.55 40.14 4.87 10.73 55.74 11.15 66.89 53.33 4.87 12.82 71.02 1420 8522 23.18 8.48 7.43 39.09 7.82 46.91 33.31 8.48 9.04 50.83 10.17 60.99 43.44 8.48 10.64 62.56 12.51 75.07 21.15 8.48 6.78 36.41 728 43.69 3027 8.48 823 46.98 9.40 56.37 39.38 8.48 9.67 57.53 11.51 69.04 24.18 8.48 7.75 40.41 8.08 - 48.49 34.81 8.48 9.44 52.73 10.55 63.27 45.44 6.48 11.12 65.04 13.01 78.05 20.01 8.08 6.41 34.50 6.90 41.41 29.02 8.08 7.64 44.94 6.99 53.93 38.02 8.08 927 55.37 11.07 66.44 27.84 8.08 8.92 44.84 8.97 53.81 40.76 8.08 10.97 59.81 11.96 71.77 53.68 8.08 13.02 74.78 14.96 89.74 28.30 8.08 9.07 45.45 9.09 54.54 41.45 8.08 11.16_ 60.69 12.14 72.82 54.60 8.08 13.24 75.92 15.18 91.10 Operating Engineer Foreman ST 29.30 8.08 9.39 46.77 9.35 56.13 OT@1.5x 42.95 8.08 11.56 62.59 12.52 75.10 OT @ 2x 56.60 8.08 13.72 78.40 15.68 94.08 Teamster Gr 5 ST 22.30 9.39 7.15 38.84 7.77 46.61 OT@1.5x 32.15 9.39 8.71 50.25 10.05 60.30 OT @ 2x 42.00 9.39 1027 61.66 12.33 73.99 ONE PERCENT BOND ALLOWED ISNOT INCLUDED IN LABOR RATES. TAXES. INSURANCE d MISC. INCLUDES: FICA, MEDICARE, SUI, FUTA, SMALL TOOLS ALLOWANCE AND PAYROLL BASED INSURANCES. OCOY.ERG CONTRACTING Ca. CUSTOMER EQUIPMENT RENTAL RATES JULY 1, 1997 THRU JUNE 30,1998 DESCRIPTION CODE RATES 1. LOADERS & BACKHOES a. JOHN DEERE 310C BACKHOE W/ 4WD, 4/1 O&M _ $ 80.00/HR b. JOHN DEERE 210C SKIPLOADER W/ GANNON, 4WD, 4/1 BUCKET 0&M $ 77.00/HR FORKLIFT ATTACH. BARE $ 8.00/DAY c. CATERPILLAR 950F WHEEL LOADER O&M $102.00/HR GRIZZLEY BUCKET BARE $ 14.00/HR d CATERPILLAR 235C TRACK HOE O&M $155.00/HR 2. TRACK DOZERS a. CATERPILLAR D6HR DOZER W/ SLOPE O&M $122.00/HR b. JOHN DEERE 45OG DOZER W/ SLOPE 0&M $ 90.00/HR 3. TRUCK CRANE a. NATL. 556B CRANE/BOOM TRUCK O&M $ 80.00/HR b. P&H 45 TON CONVENTIONAL CRANE O&M $ 190.00/HR a. CHEVY 2000 GAL. O&M $ 60.00/i4R 5. FLATBED TRUCKS a. FORD 2.5T DUMP W/WATER TANK BARE $ 25.00/HR b. DODGE LUBE TRUCK BARE $ 20.00/HR c. FORD FLATBED W/ LIFTBED BARE $ 20.00/HR d INTERNATIONAL FLATBED BARE $ 20.00/HR 6. VEHICLES a. PICKUPS NON OP $ 8.00/HR b. 4X4 SUBURBAN NON OP $10.00/HR Page 1 of 3 OBERG CONTRACTING CORP. DESCRIPTION CODE RATES 7. AIR COMPRESSORS a. ELECTRIC NON OP $ 40.00/DAY b. 185 CFM NON OP $125.00/DAY 8. GENERATORS a. 5KW NON OP $ 40.00/DAY b. HICYCLE W/2 VIBS. NON OP $ 72.00/DAY c. MULTIQUIP 6000 HICYCLE- NON OP $ 72.00/DAY d MULTIQUIP 5000 HICYCLE NON OP $ 80.00/DAY 9. COMPACTORS a. WACKER VIBRAPLATE NON OP $ 80.00/DAY b. BOMAG RAMMER NON OP $ 80.00/DAY c. SHEEPSFOOT, DOUBLE 4X4 TOWED BARE $100.00/DAY e RAMMAX P33 NON OP $175.00/DAY 1 131 a. 60' CONDOR BOOM LIFT w/4WD BARE $180.00/DAY 11. CONCRETE EQUIPMENT a. STONE 4CF CEMENT MIXER NON OP $ 40.00/DAY b. POWER TROWEL FINISHER NON OP $ 64.00/DAY c. BURKE CURE POWER SPRAYER NON OP $ 40.00/DAY & CONCRETE VIBRATOR, 110V. BARE $ 30.00/DAY e. BIDWELL SLOPE PAVER & DECK FINISHER. (QUOTE ON REQUEST) f. ALDEN HEAVY DUTY POWER SCREED (QUOTE ON REQUEST) g. DECK FINISHING BRIDGE (QUOTE ON REQUEST) h. JUDA / BUNYAN ROLLING FINISHER) (QUOTE ON REQUEST) i. MORGEN SIDE DISCHARGE PLACER 76' (QUOTE ON REQUEST) j. BORG HANGERS, PLATES (QUOTE ON REQUEST) k. BURKE OVERHANG BRACKETS BARE $132.00/WK Page 2 of 3 OBERG CONTRACTING CORP. DESCRIPTION CODE RATES 12. MISCELLANEOUS EQUIPMENT b. 35' VAN TRAILER a. CONCRETE SCRABBLER BARE $125.00/DAY b. DeWALT TABLE SAW BARE S 8.00/DAY d. 8X20 STORAGE CONTAINER + SETUP $ c. CHIPPING HAMMER WRITS 8X8 STORAGE SHEDS /CONEX BARE $ (AII /ELETRIC) BARE $40.00/DAY d PAVEMENT BREAKER WRITS (AIR) BARE S 60.00/DAY e. LB -1 LASER LEVEL W/SENSOR BARE $100.00/DAY AUTOMATIC LEVEL, TRIPOD & LINKER ROD BARE $ 25.00/DAY f. QUIKIE DEMO SAW BARE $150.00/DAY g. WATER MONITOR w/100' hose BARE $ 60.00/DAY h. WACKER TRASH PUMP BARE $ 90.00/DAY i. BOMAG RAMMER BARE S 65.00/DAY j. BACKPACK VIBRATOR BARE S 30.00/DAY k. PRESSURE WASHER BARE $ 30.00/DAY I. EPDXY INJECTION MACHINE BARE $200.00/DAY 13. OFFICES / VANS / STORAGE CONTAINERS a. 12X63 OFFICE TRAILER BARE S 20.00/DAY b. 35' VAN TRAILER BARE $ 4.00/DAY c. 8X40 STORAGE CONTAINER BARE $ 12.00/DAY d. 8X20 STORAGE CONTAINER BARE $ 8.00/DAY e. 8X8 STORAGE SHEDS /CONEX BARE $ 4.00/DAY f. 550 GAL. TANK w/hoses BARE $ 8.00/DAY g. CARGO BIN BARE $ 8.00/DAY NOTES: 1. 2. 3. 4. 5. 6. 0&M = OPERATED AND MAINTAINED. NON OP = OPERATORS RATE NOT INCLUDED. BARE = EQUIPMENT ONLY. NO OPERATOR OR MAINTENANCE. OPERATED RATES ARE STRAIGHT TIME ONLY. OVERTIME, TRAVEL TIME AND SUBSISTENCE WILL BE ADDED AS APPLICABLE ALL RATES PLUS MOVE -IN AND MOVE -OUT AS APPLICABLE. LISTING OF A PIECE DOES NOT GUARANTY AVAILABILITY. Page 3 of 3