HomeMy WebLinkAbout1998-08-25 - AGENDA REPORTS - INFRASTRUCTURE PROJ RESULTS (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manager Approv 1 Item to be presented by: Kerry Breyer DATE: August 25, 1998 SUBJECT: 1997-98 & 1998-99 ANNUAL INFRASTRUCTURE PROJECTS — BID RESULTS DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION The City Council ratify the contract entered into by the City Manager with Excel Paving Company under the authority granted by Council on July 14, 1998. Project Name Proiect No. Account Nos. 1997-98 Annual Overlay Program M0002 - M0002205, M0002455 1997-98 Annual Slurry Program M0003 M0003103, M0003201, M0003455 1997-98 Annual Access Ramp Construction T0006 T0006103 1997-98 Annual Curb & Gutter Repair . M0004 M0004052 1997-98 Annual New Sidewalk Program T0007 T0007103 1998-99 Annual Sidewalk Repair PWS -5 5211-8061 1997-98 Annual Median Modifications C0013 C0013455 North Oaks Park — Parking Lot Pavement Rehab. N/A 5100-8001/8110 Santa Clarita Park — Parking Lot Pavement Rehab. N/A 5100-8001/8110 1998-99 Annual Overlay Program M0027 M0027001, M0027205 1998-99 Annual Slurry Program M0028 M0028001 1998-99 Annual Access Ramp Construction T0011 T0011201 1998-99 Annual Curb & Gutter Repair M0026 M0026456 1998-99 Annual New Sidewalk Program T0012 T0012201 1998-99 Annual Sidewalk Repair PWS -6 5211-8061 Orchard Village Traffic Signal Interconnect C2014 C2014001 16th Street Sidewalk Installation LMD177 7515-8001 BACKGROUND Bids were received -by the City Clerk's office on July 23, 1998. Ordinarily after a bid opening, staff prepares a bid summary and verifies ,the following: licensing of the low bidder; financial condition of the surety company; bid bond; and references on past projects. Staff then prepares an agenda report recommending that Council award a contract to the lowest responsible bidder. However, the schedule of this project conflicted with Council's 1997-98 & 1998-99 ANNUAL INFRASTRUCTURE PROJECTS — BID RESULTS August 25, 1998 — Page 2 summer recess. In an effort to keep this project.on schedule, Council granted authority on July 14, 1998 to the City Manager to sign the contract with the lowest responsible bidder. This report is an update of the bid results. The Engineer's Estimate for construction of this project was $4,285,000.00. The low bid was $4,092,472.70 by Excel Paving Company. The results of the bids are attached as Exhibit "A." Excel Paving Company of Long Beach possesses a State Contractor's License and is in good standing with the State.Contractors' License Board. References and past projects with the City have indicated satisfactory work performance by this contractor. The above projects were combined and bid as one project. By doing this, the City expected to receive lower construction bids and reduce inconvenience to the public. For comparison purposes, Exhibit `B" includes a summary of unit prices bid on this project versus past annual projects where the projects were bid and constructed separately: As anticipated, lower bid prices were received by combining the projects. ALTERNATIVE ACTIONS Other action as determined by Council. FISCAL IMPACT The total combined budget of these projects is $4,591,522.00. The Engineer's Estimate for construction was $4,285,000.00 and the low bid is $4,092,472.70. Sufficient funds are available in the designated accounts. ATTACHMENTS Bid Results, Exhibit "A" Bid Comparison, Exhibit "B" KB:mrr s:\tes\wunci1\m0003\award1.doc ,!, 1997-98 & 1998-99 ANNUAL INFRASTRUCTURE PROJECTS BID RESULTS Comnanv Location Bid Excel Paving Company Granite Construction Company R.C. Becker & Son, Inc. KB:mrr s:\tes\council\m0003\awa dLdoc Long Beach, CA Watsonville, CA Newhall, CA $ 4,092,472.70 $ 4,130,289.00 $ 4,967,842.49 Item Cold Mill Conventional Asphalt Rubberized Asphalt Type II Slurry Chip Seal Adjust Manhole to Grade Install Traffic Loop Detectors Construct Access Ramp Construct New Sidewalk Remove & Replace Sidewalk Remove & Replace Curb & Gutter Remove & Replace Driveway Apron Item Cold Mill Conventional Asphalt Rubberized Asphalt Type II Slurry Chip Seal Adjust Manhole to Grade Install Traffic Loop Detectors Construct Access Ramp Construct New Sidewalk Remove & Replace Sidewalk Remove & Replace Curb & Gutter Remove & Replace Driveway Apron s-.VeMeng-civsm0003Xb1dcampl.xls 1997-98 & 1998.99 Annual Infrastructure Projects Quantity 70,450 SY 18,282 TON 17,250 TON 1297 ELT 852,535 SF 180 EA 181 EA 107 EA 40,570 SF 27,514 SF 7629 LF 9017 SF Bid Price $1.00 $31.70 $49.80 $100.00 $0.28 $184.00 $290.00 $500.00 $2.50 $2.60 $16.00 $3.10 1997.98 & 1998.99 Annual Infrastructure Projects Ouantity 70,450 SY 18,282 TON 17,250 TON 1297 ELT 852,535 SF 180 EA 181 EA 107 EA 40,570 SF 27,514 SF 7629 LF 9017 SF Bid Price $1.00 $31.70 $49.80 $100.00 $0.28 $184.00 $290.00 $500.00 $2.60 $2.60 $16.00 $3.10 EXHIBIT B BID COMPARISON Annual Overlay 1996-97 Quantity Bid Price 88,833 SY $1.44 7885 TON $35.00 20,875 TON $45.00 42 EA $300.00 70 EA $320.00 56 EA $1,400.00 1130 SF $5.00 1735 LF $30.00 536 SF $4.00 Annual Sidewalk, C& 1996.97 Quantity id Price 1 EA $700.00 21,962 SF $4.60 684 LF $25.00 2615 SF $4.60 1995-96 QuantitV Bid Price 24,068 SY $1.08 8088 TON $48.00 29 EA $200.00 46 EA $250.00 20 EA $1,200.00 3 & Access Ramps 1995.96 Quantity Bid Price 11 EA $550.00 . 9092 SF $3.50 20 LF $25.00 1487 SF $4.50 Annual Slurry 1996.97 1995-96 Quantity Bid Price Quantity Bid Pric 1829 TON $88.84 1502 TON $78.00 ?40,546 SF $0.36 1000,447 SF $0.46 v Sidewalk 1994-95 Quantity id Price 7 EA $700.00 40,810 SF $2.50 z Annual Ne 1996.97 Quantity Bid Price 2 EA $400.00 2 EA $500.00 1790 SF $2.50 v Sidewalk 1994-95 Quantity id Price 7 EA $700.00 40,810 SF $2.50 z