Loading...
HomeMy WebLinkAbout1998-07-14 - AGENDA REPORTS - INFRASTRUCTURE PROJECTS (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR City Manag pproval Item to be presented by: Christopher C. Price DATE: July 14, 1998 SUBJECT: 1997-98 AND 1998-99 ANNUAL INFRASTRUCTURE PROJECTS - AWARD CONTRACT DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council authorize the City Manager to enter into a contract for the 1997-98 and 1998-99 Annual Infrastructure Projects with the low bidder and authorize a 15 percent contingency expenditure. The funds have been budgeted in FY 1997-98 and FY 1998-99 in the accounts listed below. Authorize the City Manager or his designee to execute and sign all documents, subject to City Attorney approval. Proiect Name Project No. Account Nos. 1997-98 Annual Overlay Program M0002 M0002205 and M0002455 1997-98 Annual Slurry Program M0003 M0003103, M0003201, and M0003455 1997-98 Annual Access Ramp Construction T0006 T0006103 1997-98 Annual Curb & Gutter Repair M0004 M0004052 1997-98 Annual New Sidewalk Program T0007 T0007103 1998-99 Annual Sidewalk Repair PWS -5 5211-8061 1997-98 Annual Median Modifications C0013 C0013455 North Oaks Park — Parking Lot Pavement Rehab. N/A 5100-8001/8110 Santa Clarita Park — Parking Lot Pavement Rehab. N/A 5100-8001/8110 1998-99 Annual Overlay Program M0027 M0027001, M0027205 1998-99 Annual Slurry Program M0028 M0028001 1998-99 Annual Access Ramp Construction T0011 T0011201 1998-99 Annual Curb & Gutter Repair M0026 M0026456 1998-99 Annual New Sidewalk Program T0012 T0012201 1998-99 Annual Sidewalk Repair PWS -6 5211-8061 Orchard Village Traffic Signal Interconnect C2014 C2014001 16th Street Sidewalk Installation LMD177 7515-8001 Argentla Item: 1997-98 AND 1998-99 ANNUAL INFRASTRUCTURE PROJECTS — AWARD CONTRACT July 14, 1998 — Page 2 BACKGROUND On June 23, 1998, Council authorized the advertisement for bids for these projects. Bids will be received by the City Clerk's office on July 23, 1998. Ordinarily after a bid opening, staff prepares a bid summary, verifies that the low bidder is licensed, checks his surety company, bid bond, and references for reputation on past projects, and prepares an agenda report recommending that Council award a contract to the lowest responsible bidder. However, the schedule of this project conflicts with Council's summer recess. In an effort to keep this project on schedule and complete construction during the dry summer and fall months, staff requests that City Council grant authority to the City Manager to sign the contract with the lowest responsible bidder. On August 25, 1998, staff will update Council on the bid results and ask Council to ratify the contract entered into by the City Manager. The engineer's estimate for construction of this project is $4,285,000.00. Construction is scheduled to begin in early August 1998, with an anticipated completion date of October 1998. The Annual Overlay project will resurface various streets throughout the City to provide a smoother ride for traffic, enhance the appearance of the area, and extend the economic life of the roadway. The Annual Slurry project will seal surface cracks, enhance skid resistance properties, and increase pavement life. The Annual Access Ramp Construction project will install pedestrian access ramps in high - demand areas of the City, including transit routes, parks, schools, and hospitals, as required by the Americans with Disabilities Act (ADA). The Annual Curb and Gutter Repair program will install new curb and gutter at various locations throughout the City where flowline problems exist. Locations were selected based on citizen requests and staff observations. The Annual New Sidewalk project will install sidewalks at various locations within the City where none currently exist. The primary focus is in areas with high pedestrian usage and along pedestrian routes associated with the Suggested Route -to -School Program. This program helps reduce the City's liability by providing designated pedestrian routes. The Annual Sidewalk Repair project will repair damaged sidewalks at various locations throughout the City. Locations were selected based on citizen requests and staff observations. The Annual Median Modification project will alter medians to allow more efficient traffic flow by reducing congestion, creating safer turning lanes, and restricting adverse traffic patterns. Locations were selected based on citizen requests and staff observations. 1997-98 AND 1998-99 ANNUAL INFRASTRUCTURE PROJECTS — AWARD CONTRACT July 14, 1998 — Page 3 North Oaks Park and Santa Clarita Park Parking Lot Pavement Rehabilitation projects will resurface the parking lots to improve the condition of the pavement and enhance the appearance of these parks. The Orchard Village Road Traffic Signal Interconnect project will improve traffic flow on Orchard Village Road by connecting the traffic signals and synchronizing their timing prior to overlay of the street. The 16th Street Sidewalk Installation project will install sidewalk on the south side of 16th Street between Avenida Ignacio and Newhall Avenue. ALTERNATIVE ACTIONS Alternative actions may delay the construction of this project. FISCAL IMPACT The total combined project budget of these projects is $4,591,522.00. The engineer's estimate for construction is $4,285,000.00. Sufficient funds are available in the designated accounts. KB:vjj e: \tee 1mural%m0003 \a..d.d.c