HomeMy WebLinkAbout1998-03-10 - AGENDA REPORTS - METROLINK VIA PRINCESSA (2)CONSENT CALENDAR DATE: March 10, 1998 City Manager Approval: Item to be presented by SUBJECT: VIA PRINCESSA METROLINK STATION IMPROVEMENTS PROJECT NO. T3007 DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council authorize the City Manager or his designee to execute the contract for engineering and architectural design services for the Via Princessa Metrolink Station, Project No. T3007, with Boyle Engineering Corporation in an amount not to exceed $20,000, plus $3,000 (15%) for contingency costs, subject to City Attorney approval. This project proposes to provide additional facilities to the Via Princessa Metrolink Station such as restroom facilities, shelterstcanopies, small plaza waiting area with minimal landscaping, and an improved entrance sign. When constructed, this station was built as a temporary station with very few amenities. Since the City's acquisition of the station site, residents and Metrolink users have made requests to provide the amenities at other stations. Boyle Engineering Corporation, the engineering firm selected to provide professional engineeringlarchitectural services, will design these facilities.. Each item will be listed as an option when bid, and dependant upon existing funding and bid prices, the items will be constructed. On October 6, 1997, a pre -qualification meeting was held with representatives from more than 35 companies that responded to a Request for Qualifications to design minor upgrades to the Via Princessa Metrolink Station. On October 22, 1997, qualifications were submitted by ten professional engineering(architectural teams. Four teams were selected for interviews following qualification review and evaluation by City staff and Southern California Regional Rail Authority (SCRRA) personnel, and are listed below: Boyle Engineering Corporation Ventura, California Daniel, Mann, Johnson, & Mendenhall (DMJM) Los Angeles, California Frederic R. Harris, Inc. San Pedro, California HDR Engineering, Inc. Irvine, California An interview panel consisting of staff from the Transportation & Engineering Divisions and SCRRA selected Boyle Engineering Corporation to provide the design services required for this project. Total costs to provide the engineeringlarchitectural services required for this project A P P PH 00 llufl F I Do ED VIA PRINCESSA METROLINK STATION IMPROVEMENTS March 10, 1997 - Page 2 are estimated to be $20,000, plus $3,000 (15%) for contingency costs. The fees would cover the following engineering/architectural services: design of restroom facilities, shelters/canopies, small plaza waiting area with minimal landscaping, and an improved entrance sign. ALTERNATIVE ACTIONS Other action as determined by the City Council, FISCAL IMPACT Funds in the amount of $165,000 from Account Nos. T3007103 and T3007205 have been budgeted in FY 1997/98 for this project. ATTACHMENTS Metrolink Station Exhibit BEJ:vjj ...ril\AR-T3007BE1 VIA PRINCESSA METROLINK STATION w F PRlNCESS4