Loading...
HomeMy WebLinkAbout1998-11-10 - AGENDA REPORTS - TRACT MAP 44360-01 (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: November 10, 1998 City Manager Approval: Item to be presented by: Lawrence P. Cushman SUBJECT: TRACT MAP NO. 44360-01 - APPROVAL OF THE FINAL MAP AND ACCEPTANCE OF OFFERS OF DEDICATION DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council approve Tract Map No. 44360-01; accept on behalf of the public the offers of dedication for the public streets, and easements for sewer purposes, and storm drain purposes; make findings as follows: (a) that this project is consistent with the provisions of Sections 66474, 66474.1, and 66474.6 of the Subdivision Map Act and should be approved, and (b) that this proposed subdivision, together with the provisions for this design and improvement, is consistent with the General Plan required by Article 5 (commencing with Section 65300) of Chapter 3 of Division 1 of the Government Code, or any specific plan adopted pursuant to Article 8 (commencing with Section 65450) of Chapter 3 of Division 1 of the Government Code; instruct the City Treasurer to endorse the Special Assessment Certificate on the face of the map for Tract Map No. 44360-01, which indicates that all special assessments levied by the City have been paid; and instruct the City Clerk to endorse the Certificate on the face of Tract Map No. 44360-01, which embodies the approval of said map and the acceptance of the dedications shown thereon. BACKGROUND Tract 44360-01 is the first of five phases of Tentative Tract Map No. 44360. Tentative Tract 44360 was granted approval by the Planning Commission on February 4, 1997. This phase, which is located on the north side of Isabella Parkway just westerly of Gilbert Drive, is owned by Isabella Investment Group. This phase includes 5.4 acres: Approximately 4.4 acres are for the public streets to serve the entire project (Phases One through Five) and the other one acre consists of two lots. Lot One is for the common recreation area and Lot Two is for the construction of five single-family residential condominium units. The conditions set by the Planning Commission have been met, and fees have been paid as indicated on the attachedFactSheet. The map has been checked to the satisfaction of the City Engineer. The map is ready for Council approval and acceptance of the dedications. QuooQ TRACT MAP NO. 44360-01— APPROVAL OF THE FINAL MAP AND ACCEPTANCE OF OFFERS OF DEDICATION November 10, 1998 — Page 2 ALTERNATIVE ACTIONS No alternative actions that would conform to requirements set forth in the Subdivision Map Act are identified by staff. FISCAL IMPACT All public infrastructure included as part of this project will be constructed at no cost to the City. Once the public sewers are accepted by the City, they will be maintained by the Los Angeles County Consolidated Sewer Maintenance District, and the funds for this maintenance will be included as an assessment collected with the property taxes. Once the storm drain system is accepted as complete, it will be transferred to the Los Angeles County Flood Control District for maintenance. All subdivision streets will be dedicated to the City. Once they are accepted by. the City, they will impact the City's Street Maintenance budget. The developer is contributing the following minimum amounts for the purposes described (refer to the attached Fact Sheet for details): Bridge and Thoroughfare Fees $28,000.00 Transit Mitigation Fee 1,000.00 Quimby Requirement 10,735.00 ATTACHMENTS Fact Sheet Vicinity Map LPC:lkl w=61144360 -01.d. I9►:[01WIf " DI WM Tract Map Location: South side of Isabella Parkway, westerly of Gilbert Drive. Acreage: Approximately 5.4 acres. Number of Lots: Two. Number of Units: Five. Developer: Isabella Investment Group, LLC, a California Limited Liability Company. Quimby Fees: The required Quimby fee of $10,735.00 has been paid. Road Fees: The required Bridge and Thoroughfare fee of $28,000.00 has been paid. Transit Fees: A Transit Mitigation fee of $1,000.00 has been paid. County Library Fee: The developer is paying $336.00 per unit to Los Angeles County as a mitigation measure due to impacts to the library system at the building permit stage. Road Improvements: All subdivision streets are to be public streets with full improvements including curb, gutter, sidewalk, and streetlights. School Fees: To be paid at building permit stage per agreement with the school districts. LPC:lkl munaX4436MLdw CITY OF SANTA CLARITA EXHIBIT 'Al ' ANGLE RO 3 i elf I mo OZ E I j y R Tract No; 44360-01 ROAC� LAIRS t' w I 1; Aurora lane 2SUladara Way 1-3 / 3) Ir Colina OrWo l QI TCravisLa CAurL J) Serrano Place TR. N0. 44380 � %ktNi;C SSA pL VICINITY MAP NO scar STOCAA GRAD/ Pea =A= NC d, Serrano Place ay d \ /� •, a ,pl a9 i dol 3 .� Ok TRACT Na 44360 KEY MAP U~