HomeMy WebLinkAbout1998-01-13 - AGENDA REPORTS - TRAFSIG WHITES CYN (2)AGENDA REPORT
CONSENT CALENDAR City Manager Approval
Item to be presented by:
Bahman Janka
DATE: January 13, 1998
SUBJECT: TRAFFIC SIGNAL AND INTERCONNECT INSTALLATION AT WHITES
CANYON ROAD/STEINWAY STREET AND BOUQUET CANYON
ROAD/CENTRAL PARK ENTRANCE - APPROVAL OF PLANS AND
SPECIFICATIONS AND ADVERTISEMENT FOR BIDS (PROJECT
NOS. C0012 AND C4001).
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
City Council approve the plans, specifications, and estimates (PS&E) and authorize the
advertisement for bids of the traffic signal and interconnect installation project at Whites
Canyon Road/Steinway Street and also for a traffic signal installation project at Bouquet
Canyon Road/Central Park Entrance.
BACKGROUND
At the regular June 24, 1997 City Council meeting, staff presented the results of the City's
Signal Priority List to Council. Based on the findings of this report, Council directed staff to
proceed with the installation of the traffic signal and interconnect installation at the
intersection of Whites Canyon Road/Steinway Street. Council allocated $220,000 to install this
traffic signal and interconnect in the 1997-98 fiscal year.
The City of Santa Clarita has planned to develop a park along the east side of Bouquet Canyon
Road at the property owned by Castaic Lake Water Agency (CLWA). As part of the lease
agreement between CLWA and the City for the proposed City's Central Park, the entrance
(ingress/egress) of the park at Bouquet Canyon Road shall be signalized before the start of
construction of Phase I improvements. Council allocated $140,000 from developer fees to install
this traffic signal in the 1997-98 fiscal year.
The two signalization projects will be combined as one project. The traffic signal plans,
specifications, and estimate for the intersection of Whites Canyon Road/Steinway Street and
Bouquet Canyon Road/Central Park Entrance have been prepared and will be available for
review in the offices of the City Clerk and the City Engineer.
A 0
0
Apnda
ReM
TRAFFIC SIGNAL AND INTERCONNECT INSTALLATION
January 13, 1998 - Page 2
ALTERNATIVE ACTIONS
None.
FISCAL IMPACT
Funds for the' installation of the traffic signal and interconnect for Whites Canyon
Road/Steinway Street and the traffic signal for Bouquet Canyon Road/Central Park Entrance
have been budgeted in Account Nos. C0012052 and C4001455, respectively, in FY 1997-98. The
total estimated cost of the projects is $240,000.
ATTACHMENTS
Exhibit "A" - Whites Canyon Road/Steinway Street
Exhibit "B" - Bouquet Canyon Road/Central Park Entrance
MS:lkl
couw;1 \sgnlcnst msl
►:
t
0
0
x
Z U
O
`o SND z
Q
O
OP
HOT SPR
�Q
WHI
J�OP V) o 1.3 1 [!j evioovl
Q� o g y 3AV ROSAMO� o�
w m o a
3AV
v
CO � Nl ANS 3f11B
Q M 351NNf15
0&06,
1S�� 13M00 O�Hsb NI
3�
MMES y
S l
�pNLEY 3 NI
Z 4
M ?
y
4: y3
o E w o 38 OaV3V1 i c�i o
�� DREW
3AV
w0
0 LSanHDIY1 y
OAKGALE AVE r LN Z� °o cc d
� HJpbWIN
o Gpy�( PSO � cL � �
3AV
00
s W
10 A38and SON P `-
W
ul ;
3AV H33a OAVN
3AV
138V1
W
C)
C)
N
u
P'''°I
Z 1�
CL1
►:
t
i•
w
z
Q
z
LU
J
Z
U
Q
Ir
O
z
U
F—
LU
D
a
D
m
wodurl
0,
"J `Oily
U
Q Z �o
Q
� o
ZJ
U)iw z
Uw
H
0
RD J
Qv o
\
ON egg\
w
z �
i•
w
z
Q
z
LU
J
Z
U
Q
Ir
O
z
U
F—
LU
D
a
D
m