Loading...
HomeMy WebLinkAbout1998-01-13 - AGENDA REPORTS - TRAFSIG WHITES CYN (2)AGENDA REPORT CONSENT CALENDAR City Manager Approval Item to be presented by: Bahman Janka DATE: January 13, 1998 SUBJECT: TRAFFIC SIGNAL AND INTERCONNECT INSTALLATION AT WHITES CANYON ROAD/STEINWAY STREET AND BOUQUET CANYON ROAD/CENTRAL PARK ENTRANCE - APPROVAL OF PLANS AND SPECIFICATIONS AND ADVERTISEMENT FOR BIDS (PROJECT NOS. C0012 AND C4001). DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council approve the plans, specifications, and estimates (PS&E) and authorize the advertisement for bids of the traffic signal and interconnect installation project at Whites Canyon Road/Steinway Street and also for a traffic signal installation project at Bouquet Canyon Road/Central Park Entrance. BACKGROUND At the regular June 24, 1997 City Council meeting, staff presented the results of the City's Signal Priority List to Council. Based on the findings of this report, Council directed staff to proceed with the installation of the traffic signal and interconnect installation at the intersection of Whites Canyon Road/Steinway Street. Council allocated $220,000 to install this traffic signal and interconnect in the 1997-98 fiscal year. The City of Santa Clarita has planned to develop a park along the east side of Bouquet Canyon Road at the property owned by Castaic Lake Water Agency (CLWA). As part of the lease agreement between CLWA and the City for the proposed City's Central Park, the entrance (ingress/egress) of the park at Bouquet Canyon Road shall be signalized before the start of construction of Phase I improvements. Council allocated $140,000 from developer fees to install this traffic signal in the 1997-98 fiscal year. The two signalization projects will be combined as one project. The traffic signal plans, specifications, and estimate for the intersection of Whites Canyon Road/Steinway Street and Bouquet Canyon Road/Central Park Entrance have been prepared and will be available for review in the offices of the City Clerk and the City Engineer. A 0 0 Apnda ReM TRAFFIC SIGNAL AND INTERCONNECT INSTALLATION January 13, 1998 - Page 2 ALTERNATIVE ACTIONS None. FISCAL IMPACT Funds for the' installation of the traffic signal and interconnect for Whites Canyon Road/Steinway Street and the traffic signal for Bouquet Canyon Road/Central Park Entrance have been budgeted in Account Nos. C0012052 and C4001455, respectively, in FY 1997-98. The total estimated cost of the projects is $240,000. ATTACHMENTS Exhibit "A" - Whites Canyon Road/Steinway Street Exhibit "B" - Bouquet Canyon Road/Central Park Entrance MS:lkl couw;1 \sgnlcnst msl ►: t 0 0 x Z U O `o SND z Q O OP HOT SPR �Q WHI J�OP V) o 1.3 1 [!j evioovl Q� o g y 3AV ROSAMO� o� w m o a 3AV v CO � Nl ANS 3f11B Q M 351NNf15 0&06, 1S�� 13M00 O�Hsb NI 3� MMES y S l �pNLEY 3 NI Z 4 M ? y 4: y3 o E w o 38 OaV3V1 i c�i o �� DREW 3AV w0 0 LSanHDIY1 y OAKGALE AVE r LN Z� °o cc d � HJpbWIN o Gpy�( PSO � cL � � 3AV 00 s W 10 A38and SON P `- W ul ; 3AV H33a OAVN 3AV 138V1 W C) C) N u P'''°I Z 1� CL1 ►: t i• w z Q z LU J Z U Q Ir O z U F— LU D a D m wodurl 0, "J `Oily U Q Z �o Q � o ZJ U)iw z Uw H 0 RD J Qv o \ ON egg\ w z � i• w z Q z LU J Z U Q Ir O z U F— LU D a D m