HomeMy WebLinkAbout1999-11-30 - AGENDA REPORTS - CURB GUTTER RAMP M3002 T0004 (2)CONSENT CALENDAR
CITY OF SANTA CLARITA
AGENDA REPORT
City Manager Approval: /A�
Item to be presented by: Christopher C. Price
DATE: November 30, 1999
SUBJECT: CURB AND GUTTER REPAIR AND ACCESS RAMP INSTALLATION—
PROJECT NOS. M3002 AND T0004 —.
PROJECT ACCEPTANCE
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
City Council accept the work performed by E&M Constructors on the Curb and Gutter Repair
and Access Ramp Installation, Project Nos. M3002 and T0004; direct the City Clerk to file the
attached Notice of Completion; and direct staff to release the ten percent retention 35 days after
the Notice of Completion is recorded, provided no stop notices as provided by law have been
filed. Authorize the transfer of $8,000.00 from the 1999-2000 Slurry Seal Project, Account
No. M3003001 to Account No. M3002001.
BACKGROUND
This project implemented the City's annual program to repair damaged curb and gutter, and
install pedestrian access ramps. The list of locations was generated from residents' telephone
calls received by Field Services and Transportation & Engineering Services Departments. The
work completed is located throughout the City and is shown on Exhibits "A" and "B."
On July 13, 1999, the City Council awarded a construction contract to E&M Constructors. The
project was completed to the satisfaction of the City Engineer on October 20, 1999.
During construction, staff received numerous requests from residents to add locations for curb
and gutter repairs and access ramp installation to the existing contract. To avoid delaying the
work requested until the next annual repair project, staff added the locations to the existing
contract, expediting the completion of the work requested and minimizing the impacts to the
residents.
ALTERNATIVE ACTIONS
Other action as determined by the City Council.
� a �
CURB AND GUTTER REPAIR AND
ACCESS RAMP INSTALLATION
November 30, 1999 — Page 2
FISCAL IMPACT
The budget for the Curb and Gutter Repair, Project No. M3002 is $162,546.85. The budget for
the Access Ramp Installation, Project No. T0004 is $100,000.00. Additional funds in the
amount of $8,000.00 are available from the Annual Slurry Seal project. The total budget is
$270,546.85. The construction cost for this project is $253,496.78. The total project cost is
$269,527.00, which includes design, inspection, project management, and construction costs.
ATTACHMENTS
Notice of Completion
Exhibit "A" - List of Locations for Curb and Gutter Repair
Exhibit `B" - List of Locations for Access Ramp Installation
DM:tw
council \ t0004acc. doe
EXHIBIT W
LIST OF LOCATIONS FOR THE
1999-c000 ANNUAL CURB/GUTTER REPAIR PhjGRAM
PROJECT NO. M3002
Page 1 of 2
A
.
m
U
!E i
i_Z
u
N0
7
(a
Lu t=-
Cr
a
> z
Q U\
to
Z
Q O
A
Q
E
>
MAP
U
Length (feet)
GRID STREET
community
S
D7
A uadero PI.
22635
18.0
S
D7
A uadero PI.
22607
20.0
C
F12
Backerton
n/o Vicci
42.0
CT
F14
Canvas St.
0 Wnterdale -ww
63.0
C
F11
Chadway St.
19520
48.0
C
,10..1:.:'2
Deli ht St.
19120
40.0
C
F11, F12
Drycliff St.
19613
83.0
S
F7
Es uella Dr.
22301 & 22310
75.0
S
F7
Es uella Dr.
22333
46.0
S
F7
Es uella Dr.
22339
25.0
S
F7
Es uella Dr.
22714
25.0
S
F7
Es uella Dr.
22718
50.0
S
F7
Es uella Dr.
22324
45.0
S
F7
Es uella Dr. cul de sac
22316
62.0
S
F7
Es uella Dr.
22327
34.0
S
F7
Es uella Dr.
22345
25.0
C
F11
Fairport Ave.
@ Pleasantdale
30.0
E
-Flo. F71. F¢
Fairweather St.
19023
40.0
S
E7
Festividad Dr.
22538
47.0
S
E7
Festividad Dr.
22300
60.0
V
G5
Firenze PI.
24430
10.0
V
H5
Fenda Way
25874
50.0
C
E16
Gladiolus Dr.
28912
31.0
S
E7
Jarana CL
27060
37.0
S
07
La Rochelle Dr.
22525
13.0
S
D7
La Rochelle Dr.
22415
54.0
S
D7
La Rochelle Dr.
22421
54.0
S
D7
La Rochelle Dr.
22406
72.0
C
E10, F10
Lakehurst Ave.
27215
25.0
C
F10
Lakemore Dr.
20321
17.0
S
E7
Los Ti res Dr.
22508
27.0
S
E7
Los Ti res Dr.
22343
73.0
S
E7
Los Ti res Dr.
22521
44.0
C
IF1
G12
Mandan St.
18702 to apartnenb
57.0
C
1, F12
Newhouse St.
19633
100.0
C
G10
Pamela Dr.
26793
60.0
S
E7
Paraquav Dr.
22589
63.0
S
E7
Paraguay Dr.
22301
27.0
S j
E7
Paraouay Dr.
22549
23.0
Page 1 of 2
A
EXHIBIT "A"
LIST OF LOCATIONS FOR THE 1 ,
1999-2000 ANNUAL CURB/GUTTER REPAIR PROGRAM
PROJECT NO. M3002
Location for cross gutter repair
C Bainbury* Oakmoor X gutter 85 feet
Page 2 of 2
y
U
U
�
-
"
_
(n
O
3
Y a
W
H
r
R C
z
O
U
m
w =
Q
O
'`
� c
EU
H °
MAP
GRID
community
STREET
Length (feet)
S
E7
Paraguay Dr.
22524 - 22530
134.0
C
F11
Pleasantdale St.
19027
21.0
C ,
F11
Pleasantdale St.
19115
44.0
C
F11
Pleasantdale St.
19323
42.0
C
61 ElE16
Poppy Meadow St.
15272
16.0
C
E16
Rhododendron Dr.
15321
20.8
S
C7. 07, E7
Santa Clarita Rd.
27522
100.0
C
F13
Silverstream Dr.
17815
36.0
C
E16
Snapdragon Pl.
29326
16.0
C
E16
Snapdragon PI.
29284
28.0
C
06
Sycamore Creek Dr.
229211
51'0
V
K6
Via Amado
23408
79.01
S
D9
Winterset Dr.
21129
30.0
Location for cross gutter repair
C Bainbury* Oakmoor X gutter 85 feet
Page 2 of 2
1
Exhibit "B"
LIST OF LOCATIONS FOR ACCESS RAMP INSTALLATION
PROJECT NO. T0004
Street
Cross Street
NNV comer WE c`oineFr S/W vomer
.Zeiia Rd
IGrardiilcras
X
X
X
X
acelia Rd
I`/'/istana Vallev !
X
X
=ce!ia Rd
Narc:ssus Crest
x I
X
c'eccnias Ln
-Acelia -+c
X
X
I
Carrcusel Or
1 F!owercar< Or
X
X
Fairclade St
IKenrov AV
X
X
IF!o,,veroark Or
Lotuscarcen Or
X
X
X
Gardeniapark Cr
IFlcwerpark Or
X
X
Gardeniapark Or
arden Dr
X
X
'Gardenialane
IDr
x
X
Gladiolus Or
5GIadjolus
Iarden Dr
X
X
Gcedvale Rd
Ir; St
X
X
X
X
Gocdvale Rd
v
X
X
X
!Gcedvale Rd
I\P/interdale Dri
X
X
I
X
!Gcedvale Rc
IKenrov AV I
X
X
X I
L:ilvcien Or
IGlaeioius Or I
I
X
X
Nasturtium Dr
IBcucainvillia Wv
X
X
Nasturtium Or
!Lotus arden Or
X I
X
(Nasturtium Ln
IRcwercark Or
X
X
X I
X
iRhodcdendron CrlSnacdra
on PI
X
X
Sarna AV
Deec Creek Or
X I
X
X
X
!Sarita Or
IEacle PeakAV I
X I
X
S iverstream Or
(Lost Sorin s Rd
X
I
X
Snaccra on P!
IFicwerpark Dr
X !
X
IVia Gardenia
IArelia Rd
X
X I
X' Indicates Iccation where access ramp is to be installed.
access Ramps snail ce installed per LAC.PN Std plan No. 1200-2, Case B, Type 4