HomeMy WebLinkAbout1999-11-30 - AGENDA REPORTS - CURB GUTTER RAMP M3002 T0004 (2)CONSENT CALENDAR CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: /A� Item to be presented by: Christopher C. Price DATE: November 30, 1999 SUBJECT: CURB AND GUTTER REPAIR AND ACCESS RAMP INSTALLATION— PROJECT NOS. M3002 AND T0004 —. PROJECT ACCEPTANCE DEPARTMENT: Transportation and Engineering Services RECOMMENDED ACTION City Council accept the work performed by E&M Constructors on the Curb and Gutter Repair and Access Ramp Installation, Project Nos. M3002 and T0004; direct the City Clerk to file the attached Notice of Completion; and direct staff to release the ten percent retention 35 days after the Notice of Completion is recorded, provided no stop notices as provided by law have been filed. Authorize the transfer of $8,000.00 from the 1999-2000 Slurry Seal Project, Account No. M3003001 to Account No. M3002001. BACKGROUND This project implemented the City's annual program to repair damaged curb and gutter, and install pedestrian access ramps. The list of locations was generated from residents' telephone calls received by Field Services and Transportation & Engineering Services Departments. The work completed is located throughout the City and is shown on Exhibits "A" and "B." On July 13, 1999, the City Council awarded a construction contract to E&M Constructors. The project was completed to the satisfaction of the City Engineer on October 20, 1999. During construction, staff received numerous requests from residents to add locations for curb and gutter repairs and access ramp installation to the existing contract. To avoid delaying the work requested until the next annual repair project, staff added the locations to the existing contract, expediting the completion of the work requested and minimizing the impacts to the residents. ALTERNATIVE ACTIONS Other action as determined by the City Council. � a � CURB AND GUTTER REPAIR AND ACCESS RAMP INSTALLATION November 30, 1999 — Page 2 FISCAL IMPACT The budget for the Curb and Gutter Repair, Project No. M3002 is $162,546.85. The budget for the Access Ramp Installation, Project No. T0004 is $100,000.00. Additional funds in the amount of $8,000.00 are available from the Annual Slurry Seal project. The total budget is $270,546.85. The construction cost for this project is $253,496.78. The total project cost is $269,527.00, which includes design, inspection, project management, and construction costs. ATTACHMENTS Notice of Completion Exhibit "A" - List of Locations for Curb and Gutter Repair Exhibit `B" - List of Locations for Access Ramp Installation DM:tw council \ t0004acc. doe EXHIBIT W LIST OF LOCATIONS FOR THE 1999-c000 ANNUAL CURB/GUTTER REPAIR PhjGRAM PROJECT NO. M3002 Page 1 of 2 A . m U !E i i_Z u N0 7 (a Lu t=- Cr a > z Q U\ to Z Q O A Q E > MAP U Length (feet) GRID STREET community S D7 A uadero PI. 22635 18.0 S D7 A uadero PI. 22607 20.0 C F12 Backerton n/o Vicci 42.0 CT F14 Canvas St. 0 Wnterdale -ww 63.0 C F11 Chadway St. 19520 48.0 C ,10..1:.:'2 Deli ht St. 19120 40.0 C F11, F12 Drycliff St. 19613 83.0 S F7 Es uella Dr. 22301 & 22310 75.0 S F7 Es uella Dr. 22333 46.0 S F7 Es uella Dr. 22339 25.0 S F7 Es uella Dr. 22714 25.0 S F7 Es uella Dr. 22718 50.0 S F7 Es uella Dr. 22324 45.0 S F7 Es uella Dr. cul de sac 22316 62.0 S F7 Es uella Dr. 22327 34.0 S F7 Es uella Dr. 22345 25.0 C F11 Fairport Ave. @ Pleasantdale 30.0 E -Flo. F71. F¢ Fairweather St. 19023 40.0 S E7 Festividad Dr. 22538 47.0 S E7 Festividad Dr. 22300 60.0 V G5 Firenze PI. 24430 10.0 V H5 Fenda Way 25874 50.0 C E16 Gladiolus Dr. 28912 31.0 S E7 Jarana CL 27060 37.0 S 07 La Rochelle Dr. 22525 13.0 S D7 La Rochelle Dr. 22415 54.0 S D7 La Rochelle Dr. 22421 54.0 S D7 La Rochelle Dr. 22406 72.0 C E10, F10 Lakehurst Ave. 27215 25.0 C F10 Lakemore Dr. 20321 17.0 S E7 Los Ti res Dr. 22508 27.0 S E7 Los Ti res Dr. 22343 73.0 S E7 Los Ti res Dr. 22521 44.0 C IF1 G12 Mandan St. 18702 to apartnenb 57.0 C 1, F12 Newhouse St. 19633 100.0 C G10 Pamela Dr. 26793 60.0 S E7 Paraquav Dr. 22589 63.0 S E7 Paraguay Dr. 22301 27.0 S j E7 Paraouay Dr. 22549 23.0 Page 1 of 2 A EXHIBIT "A" LIST OF LOCATIONS FOR THE 1 , 1999-2000 ANNUAL CURB/GUTTER REPAIR PROGRAM PROJECT NO. M3002 Location for cross gutter repair C Bainbury* Oakmoor X gutter 85 feet Page 2 of 2 y U U � - " _ (n O 3 Y a W H r R C z O U m w = Q O '` � c EU H ° MAP GRID community STREET Length (feet) S E7 Paraguay Dr. 22524 - 22530 134.0 C F11 Pleasantdale St. 19027 21.0 C , F11 Pleasantdale St. 19115 44.0 C F11 Pleasantdale St. 19323 42.0 C 61 ElE16 Poppy Meadow St. 15272 16.0 C E16 Rhododendron Dr. 15321 20.8 S C7. 07, E7 Santa Clarita Rd. 27522 100.0 C F13 Silverstream Dr. 17815 36.0 C E16 Snapdragon Pl. 29326 16.0 C E16 Snapdragon PI. 29284 28.0 C 06 Sycamore Creek Dr. 229211 51'0 V K6 Via Amado 23408 79.01 S D9 Winterset Dr. 21129 30.0 Location for cross gutter repair C Bainbury* Oakmoor X gutter 85 feet Page 2 of 2 1 Exhibit "B" LIST OF LOCATIONS FOR ACCESS RAMP INSTALLATION PROJECT NO. T0004 Street Cross Street NNV comer WE c`oineFr S/W vomer .Zeiia Rd IGrardiilcras X X X X acelia Rd I`/'/istana Vallev ! X X =ce!ia Rd Narc:ssus Crest x I X c'eccnias Ln -Acelia -+c X X I Carrcusel Or 1 F!owercar< Or X X Fairclade St IKenrov AV X X IF!o,,veroark Or Lotuscarcen Or X X X Gardeniapark Cr IFlcwerpark Or X X Gardeniapark Or arden Dr X X 'Gardenialane IDr x X Gladiolus Or 5GIadjolus Iarden Dr X X Gcedvale Rd Ir; St X X X X Gocdvale Rd v X X X !Gcedvale Rd I\P/interdale Dri X X I X !Gcedvale Rc IKenrov AV I X X X I L:ilvcien Or IGlaeioius Or I I X X Nasturtium Dr IBcucainvillia Wv X X Nasturtium Or !Lotus arden Or X I X (Nasturtium Ln IRcwercark Or X X X I X iRhodcdendron CrlSnacdra on PI X X Sarna AV Deec Creek Or X I X X X !Sarita Or IEacle PeakAV I X I X S iverstream Or (Lost Sorin s Rd X I X Snaccra on P! IFicwerpark Dr X ! X IVia Gardenia IArelia Rd X X I X' Indicates Iccation where access ramp is to be installed. access Ramps snail ce installed per LAC.PN Std plan No. 1200-2, Case B, Type 4