Loading...
HomeMy WebLinkAbout1999-11-30 - AGENDA REPORTS - GALETON IMPROVM3001 AWARD (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: November 30, 1999 City Manager Approval: Item to be presented by: SUBJECT: GALETON ROAD IMPROVEMENTS - PROJECT NO. M3001— AWARD CONSTRUCTION CONTRACT DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council award the contract for the Galeton Road Improvements, Project No. M3001 to R.C. Becker & Son, Inc. in the amount of $87,045.57 and authorize a 15 percent contingency should any change orders to the contract become necessary. This is contingent on approval of the midyear budget adjustment. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND On September 28, 1999, the City Council authorized the advertisement for bids for Galeton Road Improvements, Project No. M3001. This project will install curb and gutter along the west side of the street; install a catch basin to relieve the current drainage problems; reconstruct existing driveway approaches; and repair the asphalt roadway surfacing. This project will greatly improve this segment of Galeton Road. The limits of this project are from Soledad Canyon Road to Stillmore Street (Exhibit "A," Project Location Map). On Tuesday, October 19, 1999, the bids were received by the City Clerk's office (Exhibit "B," Bid Results). The Engineer's Estimate for this project was $70,000.00. The lowest bid was submitted by R.C. Becker & Son, Inc. in the amount of $87,045.57. The high bid amount is due to increasing unit prices submitted by all of the contractors at the bid opening. Also, the scope of work increased during the design, which added an additional catch basin, striping, and traffic signal loops. Additional funds are needed to cover these unanticipated project cost, and have been requested as part of the Fiscal Year 1999-2000 midyear budget process. Staff recommends that the project be awarded to R.C. Becker & Son, Inc., the lowest responsive bidder (Exhibit "B"). R.C. Becker & Son, Inc. possesses a State Contractor's License and is in good standing with the State Contractor's License Board. The bid of $87,045.57 was reviewed for accuracy and conformance to the contract documents and was found to be complete. This contractor has previously constructed several projects to the City's satisfaction. Other references have indicated that this contractor has performed work that has met their goals. b Fqpior6 yAe Qcoanda 11te i GALETON ROAD IMPROVEMENTS AWARD CONSTRUCTION CONTRACT November 30, 1999 - Page 2 ALTERNATIVE ACTIONS 1. Do not award the contract at this time. 2. Other action as determined by the City Council. FISCAL IMPACT During the Fiscal Year 1999-2000 budget, the City Council appropriated $66,150.00 in Stormwater Funds to complete improvements to Galeton Road, Project No. M3001. Due to issues raised regarding the City's ability to utilize Stormwater Funds for this type of improvement, coupled with the actual costs of this project exceeding the initial Engineer's Estimate, staff believes it is appropriate to modify the budget for this project during the midyear process. As part of the Fiscal Year 19.99-2000 midyear budget process, staff is requesting that the City Council de -commit all Stormwater Funds previously budgeted for Project No. M3001; and appropriate $100,000.00 in General Fund monies from the Annual Overlay Program in order to complete all work associated with this project. ATTACHMENTS Exhibit "A" — Project Location Map Exhibit "B" — Bid Results MC:tw council \ awdm3001. doc EXHIBIT "B" GALETON ROAD IMPROVEMENTS PROJECT NO. M3001 Company Granite Construction Padilla Engineering C.A. Rasmussen, Inc. Excel Paving Co. R.C. Becker & Son, Inc. E & M Constructors Co. Apparent Low Bidder. MC:tw council \ awdm.3001. doc BID RESULTS City Amount Watsonville, CA $89,712.50 Northridge, CA $90,640.20 Santa Clarita, CA $115,698.78 Long Beach, CA $132,951.00 Santa Clarita, CA $87,045.57 Sylmar, CA $107,555.50 R.C. Becker & Son, Inc.