Loading...
HomeMy WebLinkAbout1999-05-25 - AGENDA REPORTS - MTA RAILROAD RIGHT OF WAY (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: May 25, 1999 City Manager Approval: Item to be presented by: T. Brad Therrien SUBJECT: APPROVAL OF AGREEMENTS WITH THE METROPOLITAN TRANSPORTATION AUTHORITY FOR FACILITIES WITHIN THE RAILROAD RIGHT-OF-WAY DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION City Council approve the five supplemental agreements and the two additional license agreements between the Metropolitan Transportation Authority (MTA) and the City of Santa Clarita, and authorize the City Manager to sign these agreements on behalf of the City of Santa Clarita. BACKGROUND The conditions of approval for Tentative Tract Map No. 42670 (Santa Clarita Business Park) required the construction of storm drain and sewer facilities. Some of these facilities are to be constructed within the railroad right-of-way and cross under the railroad tracks along Soledad Canyon Road between Golden Oak Road and Ruether Avenue. A license agreement is required prior to approval by the MTA. In a separate matter, at the August 28, 1990 regular meeting of the City Council, five agreements were approved and signed between the Southern Pacific Transportation Company (SPTC) and the City of Santa Clarita to create easements for the construction, operation, and maintenance of storm drain facilities within the limits of their right-of-way. Since that initial approval, MTA has become the successor in interest for the railroad right-of-way, and requires that supplemental agreements be signed between the City of Santa Clarita and MTA. The purpose of the supplemental agreements is to modify the original agreements to replace SPTC with MTA and to incorporate standard MTA encroachment requirements. fP^ a�, 91 ,agenda ftew� APPROVAL OF SUPPLEMENTAL AGREEMENT WITH MTA TRACT NO. 42670 May 25, 1999 — Page 2 ALTERNATIVE ACTIONS No alternative action is proposed, as the modification of the original agreements does not alter previously agreed to conditions. The two new agreements will facilitate the construction of desired improvements. FISCAL IMPACT A check for $7,000 to cover the MTA processing fee has been provided by the developer. Although maintenance costs will result from the construction of the proposed facilities, this action does not increase costs to the City beyond those already anticipated within the original agreements with SPTC and the developer. Some of the drainage facilities will be transferred to the Los Angeles County Flood Control District for maintenance, the remainder of the drainage facilities will be maintained by the City as local road drains, and the sewer main will be owned by the City and maintained by Los Angeles County Consolidated Sewer Maintenance District. ATTACHMENTS Vicinity Map MTA Supplemental Clerk's reading file) LPC:lkl:twb council \ mta42670. dcc Agreements and two new License Agreements (available in the City II I I I _J � av+ 4 0 O N C €0 =0 00 m r m $ i 11 I Santa Clarlts ny jo4jeny Sports Complex 7 � I� c ROAD (FUTURE) o GOLDEN VALLEY r O n e K N r. W r 1"1 p N � 1 p N ' r• J W ' t N N 0 p � N W 7d \ r dy�c O0 m v U N r O � 2 R N y 9 N _ ¢ E 9 n U 0°K < F ® o Z / a¢ Q 94 O ¢ p d o N � 1