HomeMy WebLinkAbout1999-05-11 - AGENDA REPORTS - PLACERITA SEWER BACKBONE STUDY (2)NEW BUSINESS DATE SUBJECT: DEPARTMENT: CITY OF SANTA CLARITA AGENDA REPORT City Manager Approval: Item to be presented by: May 11, 1999 PLACERITA CANYON SEWER BACKBONE RESULTS OF STUDY Transportation and Engineering Services RECOMMENDED ACTION PROJECT NO. S2036 City Council accept the report and provide direction to staff regarding preferred alternatives for proceeding with the Placerita Canyon Sewer Backbone - Project No. S2036. Approve the budget transfer to correct the funding from Account No. S2036001-8001 to Account No. 52036457-8001. BACKGROUND This report will present the results of the recently completed feasibility study for a backbone sewer to serve the Placerita Canyon area. In December 1997, staff prepared a Request for Proposals (RFP) to select a consultant to perform a feasibility study and to potentially prepare design plans for future sewer improvements in Placerita Canyon. The completed study identifies obstacles and strategies toward the end purpose of providing sanitary sewer service to all residents and businesses west of the Placerita "gate" (See Exhibit "A"). Several challenges identified include: crossing under Placerita Creek, crossing the sizable Metropolitan Water District supply line, minimizing the impact to oak trees in the area, the various restrictions inherent in private streets, and potential difficulties of right-of- way acquisition. The study presents several options to accomplishing the task, including several phases and two different approaches to construction. The most obvious impediment to the eventual construction of the project is the monetary costs involved. Those benefiting from the system should ultimately bear most of this cost, but gaining consensus toward participation will be the key to the eventual success of the endeavor. Boyle Engineering Corporation was awarded the contract for this study, and the finished report is hereby presented to the City Council for consideration and direction (see Exhibit `B"). PLACERITA CANYON SEWER BACKBONE — PROJECT NO. 52036 RESULTS OF STUDY May 11, 1999 — Page 2 ALTERNATIVE ACTIONS 1. Direct staff to elicit reactions from the Placerita Canyon residents as to their desire to fund a construction project to install the subject improvements. 2. Direct staff to enter into a contract with a consultant engineer to prepare design plans for the future construction of the subject improvements. 3. Other action as determined by the City Council. FISCAL IMPACT This project was funded directly by money collected from developers building in the Placerita Canyon area. Funds in the amount of $227,590.00 from Account No. 52036457-8001 were originally budgeted for this project. To date, $18,151.53 has been spent on the preliminary feasibility portion of the project. ATTACHMENTS Exhibit "N'- Project Location Map Exhibit `B" - Project Report (available in City Clerk's Reading File) CCP:tw council \ plas2rpt.doc U N . ,—, O N O � � U c� �� �O . �-, � +' � c� � U O � �� +, ., .0 � N U N W U c� O � � �