Loading...
HomeMy WebLinkAbout1999-11-09 - AGENDA REPORTS - SOLEDAD CYN DESIGN CONTR (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: November 9, 1999 City Manager Approval: Item to be presented by: SUBJECT: SOLEDAD CANYON — EL NINO AWARD DESIGN CONTRACT - PROJECT NO. D4001 DEPARTMENT: Transportation & Engineering Services RECOMMENDED ACTION: City Council (1) award contract to Pacific Advanced Civil Engineering, Inc. for engineering design services for Soledad Canyon — El Nifio, Project No. D4001, in the amount of $50,000.00 and authorize a 15 percent contingency in the amount of $7,500.00; (2) appropriate $34,669.00 in reimbursable FHWA Federal Funds for Account No. D4001103; (3) authorize a budget transfer in the amount of $4,491.00 from Account No. M0010001 to Account No. D4001001 to provide the 11.47 percent local match required; and (4) authorize the City Manager or designee to execute all documents, subject to City Attorney approval. As a result of the excessive storm damage of the 1997-1998 storm season, the City requested additional federal participation in restoring a portion of the Santa Clara River embankment along Soledad Canyon Road across from the Saugus Speedway. Excessive flows during numerous rainy seasons have consistently flowed directly toward Soledad Canyon Road at this location. As a result, there is a potential threat of closure of this major arterial roadway. Emergency Relief Restoration funds from the Federal Highway Administration (FHWA) will fund the design costs of the Soledad Canyon — El Nino project. This project will provide permanent flood protection improvements along the embankment supporting the trail and Soledad Canyon Road at the Saugus Speedway. This project was budgeted in Fiscal Year 1999-2000 for preliminary engineering and environmental services. However, in order to utilize the federal funding, a construction contract must be awarded prior to the end of this fiscal year. Therefore, staff recommends initiating the design phase of this project now. ALTERNATIVE ACTION Other action as determined by the City Council. JPPROVED SOLEDAD CANYON — EL NI&O AWARD DESIGN CONTRACT November 9, 1999 — Page 2 �1f.YN�l�i� �7:LiT11 The Federal Highway Administration Emergency Relief program is funding 88.53 percent of the costs for this project. The City's local match is 11.47 percent. An additional budget in the amount of $34,669.00 is required to provide for the federal participation. A budget transfer in the amount of $4,491.00 from Account No. M0010001 to Account No. D4001001 is also required to cover the additional local match. A portion of the funds was budgeted in Fiscal Year 1999-2000 for preliminary engineering, pending federal approval for the balance necessary for the design. The City has received approval and can now proceed with the design. ATTACHMENT None. DK:tw council \ designaw 1. doe