HomeMy WebLinkAbout1999-01-26 - AGENDA REPORTS - SOLEDAD EL NINO REPAIRS (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
DATE: January 26, 1999
City Manager Approval
Item to be presented by:
SUBJECT: SOLEDAD CANYON ROAD EL NI&O EMERGENCY STORM REPAIRS
-- APPROVAL OF PROGRAM SUPPLEMENT NO. M003
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
City Council approve Supplement No. M003 for the Soledad Canyon Road El Nino Emergency
Storm Repairs project, and authorize the City Manager or his designee to approve all
documents relating to this supplement.
BACKGROUND
This project provided emergency repairs for the 1998 El Nino storm damage along Soledad
Canyon Road across from the Saugus Speedway. The future restoration will include placing
large rocks along the full height of the riverbed slope adjacent to Soledad Canyon Road for
approximately 1,200 linear feet.
The City and the State of California executed Master Agreement No. 07-5450 for Federal -Aid
projects on July 15, 1997. Supplements to this Master Agreement formalize the financial
responsibilities and provisions for specific Federal -Aid projects. Program Supplement No. M003
is the specific agreement for the El Nino Storm Emergency Repairs project at Soledad Canyon
Road across from the Saugus Speedway.
Program Supplement No. M003 provides the funds necessary to reimburse the City for costs
associated with this emergency repair project, as well as the costs to initiate the preliminary
engineering for the future restoration phase of the project. Upon Council approval of this
Program Supplement, the City Manager or his designee is directed to execute this agreement.
ALTERNATIVE ACTION
Other action as determined by Council.
11 51�
k
A
. 4 a Item, -3-
SOLEDAD CANYON ROAD EL NINO STORM REPAIRS
PROGRAM SUPPLEMENT NO. M003
January 26, 1999 — Page 2
FISCAL IMPACT
Federal Highway Administration (FHWA) participation through Emergency Relief totals
$267,144, which includes the following:
$236,954 for the emergency repairs completed, to be reimbursed at 100 percent.
$30,190 for preliminary engineering to initiate the restoration phase of the project, to be
reimbursed at 88.53 percent.
The total cost for the future restoration work is estimated to be $377,375. FHWA participation
is 88.53 percent, requiring a local match of $43,285. Staff will return to the Council to request
the match funding during the Fiscal Year 1999-2000 budget process.
ATTACHMENTS
Program Supplement No. M003
DMK:js
COUNCIL\PROG28UP.DOC
PROGRAM SUPPLEMENT NO. M003
to
ADMINISTERING AGENCY -STATE AGREEMENT
FOR FEDERAL -AID PROJECTS NO. 07-5650
Date: November 30, 1998
Location: 07 -LA -0-SCTA
Project Number: ER -3663(030)
E.A. Number: 07-931134
This Program Supplement is hereby incorporated into the Agency -State Agreement for Federal Aid which was entered into
between the Agency and the State on 07/15/97 and is subject to all the terms and conditions thereof. This Program Supplement
is adopted in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No.
approved by the Agency on (See copy attached).
The Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with
the covenants or remarks setforth on the following pages.
PROJECT TERMINI:
In the City of Santa Clarita on the Santa Clara River adj/to Soledad Canyon Road. - DAFff THD-SCTA-001-0
TYPE OF WORK: EO/FA - PR/Contract LENGTH: 0 (MILES)
PROJECT CLASSIFICATION OR PHASE(S) OF WORK
M Preliminary Engineering
[X] Construction Engineering
[ j Right -Of -Way
[Xj Construction
Estimated Cost
Federal Funds
Matching Funds
$267,144.00
098 $263,681.00
LOCAL
$3,463.00
$0,00
OTHER_
$0.00
.-iia. yr oeaaY a:n �.a�rucl'1'ti
STATE OF CALIFORNIA
Department of Transportation
By By
Date Chief, Office of Local Programs
Project Implementation
Attest
Date
Title
I hereby certify upon my personal knz
9pla a that budgeted
qr dg dgetad Funds era available fo/r)thin9encumbrance:
Accounting Offic�/�////J/// Date l 3v - ` �_ $263,681.00
Chapter Statutes Item Year rogram BC Fund source AFOI7riT
324 1998 2660-101-890 'W49 0.30.010.650 C 225000 892-F 263,681.00
Program Supplement 07-5650-M003- ISTEA Page 1 of 3
07-LA-0-SCTA
ER -3663(030)
SPECIAL COVENANTS OR REMARKS
11/30/1998
1. The effective date of this agreement is 2/2/98.
2. All maintenance, involving the physical condition and the
operation of the improvements, referred to in Article III
MAINTENANCE of the aforementioned Master Agreement will be the
responsibility of the Local Agency and shall be performed at
regular intervals or as required for efficient operation of the
completed improvements.
3. Emergency opening work will be reimbursed at 100% if completed
within 180 days from the initial day of storm occurrence. The
initial day of storm occurrence is February 2, 1998. Local
Agency records must clearly identify those costs incurred on or
after February 2, 1998. Incurred costs are defined as
disbursements made or in process for goods and services
delivered. Emergency opening work completed after July 31, 1998
will be funded at the federal -aid reimbursement ratio of 88.53%.
Restoration work, including preliminary engineering, will be
reimbursed at an 88.53% ratio. The Local Agency will be
responsible for the matching requirement.
4. The Local Agency agrees the payment of Federal funds will be
limited to the amounts approved by the Federal Highway
Administration in the Federal -Aid Project Agreement (PR-2)/Detail
Estimate, or its modification (PR -2A) or the FNM -76, and accepts
any increases in Local Agency Funds as shown on the Finance or
Bid Letter or its modification as prepared by the Office of Local
Programs Project Implementation.
5. The work eligible for Federal Reimbursement shall be performed by
the Local Agency either by using their own forces or by contract.
The Local Agency must be able to identify the costs incurred at
each site and be subject to an audit for verification.
6. The Local Agency will advertise, award and administer this
project in accordance with the current Local Assistance
Procedures Manual.
7. Whenever the local agency uses a consultant on a cost plus basis,
the local agency is required to submit a post audit report -
covering the allowability of cost payments for each individual
consultant or sub -contractor incurring over $25,000 on the
project. The audit report must state the applicable cost
Program Supple nt07-5450-M003- ISTEA Page 2 of 3
11/3on998
SPECIAL COVENANTS OR REMARKS
principles utilized by the auditor in determining allowable costs
as referenced in CFR 49, part 18, Subpart C - 22, Allowable
Costs.
Program Supplement 07-5450-M003- ISTEA Page 3 of 3