Loading...
HomeMy WebLinkAbout1999-11-23 - AGENDA REPORTS - VERMONT EVERETT IMPROV CONTR (2)CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR DATE: November 23, 1999 City Manager Appro-, Item to be presented SUBJECT: VERMONT DRIVE/EVERETT DRIVE IMPROVEMENTS — ASSESSMENT DISTRICT NO. 99-1— PROJECT NO. 52039 — AWARD CONSTRUCTION CONTRACT DEPARTMENT: Transportation & Engineering Services City Council award the contract for the Vermont Drive/Everett Drive Improvements, Assessment District No. 99-1, Project No. 52039, to C.A. Rasmussen, Inc. in the amount of $729,270.83 and authorize a 15 percent contingency. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND This project provides a new storm drain, sanitary sewer mainline with house laterals, and completely reconstructed street improvements for the Vermont Drive/Everett Drive Improvements, Assessment District No. 99-1. On October 12, 1999, the City Council approved the plans and specifications and authorized the advertisement for construction bids. On November 8, 1999, the City Clerk's office received bids for the project (see Bid Results). The Engineer's Estimate for the construction of this project is $714,122.00. The lowest bid was submitted by C.A. Rasmussen, Inc. in the amount of $729,270.83. Staff recommends that the project be awarded to C.A. Rasmussen, Inc., the lowest responsive bidder. Staff further recommends that the contract price, as well as any contingency amounts, be payable from proceeds of assessment bonds to be issued in conjunction with funds set aside previously by the Council in Account No. S2039001 for this specific purpose. C.A. Rasmussen, Inc. possesses a State Contractor's License and is in good standing with the State Contractor's License Board. The bid of $729,270.83 was reviewed for accuracy and conformance to the contract documents and was found to be complete. A minor irregularity in the bid documents was determined to be in conformance with the City's guidelines and was confirmed by the City Attorney. The references indicated that this contractor has performed work to their satisfaction. Item®.--- VERMONT DRIVE/EVERETT DRIVE IMPROVEMENTS AWARD CONSTRUCTION CONTRACT November 23, 1999 - Page 2 At the regular City Council meeting held on October 12, 1999, staff was directed to include the cost of construction of a sewer main extension to serve the private community of Oak Knoll Estates as a bid alternative. The Oak Knoll residents were informed of the price quoted by the low bidder and rejected the option of adjusting the district to add the additional costs to their assessments. The original district plans include provisions for sewer laterals for each of the Oak Knoll residents. The Oak Knoll residents believe that the City should contribute to the cost of bringing the sewer line closer to their homes. ALTERNATIVE ACTIONS Other action as determined by the City Council. FISCAL IMPACT The Engineer's Estimate for the construction of this project is $714,122.00. City Council previously approved $400,000.00, which has been budgeted in Account No. 52039001 for this fiscal year. Additional funds will be provided for this project by the sale of municipal bonds under the 1915 Act. Bid Results CCP:lkl:tw w=cil\ve,ev dce VERMONT DR1VE/EVERETT DRIVE IMPROVEMENTS ASSESSMENT DISTRICT NO. 99-1 PROJECT NO. S2039 BID RESULTS Company City Amount Berry Engineering Oxnard, CA $869,061.00 Granite Construction Watsonville, CA $773,400.00 C.A. Rasmussen, Inc. Lancaster, CA $729,270.83 Excel Paving Co. Long Beach, CA $751,763.00 4 -CON Engineering Fontana, CA $742,839.50 council \ver-evrt.doc