HomeMy WebLinkAbout1999-11-09 - AGENDA REPORTS - W NEWHALL CAMP PLENTY IMPROV (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
DATE: November 9, 1999
City Manager Approval:
Item to be presented by:
SUBJECT: WEST NEWHALL IMPROVEMENTS PHASE III AND CAMP PLENTY
ROAD IMPROVEMENTS — PROJECT NOS. S2037 AND 53003 -
PROJECT ACCEPTANCE
DEPARTMENT: Transportation and Engineering Services
RECOMMENDED ACTION
City Council accept the work performed by Security Paving, Inc. on the West Newhall
Improvements Phase III and Camp Plenty Road Improvements, Project Nos. 52037 and
53003, respectively.
Transfer $14,000.00 from the 1999-2000 General Fund New Sidewalk Construction
Program, Project No. T0005, to the Camp Plenty Road Improvements, Project No. S3003.
Direct the City Clerk to file the attached Notice of Completion. Direct staff to release the
10 percent retention 35 days after the Notice of Completion is recorded, provided no stop
notices as provided by law have been fled, subject to City Attorney approval.
On March 9, 1999, the City Council awarded a contract for the subject projects to Security
Paving, Inc. Project No. S2037 installed new sidewalk, pedestrian access ramps, and curb
and gutter in the West Newhall area. Project No. S3003 installed sidewalk, curb and
gutter, and a retaining wall on Camp Plenty Road between Calla Way and Stillmore
Avenue (see attached Project Location Map). There is a need to transfer an additional
$14,000 to this project, as construction costs were higher than originally anticipated
because the project was built as a change order to an existing contract to expedite
completion.
This work was completed to the satisfaction of the City Engineer on September 30, 1999.
The construction cost of the West Newhall Phase III project is $243,401.36. The
construction cost for the Camp Plenty Road Improvements. is $114,407.00.
ALTERNATIVE ACTION
Other action as determined by the City Council.
AMOVEJ "Nanda Item:
WEST NEWHALL IMPROVEMENTS
CAMP PLENTY ROAD'IMPROVEMENTS
November 9, 1999 — Page 2
FISCAL IMPACT
The total budget for the West Newhall Improvements Phase III, Project No. 52037, is
$330,751.76. The construction cost for this project is $243,401.36. The total project cost for
Project No. 52037 is $303,342.59, which includes design, inspection, project management,
and construction costs. *The total project saving is $27,409.17.
The total budget for the Camp Plenty Road Improvements, Project No. 53003, is
$117,999.72, including the transferred funds of $14,000.00. The construction cost for the
Camp Plenty Road Improvements is $114,407.00. The total project cost as of
October 25, 1999 is approximately $116,350.00, which includes design, inspection, project
management, and construction costs. There are a few additional contingency posts that will
be added to the total project cost.
Transfer $14,000.00 from the 1999-2000 General Fund New Sidewalk Construction
Program, Project No. T0005, to the Camp Plenty Road Improvements, Project No. 53003.
*Note: The project savings from the West Newhall Improvements Phase III project are
Community Development Block Grant Funds, which cannot be used on the Camp Plenty
Road Improvements project.
Notice of Completion
Project Location Maps
MC:tw
council \ s2037acc.doc
RECORDING REQUESTED BY:
City of Santa Clarita
Transportation and Engineering Services Department
WHEN RECORDED, MAIL TO:
Sharon L. Dawson, CMC, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 301
Santa Clarita, CA 91355-2196
RECORDING FEES EXEMPTED
G.C. • 6103 AND 27383
Space Above This Line For Recorder's Use
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN:
1. The City of Santa Clarita, a municipal corporation, is the owner in fee, except for the
right-of-way uponwhich it has been constructed, of a certain public improvement
known as: West Newhall Improvements Phase III and Camp Plenty Road
Improvements, Project Nos. S2037 and 53003, respectively.
2. The City's address is: 23920 Valencia Boulevard, Suite 300, Santa Clarita, CA 91355
3. The general locations of said public improvements are:
• 3rd, 4th, 5th, and 6th Streets between Pine Street and Arch Street
• Walnut Street between 8th Street and 9th Street
• 9th Street between Walnut Street and Newhall Avenue
• Chestnut Street between 8th Street and 9th Street
• Chestnut Street between Lyons Avenue and 9th Street
• 8th Street between Walnut Street and Newhall Avenue
• Newhall Avenue between Market Street and Lyons Avenue
• Camp Plenty Road between Calla Way and Stillmore Avenue
4. On March 9, 1999, a contract to construct said public improvements was awarded to:
Padilla Security Paving, Inc., P.O. Box 1489, Sun Valley, CA 91353.
5. Work under said contract was completed on September 30, 1999, to the satisfaction of
the City Engineer, and was accepted by the City on November 9, 1999.
NOTICE OF COMPLETION
November 9, 1999 — Page 2
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES
CITY OF SANTA CLARITA )
I, Sharon L. Dawson, CMC, City Clerk of the City of Santa Clarita have read the
foregoing Notice of Completion and know its contents. I am authorized to make this
verification for and on its behalf, and I make this verification for that reason. I am
informed and believe and on that ground allege that the matters stated in the foregoing
document are true. I declare under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Sharon L. Dawson, CMC, City Clerk Date
City of Santa Clarita
MC:tw
comeffis2037amdoc
West Newhall Improvement Project - Phase 3 Project Location Map
73 PN°4b. GtP1BOURNE LN ___
09C� o-"'WDCE Ratk" 1"=1500'
IZO
'"�p9 6PRRNuim
Ro
.lyp'----------
FIRE
__ _PIKE 4 g 8�@
LACERrrA*N R s '{1TION
'0y HIGH S`Cq�HQO 0$, °^ QNr arc ' • .
p3 yxA$
MCry�RD O W
ftw
LODYRANCH
HART,
ONION HIGH S OL
SLP "a ♦ :Y!>;,y>i': ..,,.w
PV "4e
'd ,y✓ FD NEWHALL lei >:.. _ `�l
OLD O}lt u,, NY �' $ METROLINK .�� aas` 7n." > w }
OPPIN,�i R AV ay
STATION
LYON
i 'kAMV
cff# o
LYONS
STA O 4 awe°wanEw
mm y y 9, a uvuno°
9 ST S � � 4V pr. 1T A W C
W n 5? y gc O 3 p"
f° vAUF' EWH
Ommuri C)
HOSPI
d e
cn � �vF�
sG OR
J
uomXowwTON
RcwA++D cam++ pi 5T vc ti1m° y OAK CRE iK P
PARK&FD�Mry
��Jx p�apsw 4 8:� y wWw
CAV AV
y� 4� PAW°°OE �4a OR � •� `- .� � OP
� WEST LOT
ate &. wsim�.vrsTn3 Is � � K' ARK & RDE
EE
5'
,fY 'n
Street Network Property of Thomas Bros., 1999.
The City of Santa Clarita does not warrant $88$$S
the accuracy of the data and assumes no `
liability for any errors or omissions.
GIS6 u OR
Map created by GIS Divison 10/4/99. ' S~
v
LL
o
FrA
f
---
H
a CC i
i
ro' G r W J,
_
AV AtlM1f�4'i`
L a4 N-oA 3 $311H
A°r>
\
CAMP �-PL�i r
J
Jr
I
J
��
�nlf
-T,i�IY-I�
US
LU
F W. - a
i
,�
o
---j
`i` ��__`
4'.. - --_- 1.11
�
.�__.
•
._.
�. !.
11