HomeMy WebLinkAbout2000-10-10 - AGENDA REPORTS - ANNUAL OVERLAY CONTR AWARD (2)CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR City Manager Approval;
DATE:
October 10, 2000
Item to be presented by:
SUBJECT: 2000-01 ANNUAL OVERLAY PROGRAM, PROJECT NO. M0012 —
AWARD CONSTRUCTION CONTRACT AND AUTHORIZE A
CHANGE ORDER TO DESIGN CONSULTANT'S CONTRACT
DEPARTMENT: Transportation & Engineering Services
G_ • elm a •
City Council award the construction contract for the 2000-01 Annual Overlay Program,
Project No. M0012, to Granite Construction Company, Inc. in the amount of $991,767.00
and authorize a 15 percent contingency expenditure in the amount of $148,766.00.
Authorize a change order to the design contract of Pavement Engineering Inc. (PEI) to
include construction inspection in the amount of $53,285.00 and authorize a 15 percent
contingency expenditure of $7,993.00. Authorize the City Manager or designee to execute
all documents, subject to City Attorney approval.
The Annual Overlay Program will resurface various streets to provide a smoother ride for
traffic, enhance the appearance of the area, and extend the economic life of the roadway.
The streets to be included in this program are within the Canyon Country area. A General
Area map is located in Exhibit "A," and a list of streets for overlay is located in Exhibit "B."
On July 11, 2000, the City Council authorized the advertisement for bids for the
2000-01 Annual Overlay Program, Project No. M0012. On September 27, 2000, the
City Clerk's office received bids for the project (see Exhibit "C," Bid Results).
The Engineer's Estimate for the construction of this project is $1,300,000.00. The lowest
bid was submitted by Granite Construction Company, Inc. in the amount of $991,767.00.
After reviewing the bid summary, staff verified the apparent low bidder's contractors
license, sureties company, and project references. Based on the investigations, staff
recommends awarding the construction contract to Granite Construction Company, Inc.,
the lowest responsive bidder, in the amount of $991,767.00.
To ensure efficient and proper procedures in constructing the project, a full-time inspector
is required to deal with the day-to-day issues and to respond quickly to citizens' concerns
regarding the overlay project. These costs were anticipated and specifically identified in
A?PROVED Agenda lemIL'I
AWARD CONSTRUCTION CONTRACT
October 10, 2000 - Page 2
the Fiscal Year 2000-01 budget. PEI was responsible for the field review and
recommendations on the type of maintenance treatment for the streets scheduled in the
2000-01 Annual Overlay Program. Their familiarity with this project and extensive
experience in construction management and inspection will benefit the program. Staff
recommends adding construction inspection to the contract of PEI. The construction is
estimated to be completed in 30 working days, and the cost for the construction inspection
is $53,285.00.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The expenditure for the proposed 2000-01 Annual Overlay Program in the amount
$1,673,503.00 is funded in Fiscal Year 2000-01 in the following accounts:
M0012001-8001
M0012201-8001
M0012205-8001
TOTAL
UVWI; 619613 Y
Exhibit `A" — Area Map
Exhibit "B" — List of Streets for Overlay
Exhibit "C" - Bid Results
CA:tw
council \ overlay00awdcon.doc
$932,862.00
$296,315.00
$444.326.00
$1,673,503.00
�S S
d
y \
' fw uae oa• N R
L7V 3'
Ag R ;
yRV-W
A" i
rA G"K y"' fw
�E M'V)
^++ R a>74
OR $ 'vQ osscuoc ■ rc t �
04
H G b 4+7bo+G R• G amonor
Eism
aer
r ytaAM G AAV�
U 19 R, aw 3 IFn
F s"
ULM
zz
V Mr V' F Ci a.G
F i 'o= o �J
p
-6
kr
noan e
mmiNmf
G
R at
7w
+.m 4
sF'i-
u
7w
�< INN
S � rti6vn
yA. uaa
G IFus =
JAN 1Mvanu
o
1
U
Exhibit "B"
2000-01 Overlay Project
Street List
Street Name
Limits
Kent Lane
Florence Lane to Langside
Dorothy Street
130 west to ending
Langside Avenue
Ermine to Stanley
Meadowcreek Road
Ermine to Dorothy
Lakehurst Avenue
Ermine to 550 north
Calypso Lane
Ermine to 700 north
Ashboro Drive
Aldbury Street to 200 south
Ashboro Drive
Ermine to Whites Canyon
Steinway Street
Calypso lane to culdesac
Steinway Street
Whites Canyon to Hot Springs
Steinway Street
Langside Avenue to Whites Canyon
Ermine Street
Northbrook to Ashboro
Northbrook Avenue
Keaton to Ermine
Keaton Street
Aldbury to w/o Pine Hills
Keaton Street
Aldbury to Hardesty
Hardesty Avenue
Aldbury to 256 south
Hardesty Avenue
Aldbury Street to ermine
Hardesty Avenue
Steinway to 120 north
Dowell Drive
Steinway to 120 north
Steinway Street
Steinway to 120 north
Draisin Drive
Meadow Creek to Aldbury
Tenda Drive
Aldbury to 360 south
Rigel Drive
Aldbury to 220 south
Aldbury Street
Keaton to Glasser
Aldbury Street
Glasser to Camp Plenty
Glasser Avenue
Aldbury to Ermine
Aumond Avenue
Aldbury to Ermine
Lacomb Drive
Ermine to ending
North Ermine
Ermine to ending
Hot Springs Avenue
Wildwind Road to ending
Old Friend Road
Wildwind to Hot Springs
Wildwind Road
Hot Springs to Old Friend Road
Wildwind Road
Whites Canyon to Hot Springs Avenue
Walnut Springs Avenue
Wellhaven to Pleasantdale Street
Newhouse Street
Whites Canyon to Crossglade
Soldon Court
Thorley Court to end
Thorley Court
Ashboro to 418 south
Larbert Street
Hardesty to Ermine
V5VV-- 1-113 -41ZiNW
2000-01 ANNUAL OVERLAY PROGRAM
PROJECT NO. M0012
R.C. Becker & Son, Inc.
Granite Construction Co., Inc.
D.W. Burhoe Construction, Inc.
Excel Paving Company
Silvia Construction, Inc.
CA:tw
council \ over1ay00awdcon. doc
1 .3 113 4 *01_hi I-9
Amount Location
$1,252,940.60 Santa Clarita
$991,767.00 Watsonville
$1,153,857.83 Santa Paula
$1,054,806.25 Long Beach
$1,210,459.82 Rancho Cucamonga